What the public permit record shows, not self-reported reviews.
Is LANDMAR ENTERPRISES INC a real contractor?
LANDMAR ENTERPRISES INC appears in public building-permit records with 12 permits filed through 2025 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is LANDMAR ENTERPRISES INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to LANDMAR ENTERPRISES INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is LANDMAR ENTERPRISES INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. LANDMAR ENTERPRISES INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is LANDMAR ENTERPRISES INC's work?
The most recent permit on record for LANDMAR ENTERPRISES INC is dated 2025-01-28, with 12 permits on file in total.
INTERIOR ALTERATION TO PARTIAL FIRST FLOOR OF AN EXISTING STRCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2025
MAKE SAFE PERMIT TO COMPLY WITH CF-2021-057564 TO INCLUDE REPAIRS TO CONCRETE/MASONRY FLOORS, WALLS AND COLUMNS PER APPROVED PLANS AND IN ACCORDANCE WITH CODE BULLETIN PM-1801. LICENSED PA PROFESSIONAL ENGINEER IS REQUIRED TO MONITOR REPAIRS MADE UNDER THIS PERMIT. THE ENGINEER MUST SUBMIT A SEALED STATEMENT TO THE DEPARTMENT CONFIRMING THAT THE STRUCTURE IS IN SOUND CONDITION AT COMPLETION. SEPARATE PERMITS REQUIRED FOR ADDITIONAL ALTERATIONS NOT ADDRESSED IN APPROVED PLANS.City of Philadelphia · 2021
INSTALLATION OF NEW HVAC SYSTEM FOR FIRST FLOOR FITNESS CENTER TO INCLUDE DUCTWORK AND EXHAUST FAN AS PER APPROVED PLANS.City of Philadelphia · 2019
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of new ductwork,
registers/grilles/diffusers, and warm-air appliances as per attached standard. Deviations from
this standard will result in permit revocation and require submission of construction plans.City of Philadelphia · 2018
FOR INTERIOR ALTERATIONS TO EXISTING SPACE TO INCLUDE NEW INTERIOR PARTITIONS AND INTERIOR FINISHES, AS PER APPROVED PLANS. *NO WORK TO EXTERIOR PER PHC*City of Philadelphia · 2018
SOLE PRACTITIONER OFFICECity of Philadelphia · 2018
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you LANDMAR ENTERPRISES INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to LANDMAR ENTERPRISES INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
FOR THE ERECTION OF A ROOF COVERING OVER AN EXISTING STONE FRONT ENTRANCEWAY PER SUBMITTED PLAN AND HISTORICAL COMMISSION APPROVAL.City of Philadelphia · 2016
INTERIOR ALTERATIONS PER PLANS, 34TH FLOORCity of Philadelphia · 2011
10"EXHAUSTED DUCT AND 4" DRYER DAMMPER IN UNIT 16A ONLY.City of Philadelphia · 2010
INTERIOR RENOVATIONS TO EXISTING APARTMENT UNIT 1833 A.City of Philadelphia · 2010
REPLACE/MODERNIZATION OF EXISTING KITCHEN;REPLACEMENT OF WATER DAMAGED FINISHES IN FELLOWSHIP HALL & KITCHEN;INSTALLATION OF NEW METAL STUDS & DRYWALL PARTITIONS;INSTALL NEW ACT. CEILING.City of Philadelphia · 2008
REPLACE BRICK VENEER ON EAST WALL FOR AN EXISTING HEALTH FACILITY APOPROX 450 SQ. FT..REMOVE ALL LOSE AND DEFECTIVE BRICK FROM AROUND THE OPENING. TOOTH OUT AND REMOVE THE BRICK AND MORTAR FROM THE PERIMETER. RECONSTRUCT WITH NEW BRICK TO MATCH THE EXISTING. INSTALLING BRICK TIES EVERY 3RD COARSE 24" ON CENTER. MECHANICALLY FASTEN TO CONCRETE BEAMS AND EXISTING SUBSTRATE. TYPE S MORTAR FOR ALL REPAIR WORK.City of Philadelphia · 2007
Permitted projects on public record. Addresses are omitted for privacy.