What the public permit record shows, not self-reported reviews.
Is KEITH PRYER a real contractor?
KEITH PRYER appears in public building-permit records with 6 permits filed through 2017 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is KEITH PRYER's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to KEITH PRYER by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is KEITH PRYER licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. KEITH PRYER has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is KEITH PRYER's work?
The most recent permit on record for KEITH PRYER is dated 2017-05-11, with 6 permits on file in total.
MAKE SAFE PERMIT - PERMIT APPLICATION IN RESPONSE TO UNSAFE VIOLATIONS. TO COMPLY VIOLATION, COMPLETED WORK IS TO BE INSPECTED AND APPROVED AS AN APPROPRIATE REPAIR TO EACH VIOLATION. ENGINEER'S REPORT SUBMITTED. REMOVE REAR 2 STORY ADDITION BY HAND. PROTECT ADJOINING PROPERTY DURING THIS PROCESS. REPAIR/REPLACE LOOSE AND MISSING BRICKS EXTERIOR FRONT WALL.
LICENSED CONTRACTOR TO ASSUME RESPONSIBILITY OF WORK.
NO OTHER WORK THIS PERMIT. SEPARATE PERMITS REQUIRED FOR RENOVATION.
*PERMIT RECEIVED FROM DOWNSTAIRS 5/15/17*City of Philadelphia · 2017
AMENDMENT TO PERMIT #668602 NEW SIDEWALK RAMP PER ATTACHED DRAWINGS NO WORK TO ACTUAL BUILDING.City of Philadelphia · 2016
FOR THE NEW CONSTRUCTION OF A THREE STORY STRUCTURE WITH CELLAR AND ROOF DECK TO BE USED AS VACANT COMMERCIAL SPACE ON CELLAR AND FIRST FLOOR (SEPARATE CERTIFICATE OF OCCUPANCY PERMIT REQUIRED PIOR TO OCCUPANCY) AND TWO (2) DWELLING UNITS ON THE SECOND AND THIRD FLOORS, AS PER APPROVED PLANS. ROOF DECK ACCESSORY TO DWELLING UNIT #2.City of Philadelphia · 2016
EXCAVATION AND FOUNDATION INSTALLATION AS PER PLANS. ALL PEDESTRIAN PROTECTION MEASURES & EQUIPMENT &/OR STREET CLOSURES TO BE IN-PLACE PRIOR TO COMMENCEMENT OF ANY PERMITTED WORK.City of Philadelphia · 2016
EXCAVATION AND FOUNDATION INSTALLATION AS PER PLANS. ALL PEDESTRIAN PROTECTION MEASURES & EQUIPMENT &/OR STREET CLOSURES TO BE IN-PLACE PRIOR TO COMMENCEMENT OF ANY PERMITTED WORK.City of Philadelphia · 2016
EZ PERMIT STADARD ALTERATIONS- For alterations to an existing one family dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you KEITH PRYER?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.