What the public permit record shows, not self-reported reviews.
Is K Group, Inc. a real contractor?
K Group, Inc. appears in public building-permit records with 20 permits filed through 2019 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is K Group, Inc.'s track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to K Group, Inc. by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is K Group, Inc. licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. K Group, Inc. has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is K Group, Inc.'s work?
The most recent permit on record for K Group, Inc. is dated 2019-09-03, with 20 permits on file in total.
For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/ROOF FRAMING OR FOUNDATIONS; UNDERPINNING AND EXCAVATIONS (I.E. DIGGING IN BASEMENT). NO WORK PERMITTED IN BASEMENT AS CELLERCity of Philadelphia · 2019
INTERIOR ALTERATIONS THROUGHOUT EXISTING THREE STORY BUILDING TO ESTABLISH BUSINESS AND PROFESSIONAL OFFICE ON THE GROUND FLOOR AND TWO DWELLING UNITS ON THE SECOND AND THIRD FLOORS AS PER APPROVED PLANS. FOR ISSUANCE OF CERTIFICATE OF OCCUPANCY.
* 2009 IBC *City of Philadelphia · 2019
BRICK WALL REPAIR INTERIOR NON STRUCTURAL REPAIRS TO KITCHEN DRYWALL FLOORING TILE AND FINISHESCity of Philadelphia · 2018
- FOR THE INTERIOR DEMOLITION ON NON-BEARING PARTITION WALL AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS.City of Philadelphia · 2018
INTERIOR DEMOLITION AND ALTERTION TO 2ND FLOOR BATHROOM.
NO WORK TO EXTERIOR AS PER PHILADELPHIA HISTORICAL COMMISSION.City of Philadelphia · 2017
EZ ALTERATIONS - EZ PERMIT STADARD ALTERATIONS- FOR ALTERATIONS TO AN EXISTING ONE FAMILY DWELLING AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.. LICENSED CONTRACTOR TO BE LISTED ON PERMIT
SEPARATE PERMITS REQUIRED FOR PLUMBING, ELECTRIC AND HVAC.
CALL INSPECTOR AT DISTRICT OFFICE AT LEAST 24 HOURS PRIOR TO STARTING WORK. CONTRACTOR HAS NO EMPLOYEES PER NOTARIZED LETTER, ALLWORKERS ON SITE MUST HAVE THEIR OWN LICENSES AND INSURANCE.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you K Group, Inc.?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2017
EZ PERMIT STADARD ALTERATIONS- FOR ALTERATIONS TO AN EXISTING ONE FAMILY DWELLING AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.City of Philadelphia · 2016
INTERIOR ALTERATIONS AS PER EZ STANDARDSCity of Philadelphia · 2014
EXTENSION OF TIME FOR PERMIT #389881City of Philadelphia · 2014
REMOVE EXISTING REAR ENTRY DOOR AND WINDOWS AT THE GROUND LEVEL, INSTALL NEW FRENCH DOORS AND WOOD STEPS TO BACK YARDCity of Philadelphia · 2013
ALTERATIONS AND ADDITION PER PLANCity of Philadelphia · 2012
RENOVATION OF EXISTING PHILLY ROW HOME 1ST AND 2ND FLOOR ADDITION FOR SFD.City of Philadelphia · 2012
Permitted projects on public record. Addresses are omitted for privacy.