Is LATINO THE DEMOLITION INC a real contractor?
LATINO THE DEMOLITION INC appears in public building-permit records with 43 permits filed through 2018 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is LATINO THE DEMOLITION INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to LATINO THE DEMOLITION INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is LATINO THE DEMOLITION INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. LATINO THE DEMOLITION INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is LATINO THE DEMOLITION INC's work?
The most recent permit on record for LATINO THE DEMOLITION INC is dated 2018-10-24, with 43 permits on file in total.
FOR THE COMPLETE DEMOLITION OF AN EXISTING ATTACHED THREE (3) STORY MASONRY STRUCTURE.STRUCTURE TO BE DEMOLISHED BY HAND ONLY. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR SIDEWALK CLOSURE.City of Philadelphia · 2018
EZ INTERIOR DEMOLITION- FOR THE INTERIOR DEMOLITION ON NON-BEARING PARTITION WALL AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS.City of Philadelphia · 2018
FOR THE COMPLETE DEMOLITION OF AN EXISTING, SEMI-DETACHED, THREE (3) STORY STRUCTURE. STRUCTURE TO BE DEMOLISHED BY HAND AND WITH HAND HELD TOOLS ONLY. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES.
* A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 9 FEET OF BUILDING FAÇADE IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED.
* 21 DAY POSTING WAIVED - DANGEROUS CASE (CASE NO 652048)City of Philadelphia · 2018
TO ADDRESS IMMINENTLY DANGEROUS L&I CASE #654370 FOR STRUCTURALLY UNSAFE SIDE WALLS AND FLOORS; FOR THE COMPLETE DEMOLITION OF AN EXISTING MASONRY-AND-WOOD FRAMED, THREE (3) STORY, MIXED USE ATTACHED STRUCTURE (INCLUDING BREAK-UP OF FOUNDATION SLAB), BY HAND AND WITH HAND-HELD TOOLS ONLY, AS PER SUBMITTED PLANS AND DOCUMENTS; PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED AT ALL TIMES DURING ALL DEMOLITION ACTIVITIES.
* ASBESTOS ABATEMENT REQUIRED PRIOR TO START OF DEMOLITION ACTIVITIES.
* A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 8 FEET OF BUILDING FAÇADE, IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED.
* 21 DAY NOTICE/POSTING WAIVED DUE TO ID CASE.
* NEWLY EXPOSED WALLS TO BE TREATED.City of Philadelphia · 2018
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you LATINO THE DEMOLITION INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to LATINO THE DEMOLITION INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
TO ADDRESS IMMINENTLY DANGEROUS L&I CASE #654370 FOR STRUCTURALLY UNSAFE SIDE WALLS AND FLOORS; TO DOCUMENT THE COMPLETE DEMOLITION OF AN EXISTING ATTACHED STRUCTURE; SEE AP#916183 FOR ALL PLANS/DOCUMENTS.
FOR USE AS VACANT LOT.City of Philadelphia · 2018
FOR THE COMPLETE DEMOLITION OF AN EXISTING STRUCTURE.
VACANT LOT. SEPARATE PERMIT REQUIRED FOR USE OR DEVELOPMENT OF PROPERTY.City of Philadelphia · 2018
FOR THE COMPLETE DEMOLITION OF AN EXISTING ATTACHED TWO (2) STORY MASONRY STRUCTURE.STRUCTURE TO BE DEMOLISHED BY HAND ONLY. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR SIDEWALK CLOSURE.City of Philadelphia · 2018
EZ INTERIOR DEMOLITION- FOR THE INTERIOR DEMOLITION ON NON-BEARING PARTITION WALL AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS.City of Philadelphia · 2018
FOR THE COMPLETE DEMOLITION OF AN EXISTING ATTACHED TWO (2) STORY MASONRY STRUCTURE.STRUCTURE TO BE DEMOLISHED HAND ONLY. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR SIDEWALK CLOSURE.City of Philadelphia · 2018
FOR THE COMPLETE DEMOLITION OF AN EXISTING, ATTACHED, THREE (3) STORY STRUCTURE. STRUCTURE TO BE DEMOLISHED BY HAND AND WITH HAND HELD TOOLS ONLY. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES.
* A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 8 FEET OF BUILDING FAÇADE IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED.
* NEWLY EXPOSED WALLS TO BE TREATED
* DEMOLITION PERMITTED TO BEGIN IMMEDIATELY (SUBJECT OF ZBA APPEAL)City of Philadelphia · 2018
IN ACCORDANCE WITH CODE BULLETIN PM-1801, A PA PROFESSIONAL ENGINEER IS REQUIRED TO MONITOR REPAIRS MADE UNDER THIS PERMIT. THE ENGINEER MUST SUBMIT A SEALED STATEMENT TO THE DEPARTMENT CONFIRMING THAT THE STRUCTURE IS IN SOUND CONDITION AT COMPLETION." MAKE SAFE PERMIT - FOR PARTIAL DEMOLITION OF (2) TWO STORY SECTION AND (1) ONE STORY SECTION AT REAR AS PER ENGINEER'S REPORT TO RESOLVE CASE #623852. ABUTTING SIDEWALK MUST BE CLOSED WITH FENCING A MINIMUM OF 6' IN HEIGHT. SEPARATE STREETS DEPARTMENT PERMIT REQUIRED FOR SIDEWALK CLOSURE. A SEPARATE PERMIT IS REQUIRED FOR ANY ADDITIONAL ALTERATIONS THAT ARE NOT SPECIFICALLY ADDRESSED ON CASE #623852.City of Philadelphia · 2018
COMPLETE DEMOLITION OF EXISTING BUILDING BY HAND. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. FULL SIDEWALK CLOSURE REQUIRED AS REFLECTED ON APPROVED SITE PLAN AND IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE STREET CLOSURE PERMIT REQUIRED PRIOR TO START OF WORK.City of Philadelphia · 2018
Permitted projects on public record. Addresses are omitted for privacy.