What the public permit record shows, not self-reported reviews.
Is JOSEPH ROSATI JR. a real contractor?
JOSEPH ROSATI JR. appears in public building-permit records with 94 permits filed through 2021 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is JOSEPH ROSATI JR.'s track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to JOSEPH ROSATI JR. by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is JOSEPH ROSATI JR. licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. JOSEPH ROSATI JR. has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is JOSEPH ROSATI JR.'s work?
The most recent permit on record for JOSEPH ROSATI JR. is dated 2021-02-05, with 94 permits on file in total.
All Site utility plumbing work including: Water pipe, Storm pipe/structures, Storm basin, Sanitary pipe. All within 5 feet of building.City of Philadelphia · 2021
plumbing from curb trap into house and throughout
water and sewer from street into curb is private infrastructureCity of Philadelphia · 2021
plumbing from curb trap into the house and throughout
water and sewer from street into curb are private infrastructureCity of Philadelphia · 2021
plumbing from curb trap into house and throughout
sewer and water from street into curb is part of a private infrastructureCity of Philadelphia · 2021
new plumbing from curb trap into house and throughout
work in street is part of a private infrastructureCity of Philadelphia · 2021
FOR SEALING THE LATERAL AS PART DEMOLITION TO COMPLY CASE #CF-2020-026175 AS PER 2018 PPC.City of Philadelphia · 2021
adding bathrooms and sinksCity of Philadelphia · 2020
new sewer and water from curb trap and throughout houseCity of Philadelphia · 2020
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you JOSEPH ROSATI JR.?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to JOSEPH ROSATI JR.'s website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work.City of Philadelphia · 2020
For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work.City of Philadelphia · 2020
For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work.City of Philadelphia · 2020
Alterations: Interior plumbing. All proposed work to be done in accordance with Philadelphia Plumbing Code 2018.City of Philadelphia · 2020
Permitted projects on public record. Addresses are omitted for privacy.