What the public permit record shows, not self-reported reviews.
Is JIM MELLON GEN CONTR INC a real contractor?
JIM MELLON GEN CONTR INC appears in public building-permit records with 35 permits filed through 2021 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is JIM MELLON GEN CONTR INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to JIM MELLON GEN CONTR INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is JIM MELLON GEN CONTR INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. JIM MELLON GEN CONTR INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is JIM MELLON GEN CONTR INC's work?
The most recent permit on record for JIM MELLON GEN CONTR INC is dated 2021-06-28, with 35 permits on file in total.
EZ PERMIT STANDARDS ALTERATIONS - For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Structural alteration or repair is expressly prohibited under this permit. Prohibited structural work any modifications to exterior walls, party walls, floor/roof framing or foundations, including underpinning, excavation, and removal of foundation slab. WORK IN THE BASEMENT OR CELLAR IS NOT INCLUDED ON THE EZ ALT PERMIT. Separate permits required for Mechanical, Electric and Plumbing. Interior alterations per E-Z Standard throughout existing single household dwelling unit. Note: previous Make Safe Permit RP-2021-005311 covered structural repairs to building. No structural work is proposed under this permit.City of Philadelphia · 2021
FOR COMPLIANCE OF CASE VIOLATION CF-2021-005856 FOR THE REPAIR OF EXTERIOR STRUCTURAL SUPPORTS, TO INCLUDE STEEL POST INSTALLATION, MASONRY SUPPORT STRUCTURE, POST-INSTALLED MASONRY ANCHORS, AND WELDING. (IEBC 2018, REPAIR) **SEPARATE PERMITS TO BE REQUIRED FOR ANY WORKSCOPE THAT DOES NOT COMPLY CASE VIOLATION CF-2021-005856, TO INCLUDE INTERIOR ALTERATIONS.**City of Philadelphia · 2021
MAKE SAFE PERMIT TO COMPLY WITH CASE# CF-2020-074669 TO INCLUDE CEILING AND WALL PARTITION REPAIRS TO AN EXISTING ATTACHED STRUCTURE DAMAGED BY FIRE AS PER APPROVED PLAN AND ENGINEER REPORT. ABUTTING SIDEWALK MUST BE CLOSED WITH FENCING A MINIMUM OF 6? IN HEIGHT. SEPARATE STREETS DEPARTMENT PERMIT REQUIRED FOR SIDEWALK CLOSURE. A SEPARATE PERMIT IS REQUIRED FOR ANY ADDITIONAL ALTERATIONS THAT ARE NOT SPECIFICALLY ADDRESSED ON CASE #CF-2020-074669.City of Philadelphia · 2021
EZ PERMIT STANDARDS ALTERATIONS - For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Structural alteration or repair is expressly prohibited under this permit. Prohibited structural work any modifications to exterior walls, party walls, floor/roof framing or foundations; including underpinning, excavation, and removal of foundation slab. WORK IN THE BASEMENT OR CELLAR IS NOT INCLUDED ON THE EZ ALT PERMIT. Separate permits required for Mechanical, Electric and Plumbing. Remove and replace water damaged interior wall, ceiling, and floor finishes. Replace water damage baseboard and door trim. No structural work is proposed and work to be done in accordance with E-Z Standard.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you JIM MELLON GEN CONTR INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to JIM MELLON GEN CONTR INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2021
EZ PERMIT STANDARDS ALTERATIONS - For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Structural alteration or repair is expressly prohibited under this permit. Prohibited structural work any modifications to exterior walls, party walls, floor/roof framing or foundations; including underpinning, excavation, and removal of foundation slab. NO WORK MAY BE PERFORMED IN THE BASEMENT OR CELLAR. Separate permits required for Mechanical, Electric and Plumbing.
For minor construction work at the subject property in accordance with all applicable provisions of the
Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work.City of Philadelphia · 2020
EZ PERMIT STANDARDS ALTERATIONS - For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Structural alteration or repair is expressly prohibited under this permit. Prohibited structural work any modifications to exterior walls, party walls, floor/roof framing or foundations; including underpinning, excavation, and removal of foundation slab. NO WORK MAY BE PERFORMED IN THE BASEMENT OR CELLAR. Separate permits required for Mechanical, Electric and Plumbing.
For minor construction work at the subject property in accordance with all applicable provisions of the
Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work.City of Philadelphia · 2020
FOR PRESCRIPTIVE ALTERATIONS TO A PREVIOUSLY INTERIOR WALL AND MAKING IT AN EXTERIOR WALL DUE TO PARTIAL DEMOLITION OF AN EXISTING DETACHED STRUCTURE UNDER AP#974193, FOR REPAIRS TO THE ROOF FRAMING AND REPLACEMENT OF ROOF COVERING, AS PER PLANS; NO OTHER WORK ON THIS PERMIT; SEE AP#974112 FOR SITE PLAN SHOWING LOCATION OF DEMOLISHED PORTION.City of Philadelphia · 2020
MAKE SAFE PERMIT - FOR REPAIRS TO THE FIRE DAMAGED MAIN ROOF AND REAR WALL TO RESOLVE CASE 705207. ABUTTING SIDEWALK MUST BE CLOSED WITH FENCING A MINIMUM OF 6' IN HEIGHT. SEPARATE STREETS DEPARTMENT PERMIT REQUIRED FOR SIDEWALK CLOSURE. A SEPARATE PERMIT IS REQUIRED FOR ANY ADDITIONAL ALTERATIONS THAT ARE NOT SPECIFICALLY ADDRESSED ON CASE 705207.City of Philadelphia · 2020
HOT WATER HEATER BURST CAUSING FLOOD, DISCONNECT PLUMBING AT START OF JOB CONNECT PLUMBING @COMPLETION OF JOB. REMOVED OF CONCRETE SLAB (NOTE:NO EXCAVATION OF SOIL BENEATH THE BASEMENT FLOOR WILL OCCUR. NO UNDERPINNING. THE EXISTING BASEMENT FLOOR ELEVATION SHALL REMAIN UNCHANGED) CONCRETE REPLACEMENT. REMOVAL AND REPLACEMENT OF BEAM AND RECONSTRUCTION OF STAIRWELL OPENING PER ENGINEER DRAWINGS AND REPORT. REPLACEMENT OF STAIRS TO BASEMENT.CLEANING/MOLD REMEDIATION OF BASEMENT. SEALING OF CEILING JOISTS AND RAFTERS AND WALLS. ADDITIONAL CLEANING OF 1ST FLOOR KITCHEN, DINING ROOM AND HALL. **ADDITIONAL PLUMBING PERMIT WILL BE REQUIRED**City of Philadelphia · 2019
INTERIOR ALTERATIONS TO INCLUDE INSTALLATION OF DRYWALL, INSULATION, TRIM, PAINTING, AND HARDWOOD FLOORS. APPLICANT AGREES TO LIMIT THE CONSTRUCTION TO COMPLY WITH EZ PERMIT STANDARD FOR INTERIOR ALTERATIONS, REVISED APRIL 2018. STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/ROOF FRAMING OR FOUNDATIONS; UNDERPINNING AND EXCAVATIONS (I.E. DIGGING IN BASEMENT).City of Philadelphia · 2019
Interior Alterations to include drywall, insulation, trim, flooring and windows & doors (in existing openings). Applicant agrees to limit the construction to comply with EZ Permit Standard for Interior Alterations, revised April 2018. STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/ROOF FRAMING OR FOUNDATIONS; UNDERPINNING AND EXCAVATIONS (I.E. DIGGING IN BASEMENT).City of Philadelphia · 2019
EZ PERMIT STANDARDS ALTERATIONS - FOR ALTERATIONS TO AN EXISTING ONE FAMILY DWELLING AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS. SEPARATE PERMITS ARE REQUIRED FOR PLUMBING AND ELECTRICAL WORK AND THE INSTALLATION OF HEATING/COOLING APPLIANCES. STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/ROOF FRAMING OR FOUNDATIONS; INCLUDING UNDERPINNING, EXCAVATION, AND REMOVAL OF FOUNDATION SLAB. NO WORK MAY BE PERFORMED IN THE BASEMENT OR CELLAR.City of Philadelphia · 2019
Permitted projects on public record. Addresses are omitted for privacy.