What the public permit record shows, not self-reported reviews.
Is JJ WHITE INC a real contractor?
JJ WHITE INC appears in public building-permit records with 65 permits filed through 2025 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is JJ WHITE INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to JJ WHITE INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is JJ WHITE INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. JJ WHITE INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is JJ WHITE INC's work?
The most recent permit on record for JJ WHITE INC is dated 2025-12-22, with 65 permits on file in total.
FOR INSTALLATION OF HVAC EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.City of Philadelphia · 2025
LEVEL II INTERIOR & EXTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO FIRST FLOOR LEVEL & STAIRWAYS OF AN EXISTING OFFICE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW*
**SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**City of Philadelphia · 2025
FOR A MECHANICAL UPGRADE TO ACCOMMODATE AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.City of Philadelphia · 2025
FOR INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.City of Philadelphia · 2025
FOR STRCUTURAL WORK TO AN EXISTING STRUCTURE. **ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.**City of Philadelphia · 2025
Add 2 new Sinks and 1 electric water heater under sinkCity of Philadelphia · 2025
FOR THE INSTALLATION OF HYDRONIC PIPING FOR HEATING HOT WATER TO VAV COILS TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you JJ WHITE INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2025
FOR THE INSTALLATION OF HVAC EQUIPMENT, APPLIANCES, DUCTWORK AND REGISTER/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.City of Philadelphia · 2024
FOR THE INSTALLATION OF APPLIANCES WITH ASSOCIATED PIPING AND DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2024
FOR THE INSTALLATION OF HVAC APPLICANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.City of Philadelphia · 2024
FOR THE INSTALLATION OF HVAC APPLIANCES (INCLUDING (3) STEAM BOILERS, (4) HEATING HOT WATER BOILERS, (3) CENTRIFUGAL CHILLERS, (21) HYDRONIC PUMPS, (7) STEAM CONDENSATE PUMPS, (1) 4-CELL COOLING TOWER, (6) AIR CURTAINS, (8) UNIT HEATERS, (2) EXPANSION TANKS, AND (2) AIR SEPARATORS), FINNED TUBE RADIATION, HYDRONIC PIPING, AND FUEL GAS PIPING. DUCTED HVAC APPLIANCES WITH ASSOCIATED DUCTWORK AND GRDs TO BE INSTALLED SEPARATELY (SEE MP-2024-000208). ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC AND 2018 IFGC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK. SEE CP-2022-004944 FOR ASSOCIATED BUILDING PERMIT.City of Philadelphia · 2024
INSTALL 1 SINK, 1 MOP SINK AND 1 EYEWASH STATION ACCORDING TO THE 2018 PPC.City of Philadelphia · 2024
Permitted projects on public record. Addresses are omitted for privacy.