What the public permit record shows, not self-reported reviews.
Is JAMES MARTORELLI a real contractor?
JAMES MARTORELLI appears in public building-permit records with 86 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is JAMES MARTORELLI's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to JAMES MARTORELLI by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is JAMES MARTORELLI licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. JAMES MARTORELLI has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is JAMES MARTORELLI's work?
The most recent permit on record for JAMES MARTORELLI is dated 2026-04-24, with 86 permits on file in total.
New fixtures and piping to include: 3 water closets, 3 lavatories, 2 shower/tub units, 2 kitchen sinks, 2 laundry sinks, 5 floor drains, and 2 water heaters. All work per 2018 PPC Section 919 Single Stack Waste and Vent.City of Philadelphia · 2026
New fixtures with piping to include: 1 water closet and 2 Others (1 mop sink and 1 hi-lo water cooler. All work per 2018 PPC Section 919 Single Stack Waste and Vent.City of Philadelphia · 2026
Replacement of following fixtures with piping to include: 1 lavartory, 1 water closet, and 1 urinal. All work per 2018 PPC Section 919 Single Stack Waste and Vent. Note this project is on 10th Floor under parent permit CP-2026-000634.City of Philadelphia · 2026
Replacement of curb trap, FAI, and main drain back to foundation wall in an existing single household dwelling unit.City of Philadelphia · 2025
Plumbing Permit (Interior) for combo CP-2025-002378City of Philadelphia · 2025
INSTALL 8 fixtures with piping to include: 2 water closets, 2 lavatories, 1 shower/tub unit, 1 laundry sink, 1 kitchen sink, and 1 water heater.City of Philadelphia · 2025
New fixtures and piping to include: 3 water closets, 3 lavatories, 3 shower/tub units, 1 kitchen sink, 1 water heater, and 1 Other (dishwasher)City of Philadelphia · 2025
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you JAMES MARTORELLI?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to JAMES MARTORELLI's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Install 3/4" RP (Watts LF009MQ2T) device to existing water distribution piping. All work per 2018 PPC.City of Philadelphia · 2025
Replace 3/4" water distribution piping from curb to water meter in existing single-family dwellingCity of Philadelphia · 2024
INSTALL 2 FLOOR SINKS ACCORDING TO THE 2018 PPC AND PER PLANS.City of Philadelphia · 2023
Replacement of fixture: remove existing clinical sink and replace with hand sink in morgue.
WITHOUT PIPINGCity of Philadelphia · 2023
Application for 1-1/2" domestic water service, and 5" sanitary drain with FAI and sewer lateral. All work to comply with 2018 PPC.City of Philadelphia · 2022
Permitted projects on public record. Addresses are omitted for privacy.