What the public permit record shows, not self-reported reviews.
Is JOHN STUSNICK a real contractor?
JOHN STUSNICK appears in public building-permit records with 16 permits filed through 2018 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is JOHN STUSNICK's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to JOHN STUSNICK by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is JOHN STUSNICK licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. JOHN STUSNICK has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is JOHN STUSNICK's work?
The most recent permit on record for JOHN STUSNICK is dated 2018-03-06, with 16 permits on file in total.
REPLACE STACK REROUGH DRAIN LINE & HOT & COLD WATER SUPPLY FOR 1-TUB, 1-SHOWER, 3-LAV, 3-WATER CLOSET, KITCHEN SINK, DISPOSAL & LAUNDRY TUB & HWH THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004City of Philadelphia · 2018
REPLACE INSIDE MAIN DRAIN FRONT OF BASEMENT TO REAR YARD DRAIN, STACK AND REROUGH TUB, WATER CLOSET, LAV DRAIN LINES & LAUNDRY TUB THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004City of Philadelphia · 2018
1ST AND 2ND FLOOR:BOTH DRAINLINES FROM BEND TO LAV,TUB & SHOWER AND KITCHEN, INSTALL KITCHEN SINK TO EXISTING DRAIN AND IN BASEMENT INSTALL LAUNDRY TUB TO EXISTING DRAIN. THE INSTALLATION WILL COMPLY WITH THE PHILADEPHIA PLUBMING CODE 2004City of Philadelphia · 2016
ROUGH IN PLUMBING FOR (2)3 PIECE BATH GROUPS,3 POWDER ROOMS,2 KITCHEN SINKS,(2)2" OPEN FIXTURES FOR CONDENSATION LINES PER 2008 NEC (MIXED USE)THE INSTALLATION WILL COMPLY WITH THE PHILADELPHIA PLUMBING CODE 2004City of Philadelphia · 2015
REPLACE 8 LAVS, 5 TOILETS, 3 URINALS TO EXISTING DRAINS (CLUBHOUSE)City of Philadelphia · 2013
2" DRAIN & VENT CONNECTING TO EXISTING 4X2" Y ON STACK INSTALL 2" STAND PIPE, 1 1/2" KITCHEN DRAIN &2"VENT TO ROOF & WATER LINES TO FIXTURES (SFD)City of Philadelphia · 2012
REPLACE TUB & LAV DRAIN LINES FROM EXISTING CLOSET BEND TO FIXTURES W/ 1 1/2" PVC (SINGLE FAMILY DWELLING)
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you JOHN STUSNICK?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2011
ROUGH IN HANDICAP BATHROOM (2-PIECE) & ONE INDIRECT WASTE FIXTURE 2" (RESIDENTIAL & RESTAURANT)City of Philadelphia · 2011
INSTALL DWV INSIDE TO EXISTING MAIN DRAIN WITH COMBO CESS POOL RAIN WATER CONDUCTOR,INSTALL HOT WATER HEATER WATER AND DRAIN LINE TO TUB,TOILET,LAV,KITCHEN SINK LAUNDRY TUB STAND PIPECity of Philadelphia · 2010
INSTAL POWDER ROOM,1 WATER CLOSET,1 LAV FIXTUERS DRAINS AND WATER LINE,INSTALL NEW FIXTURESCity of Philadelphia · 2010
INSTALLATION OF STACK, FIXTURE DRAINS TO KITCHEN SINK, 1ST & 2ND FLOOR. 3 PIECE BATHROOMS, WASHER STAND PIPE, CONNECT EXISTING YARD DRAIN, INSTALL WATER SUPPLY TO FIXTURES, HOT WATER HEATERCity of Philadelphia · 2010
INSTALLATION OF STACK, FIXTURE DRAINS TO KITCHEN SINK,2ND FLOOR. 3 PIECE BATHROOM, WASHER STAND PIPE, CONNECT EXISTING YARD DRAIN, INSTALL WATER SUPPLY TO FIXTURES, HOT WATER HEATERCity of Philadelphia · 2010
Permitted projects on public record. Addresses are omitted for privacy.