What the public permit record shows, not self-reported reviews.
Is LP Construction Services a real contractor?
LP Construction Services appears in public building-permit records with 6 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is LP Construction Services's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to LP Construction Services by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is LP Construction Services licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. LP Construction Services has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is LP Construction Services's work?
The most recent permit on record for LP Construction Services is dated 2026-04-07, with 6 permits on file in total.
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO SECOND FLOOR TOILET ROOMS WITHIN AN EXISTING HIGHER EDUCATIONAL FACILITY (MOORE SCHOOL - D-2) AS PER APPROVED PLANS. EXISTING BUILDING NOT REQUIRED TO BE SPRINKLERED. *2018 IEBC REVIEW*
**SEPARATE PERMITS REQUIRED FOR ANY MEP WORK**City of Philadelphia · 2026
FOR A LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY) TO BASEMENT OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE REMODELING OF CLASSROOMS, PROVIDE FINISHES AND FURNISHINGS THROUGHOUT AS PER APPROVED PLANS. ** ALL WORK TO BE DONE PER APPROVED PLANS. ** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2018**EXISTING BUILDING IS FULLY SPRINKLERED** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**City of Philadelphia · 2026
Interior alterations to existing university building as per approved plans. Asbestos remediation required prior to start of other works.City of Philadelphia · 2025
FOR REPAIRS TO A PORTION OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**ASBESTOS REMEDIATION REQUIRED PRIOR TO START OF WORK**City of Philadelphia · 2024
FOR THE INSTALLATION OF APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. *NO REGISTERS, DIFFUSERS ON THIS PERMIT.City of Philadelphia · 2024
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you LP Construction Services?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to LP Construction Services's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) TO THE 4TH AND 5TH FLOOR OF AN EXISTING BUILDING
(McNeil Building, C-6, Building ID 1531836) AS PER APPROVED PLANS. **SEPARATE PERMITS REQUIRED FOR ANY MECHANICAL, ELECTRICAL, PLUMBING OR FIRE SUPPRESSION WORK**
City of Philadelphia · 2024
Permitted projects on public record. Addresses are omitted for privacy.