Is KENNETH SOWISDRAL (Ken Sowisdral SR INC) legit?
What the public permit record shows, not self-reported reviews.
Is KENNETH SOWISDRAL (Ken Sowisdral SR INC) a real contractor?
KENNETH SOWISDRAL (Ken Sowisdral SR INC) appears in public building-permit records with 17 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is KENNETH SOWISDRAL (Ken Sowisdral SR INC)'s track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to KENNETH SOWISDRAL (Ken Sowisdral SR INC) by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is KENNETH SOWISDRAL (Ken Sowisdral SR INC) licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. KENNETH SOWISDRAL (Ken Sowisdral SR INC) has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is KENNETH SOWISDRAL (Ken Sowisdral SR INC)'s work?
The most recent permit on record for KENNETH SOWISDRAL (Ken Sowisdral SR INC) is dated 2026-01-05, with 17 permits on file in total.
- For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Separate permits are required for plumbing and electrical work and the installation of heating/cooling appliances. STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/ROOF FRAMING OR FOUNDATIONS; INCLUDING UNDERPINNING, EXCAVATION, AND REMOVAL OF FOUNDATION SLAB.
***NO WORK MAY BE PERFORMED IN THE BASEMENT OR CELLAR.*** Separate permits required for Mechanical, Electrical, and Plumbing workCity of Philadelphia · 2026
Install new full bath on first floor, Details as shown on the plan. no structural work included.City of Philadelphia · 2025
FOR A LEVEL I INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY ) FOR THE FIRST FLOOR AND BASEMENT LEVEL OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2018** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**City of Philadelphia · 2025
FOR STRUCTURAL REPAIR OF THE EXISTING ROOFTOP DECK (AS PREVIOUSLY APPROVED); FOR ERECTION OF THREE STAR BOLTS ON BRICK WALL AND STRUCTURAL REPAIR OF GARAGE ALL AS PART OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS.City of Philadelphia · 2024
Interior renovation of one bathroom. details as shown on plan.City of Philadelphia · 2023
kitchen renovation and widening of kitchen access, details as shown on plan.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you KENNETH SOWISDRAL (Ken Sowisdral SR INC)?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to KENNETH SOWISDRAL (Ken Sowisdral SR INC)'s website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2023
EZ PERMIT STANDARDS ALTERATIONS
For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/ROOF FRAMING OR FOUNDATIONS, UNDERPINNING AND EXCAVATIONS (I.E. DIGGING IN BASEMENT). ANY WORK/ALTERATIONS TO THE BASEMENT/CELLAR IS EXPRESSLY PROHIBITED UNLESS DOCUMENTED AS AN EXISTING HABITABLE SPACE WITH HEIGHTS AND MEANS OF EGRESS PER CONDITIONS OF THE EZ STANDARD. Separate permits required for Mechanical, Electric and Plumbing, ETC.
*NO BASEMENT ALTERATIONS OF ANY KIND WERE PROPOSED OR APPROVED FOR THIS PERMIT*
*NO STRUCTURAL ALTERATIONS OF ANY KIND WERE PROPOSED OR APPROVED FOR THIS PERMIT*
Renovate the 2nd and 3rd floor of the house. 2 New bathrooms and a laundry room and closets to 4 of the existing bedrooms. Drywall and plaster repair, throughout both floors. Also renovate the living room on the 1st floor remove some moldings and repair walls and the ceiling.City of Philadelphia · 2022
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES
For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
Install a new Carrier 92% gas furnace,3 ton 16 seer Carrier a/c coil & condenser, new ductwork, & 9 new registers.
Historical Commission approves this application with the condition that the scope of work is interior only. No work to exterior.City of Philadelphia · 2022
EZ PERMIT STANDARDS ALTERATIONS
For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/ROOF FRAMING OR FOUNDATIONS, UNDERPINNING AND EXCAVATIONS (I.E. DIGGING IN BASEMENT). ANY WORK/ALTERATIONS TO THE BASEMENT/CELLAR IS EXPRESSLY PROHIBITED UNLESS DOCUMENTED AS AN EXISTING HABITABLE SPACE WITH HEIGHTS AND MEANS OF EGRESS PER CONDITIONS OF THE EZ STANDARD. Separate permits required for Mechanical, Electric and Plumbing, ETC.
Renovate 2 bathrooms and build 3 new closets on the 2nd and 3rd floor. there will be no structural changes and there will be no work in the basement .City of Philadelphia · 2022
EZ PERMIT STANDARDS ALTERATIONS – For alterations to an Existing Philadelphia Historic Property - Single Family Dwelling Property as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Structural alteration or repair is expressly prohibited under this permit. Prohibited structural work any modifications to exterior walls, party walls, floor/roof framing or foundations, including underpinning, excavation, and removal of foundation slab. NO WORK MAY BE PERFORMED IN THE BASEMENT OR CELLAR. Separate permits required for Mechanical, Electric and Plumbing. This permit is for the Alterations approved by the Philadelphia Historic Commission as follows: Interior Renovations only. new kitchen and a new bathroom, drywall all walls and ceilings on the 1st and 2nd floor. Insulate the exterior walls and roof area. New trim and interior doors on both the 1st and 2nd floor to follow interior alterations standards, No work to the exterior, no work to exterior doors or windows.City of Philadelphia · 2022
FOR INTERIOR ALTERATIONS TO AN EXISTING THREE-STORY ATTACHED STRUCTURE AS PER APPROVED PLAN; FOR CONTINUED USE AS SINGLE-FAMILY HOUSEHOLD LIVING. *SEPARATE PERMITS REQUIRED FOR ELECTRICAL, PLUMBING, AND MECHANICAL WORK* **UNDERPINNING IS NOT PART OF THIS PERMIT**City of Philadelphia · 2022
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. (installation of 1- 80,000 btu 92% Carrier gas furnace with 3 ton 16 seer Carrier a/c condenser and coil. installation of a 1200 cfm duct system with 10 supply and 4 return registers to condition the new addition).City of Philadelphia · 2022
Permitted projects on public record. Addresses are omitted for privacy.