What the public permit record shows, not self-reported reviews.
Is MANDREL CONSTRUCTION CO,INC a real contractor?
MANDREL CONSTRUCTION CO,INC appears in public building-permit records with 9 permits filed through 2024 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is MANDREL CONSTRUCTION CO,INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to MANDREL CONSTRUCTION CO,INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is MANDREL CONSTRUCTION CO,INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. MANDREL CONSTRUCTION CO,INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is MANDREL CONSTRUCTION CO,INC's work?
The most recent permit on record for MANDREL CONSTRUCTION CO,INC is dated 2024-05-20, with 9 permits on file in total.
FOR INTERIOR LEVEL 2 ALTERATIONS TO AN EXISTING KITCHEN IN A SCHOOL AS PER PLAN. NO CHANGE IN OCCUPANCY CLASSIFICATION.City of Philadelphia · 2024
FOR THE ERCTION OF A CANOPY OVER AN EXISTING SCHOOL BUILDING ENTRANCE.
ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2024
FOR LEVEL II ALTERATIONS TO AN EXISTING EDUCATION FACILITY, ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENT WITH REPAIRS THROUGHOUT AS SHOWN PER APPROVED PLANS. THIS IS AN EXISTING EDUCATION FACILITY, WITH ROOMS TO BE REPURPOSED THAT ARE ACCESSORY TO THE EDUCATION FACILITY. THE BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY, CONTACT THE DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
*Asbestos abatement required prior to commencement of work*City of Philadelphia · 2023
FOR THE ADDITION OF A CLASSROOM TRAILER AS PART OF AN EXISTING EDUCATIONAL FACILITY. WORK TO BE PERFORMED PER APPROVED PLANS. **IBC 2018**SEPARATE PERMITS REQUIRED FOR ANY MECHANICAL, ELECTRICAL AND PLUMBING WORK.City of Philadelphia · 2021
For the erection of a four (4) story detached structure to be used as a Group S-2 parking garage accessory to the existing Group E school on the same property, along with associated site improvements, as per plans; separate permits required for MEP/FSP work; building not required to be sprinklered; manual dry standpipes required to be installed within the exit stairways in accordance with NFPA 14; see AP#1006120 for zoning/use approval.City of Philadelphia · 2021
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you MANDREL CONSTRUCTION CO,INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to MANDREL CONSTRUCTION CO,INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
FOR LEVEL II ALTERATIONS TO AN EXISTING EDUCATION FACILITY ALTERATIONS TO INLCUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENT WITH REPAIRS THROUGHOUT AS SHOWN PER APPROVED PLANS. THIS IS AN EXISTING EDUCATION FACILITY, ROOMS TO BE REPURPOSED THAT ARE ACCESSORY TO EDUCATION FACILITY. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2020
FOR THE ERECTION OF A FOUR (4) STORY DETACHED STRUCTURE; FOR USE AS AN EDUCATIONAL FACILITY AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.City of Philadelphia · 2019
INTERIOR ALTERATIONS (PRESCRIPTIVE METHOD) FOR FIT OUT TO CREATE A GROUP MEDICAL, DENTAL AND HEALTH PRACTITIONER OFFICE. SEPARATE PERMIT REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.City of Philadelphia · 2019
DEMOLITION OF EXISTING HVAC SYSTEMS AND INSTALLATION OF NEW HVAC SYSTEM FOR FIVE (5) COMBINED TENANT SPACES (SUITE 3000H) IN AN EXISTING SHOPPING CENTER AS PER APPROVED PLANS.City of Philadelphia · 2018
Permitted projects on public record. Addresses are omitted for privacy.