What the public permit record shows, not self-reported reviews.
Is JCLR CONSTRUCTION LLC. a real contractor?
JCLR CONSTRUCTION LLC. appears in public building-permit records with 26 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is JCLR CONSTRUCTION LLC.'s track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to JCLR CONSTRUCTION LLC. by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is JCLR CONSTRUCTION LLC. licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. JCLR CONSTRUCTION LLC. has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is JCLR CONSTRUCTION LLC.'s work?
The most recent permit on record for JCLR CONSTRUCTION LLC. is dated 2026-01-12, with 26 permits on file in total.
For the limited demolition and commercial alterations to suite 2 without submitting plans as per attached standards. Deviations from these standards require submission of construction and site plans. No structural work or installation of new walls to be performed under this Permit Standard. Installation of service counters resulting in the creation of a new employee work area shall not exceed 1,000 ft. For use as Retail Sales- Wearing Apparel and Accessories in suite 2 to include all other previously approved use. As per approved plans.City of Philadelphia · 2026
ALTERATION OF THE REAR FACADE EXTERIOR CLADDING ON AN HISTORIC PLACE [SPRING GARDEN DISTRICT-1] AS DESIGNATED BY THE PHILADELPHIA HISTORIC COMMISSION TO MITIGATE WATER INTRUSION ISSUES. REMOVAL OF EXISTING STUCCO CLADDING ON LEVEL 2 AND 3 OF A PROJECTING BAY STRUCTURE ON THE REAR FACADE. EXISTING BAY TO BE RE-CLAD WITH NEW FIBER-CEMENT SIDING. EXISTING WINDOWS TO REMAIN. EXISTING RAIN WATER DRAINAGE SYSTEM (GUTTERS & DOWNSPOUTS) WILL BE REMOVED AND RE-INSTALLED. AN ADJACENT FLAT SHED ROOF MEMBRANE WILL BE REMOVED AND REPLACED. NO STRUCTURAL WORK. DETAILS PER PLAN.City of Philadelphia · 2025
Supply and return duct modification to existing equipment located in white box retail space. Relocation of 80 linear feet of exposed spiral supply duct and 20 linear feet of return duct. Installation of 12 supply register based on layout of new space and 2 return registers. All equipment existing, previously installed by landlord. New installation is for fit out only and tenant space.City of Philadelphia · 2025
FOR LEVEL III ALTERATIONS TO AN EXISTING COMMERCIAL BUILDING FOR USE AS RELIGIOUS ASSEMBLY (A-3 OCCUPANCY). ALTERATIONS TO INCLUDE THE STRUCTURAL REPAIR/REINFORMENT OF EXISTING STRUCTURAL MEMBERS, ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
**AMENDMENT (1-15-2026) FOR CHANGES AS SHOWN ON THE APPROVED AMENDED CONSTRUCTION DOCUMENTS. SEE CLOUDED REVISIONS BEARING REVISION MARKED WITH REVISION TAGS 6 & 8 FOR ALL CHANGES **
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you JCLR CONSTRUCTION LLC.?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to JCLR CONSTRUCTION LLC.'s website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2025
FOR A NEW MECHANICAL WORK TO ACCOMMODATE AN EXISTING STRUCTURE. ALL APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2025
FOR THE INSTALLATION REGISTERS/DIFFUSERS AND ASSOCIATED DUCT WORK AND PIPING TIED INTO EXISTING HVAC SYSTEMS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION.City of Philadelphia · 2025
LEVEL II INTERIOR ALTERATIONS FOR FIT-OUT OF SECOND FLOOR SHELL SPACE FOR ACCESSORY MEN'S & WOMEN'S LOCKER AND BATHROOMS AS PER APPROVED PLANS. SEE PERMITS CP-2020-002317 & CP-2020-006929 FOR BASE BUILDING WORK TO INCLUDE REQUIRED FLOOD PROTECTION MEASURES. BUILDING TO BE FULLY SPRINKLERED. *2018 IEBC*
**SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**City of Philadelphia · 2025
FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FINISHES, DOORS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.City of Philadelphia · 2025
For the installation of interior ductwork only to include one (1) main supply duct with 11 supply registers and four (4) return lines with 16 return registers, connected to existing HVAC appliances. All work to be done per approved plans and in accordance with 2018 IMC and PHC approval. Separate permits to be obtained for all other work. If site conditions vary, contact design professional prior to start of work.
[Amendment 4/28/2025 for revisions to HVAC system to address change in use of a portion of the Level 1 Mezzanine to new dining area to include installation of one (1) new mini split-system heat pump as per approved amended plans.]City of Philadelphia · 2025
1-story addition in rear/side yard to house new powder room and mudroom. details as shown on the plan.City of Philadelphia · 2024
**AMENDMENT DATED 7/11/2025 TO APPROVE TCO AND LO SIGNS FOR AN EVENT ON 7/18/2025 ONLY AS PER BBS VARIANCE GRANTED UNDER MI-2025-004449; FLOOR PLANS OF EVENT TO BE APPROVED BY FIRE CODE UNIT, FIRE WATCH PERSONNEL STATIONED IN FIRE COMMAND CENTER AT ALL TIMES, AND ALL A/V EQUIPMENT TO BE CONNECTED TO SHUNT TRIP AND SHUT OFF UPON ACTIVATION OF FIRE ALARM SYSTEM**
AMENDMENT DATED 2/12/2025: REVISED ARCHITECTURAL AND STRUCTURAL PLANS TO DOCUMENT CHANGES. AS PER APPROVED PLANS.
FOR LEVEL II ALTERATIONS TO AN EXISTING DETACHED STRUCTURE. ALTERATIONS TO INCLUDE THE FIRST TENANT INTERIOR BUILD-OUT OF THE PARTIAL 1ST FLOOR, PARTIAL 1ST FLOOR MEZZANINE, AND PARTIAL 2ND FLOOR, ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS AN ASSEMBLY AND ENTERTAINMENT WITH ALL OTHER USES IN THE SAME STRUCTURE AS PREVIOUSLY APPROVED. AS PER APPROVED PLANS.City of Philadelphia · 2024
LEVEL II INTERIOR ALTERATIONS TO THE FIRST FLOOR OF AN EXISTING TENANT SPACE #111 AS PER APPROVED PLANS.
FOR USE AS PREVIOUSLY APPROVED. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW*
**SEPATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**City of Philadelphia · 2024
Permitted projects on public record. Addresses are omitted for privacy.