What the public permit record shows, not self-reported reviews.
Is JOTTAN INC a real contractor?
JOTTAN INC appears in public building-permit records with 37 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is JOTTAN INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to JOTTAN INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is JOTTAN INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. JOTTAN INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is JOTTAN INC's work?
The most recent permit on record for JOTTAN INC is dated 2026-03-03, with 37 permits on file in total.
FOR LEVEL II ALTERATION TO INCLUDE RE-ROOFING, CONCRETE REPAIRS, AND STRUCTURAL WORK AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR MEP WORK. *ASBESTOS ABATEMENT REQUIRED PRIOR TO START OF WORK.*City of Philadelphia · 2026
LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING BUS DEPOT TO INCLUDE ROOF REPLACEMENT AND INTERIOR WORK AS PER APPROVED PLANS. *2018 IEBC REVIEW*
**SEPARATE PERMITS REQUIRED FOR ANY MEP WORK**City of Philadelphia · 2026
MAKE SAFE PERMIT TO COMPLY WITH CASE VIOLATION CF-2022-115905 TO INCLUDE ROOF/WALL REPAIRS PER APPROVED PLANS, ENIGINEERS REPORT AND IN ACCORDANCE WITH CODE BULLETIN PM-1801. LICENSED PA PROFESSIONAL ENGINEER IS REQUIRED TO MONITOR REPAIRS MADE UNDER THIS PERMIT. THE ENGINEER MUST SUBMIT A SEALED STATEMENT TO THE DEPARTMENT CONFIRMING THAT THE STRUCTURE IS IN SOUND CONDITION AT COMPLETION.City of Philadelphia · 2022
FOR THE REPLACEMENT OF ROOF AS PER APPROVED PLAN.City of Philadelphia · 2020
Roof replacement as per approved plans.City of Philadelphia · 2020
EZ PERMIT RE-ROOFING - FOR THE INSTALLATION OF NEW ROOF COVERINGS ON EXITING ROOFS AS PER ATTACHED STANDARD. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS. RE-ROOF AS PER PHILADELPHIA HISTORIC COMMISSION APPROVED PLANS.City of Philadelphia · 2019
*ASBESTOS REMEDIATION REQUIRED PRIOR TO START OF WORK*
REMOVE THE ROOF SYSTEM TO A SUITABLE SUBSTRATE. REPAIR ANY DAMAGED DECK AND REPAIR. INSTALL INSULATION REQUIRED TO REPLACE AREA OF DAILY DEMOLITION OPERATIONS. INSTALL INSULATION AS TO PROVIDE PROPER POSITIVE DRAINAGE TO THE DRAINS. INSTALL INSULATION FIBER BOARD AS PER MANUFACTURER'S RECOMMENDATIONS AND ENERGY CODE REQUIREMENTS. INSTALL 4 PLY COLD APPLIED BITUMINOUS ROOFING SYSTEM PER THE MANUFACTURER'S RECOMMENDATIONS. SEPARATE PERMIT REQUIRED FOR ANY MODIFICATIONS TO PLUMBING, MECHANICAL, ELECTRICAL OR FIRE SUPPRESSION.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you JOTTAN INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2018
*ASBESTOS REMEDIATION REQUIRED PRIOR TO START OF WORK*
REMOVE THE EXISTING BUILT UP ROOF SYSTEM TO A SUITABLE SUBSTRATE. INSTALL A NEW 4 PLY, HOT APPLIED BUILT UP ROOF SYSTEM. THE NEW SYSTEM WILL BE INSTALLED AS FOLLOWS: EXISTING GYPSUM DECK, MECHANICALLY ATTACH TYPE II BASE SHEET, TAPERED INSULATION (4" MINIMUM, 13.839" MAXIMUM) IN ASPHALT, 1/2" HD FIBER BOARD IN ASPHALT, (1)BASE PLY, (2) INTERPLY SHEETS, AND (1) CAP SHEET IN ASPHALT. SEPARATE PERMIT REQUIRED FOR ANY MODIFICATIONS TO PLUMBING, MECHANICAL, ELECTRICAL OR FIRE SUPPRESSION.City of Philadelphia · 2018
EZ PERMIT RE-ROOFING-POWER WASH ROOFS "A,B,& C", APPLY COATING OF NON-FIBRATED ALUMINUM CAOTING AT A RATE OF ONE HALF TO THREE QUARTERS PER GALLON PER 100 SQFT TOTALING APPROXIMATELY 15,800. ROOF "D" MECHANICALLY ATTACHED 100 WHITE FLEECEBACK TPO TO THE SUBSTRATE APPROX. 4,845 SQFT FOR THE INSTALLATION OF NEW ROOF COVERINGS ON EXITING ROOFS AS PER ATTACHED STANDARD. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS.City of Philadelphia · 2018
REMOVE THE EXISTING ROOF SYSTEM TO A SUITABLE SUBSTRATE. PRIME THE 9000 SF OF RE ROOFING ON CONCRETE DECK. APPLY HPR TORCH BASE AS A VAPOR BARRIER OVER THE DECK. FULLY ADHERE 1/2/" SECUROCK BOARD TO THE SUBSTRATE. PRIME THE SECUROCK. TORCH APPLY ONE PLY OF SBS TORCH GRADE BASE SHEET TO APPROVED TORCHABLE INSULATION WITH ROOFER'S TORCHES. TORCH APPLY ONE TOP PLY OF STREESPLY IV PLUS MINERAL 195 MILS SBS WITH ROOFER'S TORCHESCity of Philadelphia · 2018
REMOVE THE ROOF SYSTEM TO A SUITABLE SUBSTRATE. REPAIR ANY DAMAGED DECK AND REPAIR. INSTALL INSULATION REQUIRED TO REPLACE AREA. OF DAILY DEMOLITION OPERATIONS. INSTALL INSULATION AS TO PROVIDE PROPER POSITIVE DRAINAGE TO THE DRAINS. INSTALL INSULATION FIBER BOARD AS PER MANUFACTURES RECOMMENDATIONS AND ENERGY CODE REQUIREMENTS. INSTALL 4-PLY COLD APPLIED BITUMINOUS ROOFING SYSTEM OER THE MANUFACTURES RECOMMENDATIONS. DRAWINGS AND SPECS ARE ATTACHED. SEPARATE PERMITS REQUIRED FOR ALL MECHANICAL, ELECTRICAL AND PLUMBING WORK.City of Philadelphia · 2018
FOR THE INSTALLATION OF NEW ROOF COVERINGS ON EXITING ROOFS AS PER ATTACHED STANDARD. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS.City of Philadelphia · 2018
Permitted projects on public record. Addresses are omitted for privacy.