What the public permit record shows, not self-reported reviews.
Is JAY TRIFUN a real contractor?
JAY TRIFUN appears in public building-permit records with 27 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is JAY TRIFUN's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to JAY TRIFUN by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is JAY TRIFUN licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. JAY TRIFUN has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is JAY TRIFUN's work?
The most recent permit on record for JAY TRIFUN is dated 2026-02-03, with 27 permits on file in total.
Installation of 48a EV charger IN ACCORDANCE WITH ATTACHED STANDARDCity of Philadelphia · 2026
Installation of 48a 11.5kw EVSE #6thhn will be routed through 3/4 pvc conduit from the garage electrical panel to the EVSE on the outside garage wall, a 60a breaker will be used for overcurrent protection In Accordance with attached EZ standardCity of Philadelphia · 2025
Installation of an 11.5kw 48a EVSE. 3/4 PVC conduit will be installed for routing 2-#6thhn and 1-#10 ground. A 60a breaker will be used for overcurrent protection. The EVSE will be installed in the customers garageCity of Philadelphia · 2025
INSTALLATION OF 48A EV CHARGER ON 60A BREAKER WITH #6THHN X’S 2 AND 1 #10G IN 3/4 PVC CONDUIT
In Accordance with attached EZ standard charger installed in the interior of the garageCity of Philadelphia · 2024
INSTALLATION OF 48A EV CHARGER IN CUSTOMERS GARAGE In Accordance with attached EZ standardCity of Philadelphia · 2024
INSTALL A 40 AMP EV CHARGER. ALL WORK IN ACCORDANCE WITH THE 2017 NEC.City of Philadelphia · 2024
Installation of an EVC System to a single family or two-family dwelling with existing onsite parkingCity of Philadelphia · 2024
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you JAY TRIFUN?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Installation of an EVC System to a single family or two-family dwelling with existing onsite parking
100AMP DISCONNECT ANSD 100AMP BREAKER WILL BE INSTALLED AS WELL FOR OVERCURRENT PROTECTIONCity of Philadelphia · 2024
INSTALL EV CHARGER STATION ACCORDING TO THE 2017 NEC.City of Philadelphia · 2024
INSTALLATION OF 200A SERVICE OUTSIDE FOR INSTALLATION OF CUSTOMERS 48A EV CHARGER AS PER 2017 NEC. HARDWIRED VERSIONCity of Philadelphia · 2024
Installation of an EVC System to a single family or two-family dwelling with existing onsite parkingCity of Philadelphia · 2024
Installation of an EVC System to a single family or two-family dwelling with existing onsite parkingCity of Philadelphia · 2024
Permitted projects on public record. Addresses are omitted for privacy.