What the public permit record shows, not self-reported reviews.
Is LNHA New Homes LLC a real contractor?
LNHA New Homes LLC appears in public building-permit records with 38 permits filed through 2025 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is LNHA New Homes LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to LNHA New Homes LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is LNHA New Homes LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. LNHA New Homes LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is LNHA New Homes LLC's work?
The most recent permit on record for LNHA New Homes LLC is dated 2025-04-02, with 38 permits on file in total.
FOR A NEW CONSTRUCTION OF A THREE-STORY WOOD-FRAME ATTACHED STRUCTURE ON REINFORCED CONCRETE FOOTINGS/FOUNDATIONS WITH A ROOF DECK AND ONE (1) INTERIOR GARAGE PARKING SPACE. FOR USE AS A SINGLE-FAMILY DWELLING THROUGHOUT. BUILDING SHALL BE FULLY SPRINKLERED PER NFPA13D. ** MECHANICAL, ELECTRICAL, PLUMBING ANND EXCAVATION REVIEWSINCLUDED**SEPARATE PERMITS REQUIRED FOR ALL FIRE SUPPRESSION SYSTEMS. **PROTECTION OF RIGHT-OF-WAY / PEDESTRIANS / ADJACENT PROPERTIES REQUIRED DURING ALL CONSTRUCTION.**ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.**City of Philadelphia · 2025
FOR THE ERECTION OF AN ATTACHED BUILDING WITH ROOF DECK ACCESSED BY A PILOTHOUSE. FOR USE AS A SINGLE FAMILY HOUSEHOLD LIVING WITH ONE INTERIOR PARKING SPACE ACCESSED FROM THE COMMOM DRIVEWAY. BUILDING TO BE FULLY SPRINKLERED. SEPARATE PERMITS REQUIRED FOR MEP & FP WORK.City of Philadelphia · 2025
NEW CONSTRUCTION OF AN ATTACHED STRUCTURE TO INCLUDE PILOT HOUSE AND ROOF DECK FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2025
MAKE SAFE TO COMPLY CF-2023-018749, PER ENGINEERS REPORT & PLANS, for a front wall bulge and star bolts installed without an engineers report.City of Philadelphia · 2023
FOR NEW CONSTRUCTION OF A THREE-STORY WOOD-FRAME ATTACHED STRUCTURE ON REINFORCED CONCRETE FOOTINGS/FOUNDATIONS WITH A ROOF DECK AND A ROOF DECK ACCESS STRUCTURE. FOR USE AS A VACANT COMMERCIAL SPACE SPACE AT THE FIRST FLOOR AND TWO-FAMILY HOUSEHOLD LIVING . BUILDING SHALL BE FULLY SPRINKLERED AS PER NFPA 13 IN THE COMMERCIAL SPACE AND NFPA 13R IN THE RESIDENTIAL PORTION. SEPARATE PERMITS REQUIRED FOR ALL MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION SYSTEMS. **PROTECTION OF RIGHT-OF-WAY / PEDESTRIANS / ADJACENT PROPERTIES REQUIRED DURING ALL CONSTRUCTION.**ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC.** AMENDED AS OF 12/18/2023 FOR A ADA RAMP ADDITION TO THE FIRST FLOOR PER APPROVED PLANS**IF FIELD CONDITIONS VARY, CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.** FOR AN UPDATE IN SPECIAL INSPECTION DOCUMENTATION**
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you LNHA New Homes LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to LNHA New Homes LLC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2022
FOR NEW CONSTRUCTION OF AN ATTACHED, THREE-STORY STRUCTURE OF TYPE VB CONSTRUCTION WITH A CELLAR AND A ROOF DECK AND A ROOF DECK ACCESS STRUCTURE. FOR USE AS A VACANT COMMERCIAL SPACE SPACE AT THE FIRST FLOOR AND TWO-FAMILY HOUSEHOLD LIVING . BUILDING SHALL BE FULLY SPRINKLERED AS PER NFPA 13 IN THE COMMERCIAL SPACE AND NFPA 13R IN THE RESIDENTIAL PORTION. SEPARATE PERMITS REQUIRED FOR ALL MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION SYSTEMS. **PROTECTION OF RIGHT-OF-WAY / PEDESTRIANS / ADJACENT PROPERTIES REQUIRED DURING ALL CONSTRUCTION.**ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC.**
AMENDMENT (12/27/2023) TO ADD AN ACCESSIBLE RAMP WITHIN THE COMMERCIAL SPACE ON THE GROUND FLOOR AS PER PLANS.
AMENDMENT (1/22/2024) TO CHANGE SPECIAL INSPECTION AGENCY AS PER REVISED DOCUMENTS.City of Philadelphia · 2022
For the erection of a four (4) story attached structure (w/roof deck and pilot house enclosing access stairs only), to be used as Group R-2 (Five (5) Dwelling Units), as per plans; separate permits required for all MEP/FSP work; building to be fully sprinklered throughout in accordance with NFPA 13 and w/standpipes installed in accordance with NFPA 14 within the exit stairways; covered walkway or sidewalk enclosure shall be required within 9.5 feet of the building facade in accordance with Section 3306 in the 2018 IBC; fire watch is required once combustible construction is over 40 feet in height, site safety plan shall be submitted to building inspector prior to start of construction over 40 feet; see ZP-2020-010036 for zoning/use approval.City of Philadelphia · 2021
FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS TWO-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2021
FOR NEW CONSTRUCTION OF A FOUR-STORY BUILDING WITH CELLAR, ROOF DECKS AND ROOF-DECK ACCESS STRUCTURES. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13R AND STANDPIPES PER NFPA 14. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION.
*10-18-22 AMEND UNIT #1 TO BE BI-LEVEL*City of Philadelphia · 2021
FOR THE CONSTRUCTION OF A THREE-STORY STRUCTURE WITH PILOTHOUSE AND ROOF DECK WITH 42-INCH GUARD RAILS, FOR A SINGLE-FAMILY DWELLING, AS PER APPROVED PLANS.City of Philadelphia · 2021
NEW CONSTRUCTION OF A THREE (3) STORY TWO-FAMILY DWELLING (IRC 2015 TOWNHOUSE CONSTRUCTION) WITH ROOF DECK AND PILOTHOUSE (FOR ACCESS TO ROOF DECK) AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13D.
**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**City of Philadelphia · 2021
**AMENDMENT DATED 3/22/2022; RAISED HEIGHT OF BUILDING TO 34'-9" TO REFLECT FIELD CONDITIONS, TO REMOVE UNDERPINNING FROM SCOPE OF WORK, AND TO CHANGE SPECIAL INPSECTION AGENCY**
FOR THE ERECTION OF AN ATTACHED THREE (3) STORY STRUCTURE WITH ROOF ACCESS STRUCTURE FOR ACCESS TO ROOF DECK. STRUCTURE FOR USE AS MULTI-FAMILY HOUSEHOLD LIVING THREE (3) DWELLING UNITS. BUILDING IS FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13R. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 9.5 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.** SEPARATE PERMIITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2021
Permitted projects on public record. Addresses are omitted for privacy.