What the public permit record shows, not self-reported reviews.
Is KOPACE LLC a real contractor?
KOPACE LLC appears in public building-permit records with 16 permits filed through 2013 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is KOPACE LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to KOPACE LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is KOPACE LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. KOPACE LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is KOPACE LLC's work?
The most recent permit on record for KOPACE LLC is dated 2013-11-25, with 16 permits on file in total.
LEVEL I INTERIOR ALTERATIONS TO UPDATE FINISHES, CONSTRUCT A SEPARATING, NON-BEARING PARTITION & BATHROOM DOOR, AND FOR UPDATES TO EXTERIOR FINISHES. SEPARATE PERMITS FOR ELECTRICAL, PLUMBING AND MECHANICAL SYSTEMS.City of Philadelphia · 2013
AMEND PERMIT NUMBER 454951 FOR REVISED FIRST FLOOR PLAN TO REFLECT EXISTING SITE CONDITIONS.City of Philadelphia · 2013
AMEND PERMIT NUMBER 454953 FOR REVISED FIRST FLOOR PLAN TO REFLECT EXISTING SITE CONDITIONS.City of Philadelphia · 2013
AGREES TO LIMIT THE CONSTRUCTION TO COMPLY WITH EZ PERMIT STANDARD FOR INTERIOR ALTERATIONS, DATED JANUARY 2011. DEVIATIONS FROM THIS STANDARD WILL RESULT IN THE REVOCATION OF THIS PERMIT AND IMPOSITION OF FURTHER PENALTIES." SEPARATE PERMITS REQUIRED FOR PLUMBING, ELECTRICAL AND MECHANICAL WORKCity of Philadelphia · 2013
REPLACE THREE ROOMS DRYWALL AND PAINT REPLACE TWO ROOMS CARPET.. NO STRUCTURAL CHANGECity of Philadelphia · 2013
INSTALLATION OF HERD WOOD FLOORS, PAINTING AND STAIR TREAD ATTACHMENT.City of Philadelphia · 2013
AGREES TO LIMIT THE CONSTRUCTION TO COMPLY WITH EZ PERMIT STANDARD FOR INTERIOR ALTERATIONS, DATED JANUARY 2011. DEVIATIONS FROM THIS STANDARD WILL RESULT IN THE REVOCATION OF THIS PERMIT AND IMPOSITION OF FURTHER PENALTIES." SEPARATE PERMITS REQUIRED FOR PLUMBING, ELECTRICAL AND MECHANICAL WORK
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you KOPACE LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2013
REPAIR AND STUCCO OUTSIDE WALLCity of Philadelphia · 2013
RENOVATIONS TO THE 2ND, 3RD, 4TH AND 5TH FLOOR APARTMENT UNITS AS PER PLANS TO INCLUDE NEW EXTERIOR WALLS TO CLOSE OFF EXISTING WINDOWS; NO CHANGE TO NUMBER OF UNITS. MECHANICAL VENTILATION TO THE EXTERIOR OF THE BUILDING REQUIRED IN EACH UNIT. SEPARATE ELECTRICAL PERMIT REQUIRED.City of Philadelphia · 2013
INTERIOR ALTERATIONS AS PER PLANS TO CELLAR AND FIRST FLOOR.City of Philadelphia · 2013
INSTALLATION OF WINDOWS IN EXISTING OPENINGS. REMOVAL AND REPLACEMENT OF DRYWALL, KITCHEN CABINETS AND FLOORS. REPLACE DOWNSPOUT REAR OF HOUSE. APPLICANT AGREES TO LIMIT THE CONSTRUCTION TO COMPLY WITH EZ PERMIT STANDARD FOR INTERIOR ALTERATIONS, DATED JANUARY 2011. DEVIATION FROM THE STANDARD WILL RESULT IN REVOCATION OF THIS PERMIT AND IMPOSITION OF FURTHER PENALTIES. SEPARATE PERMITS FOR PLUMBING AND ELECTRICAL IF REQUIRED.City of Philadelphia · 2013
MAKE SAFE PERMIT PER ENGINEERS REPORT AND ATTACHED LIST OF REPAIRS AND DESCRIPTION OF WORK. PHC STAFF REVIEW STUCCO SAMPLE FOR COLOR AND TEXTURECity of Philadelphia · 2013
Permitted projects on public record. Addresses are omitted for privacy.