Install Universal Tesla Charger in Garage left wall 2' in from garage door opener up at 48in from the garage floor. Install a 6x6 pvc junction box at the bottom of the garage wall. Install 1" pvc piping from the 6x6 j/b up to the Tesla Charger. Install azac on concrete wall behind Tesla Charger. Install 60amp d/p siemens breaker & label. Run 60amp6/2 m/c line from panel in basement fish through duct soffit in space behind left wall with access door & drill through concrete into the 6x6 j/b. Install #6 thhn wire from 6x6 j/b through pvc piping directly into Tesla Charger. Do the commissioning & test charger when done.City of Philadelphia · 2025
Remove old, ridged piping outside going from meter up to PECO triplex wires going through roof. Install all new 2" ridged pipe from new meter socket through roof up to PECO triplex wires. Silicone & seal around piping at roof. Install ground rods & bridge on wall outside. Replace 200amp service with all new 200amp 42 cir. serviceCity of Philadelphia · 2025
INSTALLATION OF A EVC CHARGING SYSTEM WITH A DCC BOX (ELECTRIC VEHICLE ENERGY MANAGEMENT SYSTEM) ACCORDING TO THE 2017 NEC AND PER PLANS.City of Philadelphia · 2023
INSTALL A NEW 320 AMP 120/240V/ 1 PHASE METER SOCKET, INSTALL A NEW 200 AMP SERVICE CONDUCTORS & PANEL. INSTALL NEW SERVICE CONDUCTORS TO THE EXISTING 200 AMP ATS. REPLACE THE EXISTING 200 AMP PANEL. RELOCATE & REFEED THE 22KW GENERATOR. INSTALL SERVICE BONDING / GROUNDING AT THE 200 AMP PANEL & 200 AMP ATS. ALL WORK IN ACCORDANCE WITH THE 2017 NEC.City of Philadelphia · 2023
Furnish & wire one 22kw Air Cooled Honeywell/Generac Electric Generator powered by liquid propane/natural gas operated engine. The 22kW generator will provide a 91.67 Amp rating for the total load setting. Install one Honeywell/Generac 200 Amp automatic transfer switch outside to the right of the 200amp meter socket. All branch circuits connected to the electrical panel will be transferred to the generator during the power outage condition and will have power availability simultaneously for the contents of the load center. The transfer switch will redirect all of the desired circuitry to the generator during a power outage condition. This equipment will be located outside or wherever application is able to be installed to meet all the current electrical codes. Circuitry will not be transferred to the generator during the weekly exercise period, only during a power outage. Installation of the control wiring and connection points between the transfer switch and the generator equipment. This wiring will be installed for the equipment monitoring, automatic engine start function, exercise routine, power failure-alert, run time monitoring and battery charging equipment. AS PER NEC 2014
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
FOR A NEW MECHANICAL INSTALLATION TO AN EXISTING STRUCTURE. WORK TO INCLUDE THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2022
Run 3 new 208/230 single phase dedicated electrical lines for roof top units only (Model #PCE4B6022) 60amps for each line).
Remove all the old and rusted conduit, disconnects, and outdoor electrical panels on the roof top.
Install 2 new 200amp Nema-3 rated outdoor electrical panels for new roof top units.
Install 3 new nema-3 rated disconnects for all 3 new roof top units.
Install all new scheduled 80 rated PVC piping along the walls outside for both the electrical panels and going to all the new disconnects.
Install all new 60amp double pole breakers for each one of the new roof top units.
Install all new breakers for all other existing circuits.
Install all new electrical whips going from each one of the disconnects over to each roof top unit.
Install all new electrical panels when complete.
Run 3 new 460 3-phase 20amp dedicated lines for heat pump split systems (Model #PH15C00 MOCP).
Run 3 new 460 3-Phase 40amp dedicated lines for heat pump outdoor roof top units (Model#NH15C00 MOCP).
Install 3 new Nema-3 rated disconnects for the outside roof top units.
Install 3 new whips going from each disconnect over to each outdoor roof top units.
Remove the old 30 circuit Challenger electrical panel in the electrical room closets to the entrance of the building.
Install a new 200amp 3-Phase 42 circuit electrical panel.
Install all new breakers single and 3-Phase breakers.
Remove the old Challenger 6 circuit electrical sub panel in the far back room of the rock-climbing area.
Install a new 10 circuit sub-panel in the far back room of the rock-climbing area. (60 amps)
Install all new breakers.
Label all electrical panels when complete..
**ALL WORK TO BE DONE IN ACCORDANCE W/ 2017 NEC**
Amendment: I am adding a 400 amp service upgrade to the original scope of work. Peco is bringing 3 phase to the building and eliminating the old 2 phase. I will be changing all the electrical service equipment.City of Philadelphia · 2022
Remove the existing 200amp service Remove the exiting 200amp panel in the garage, meter socket, breakers Remove all the existing service wire form the meter socket up to the overhead PECO connections and from the meter socket to the electrical panel in the garage Remove the existing 100amp sub-panel in the closet on the 1st floor Install a new 200amp 42/84 circuit main breaker electrical panel in the garage Install a new 200amp 42/84 circuit main breaker panel cover Install a new 200amp overhead meter socket Install a new 2-inch meter hub on the top of the meter socket Install all new 200amp service wire going from the meter socket up to the overhead PECO connections and from the meter socket to the electrical panel in the garage Install a new -inch service head Install all new 2-hole straps for the service wire on the wall outside Install new H-Taps to connect the PECO wires to the house side service wire Install all new breakers in the 200amp panel Label the 200amp main electrical panel when complete Install two 8ft 5/8-inch ground rods outside in the ground to be at 6ft apart Install a ground bridge under the meter socket outside Run a #6 ground wire from each one of the ground rods through the ground bridge and into the electrical panel in the garage Run a #4 ground wire from the electrical panel in the garage to the water meter in the basement Silicone around the service wire going into the garage as well as duct seal Install a new 100amp sub panel and relocate it into the basement on the wall to the left of the door Install pressure treated 2x4?s and ?-inch plywood on the garage wall and mount the new 200amp electrical panel on it Install pressure treated 2x4?s and ?-inch plywood on the wall in the basement and place the new 100amp sub panel on it Run a new 100amp sub-feeder wire from the electrical panel in the closet to the new location of the 100amp sub-panel in the basement Remove the inside of the sub-panel in the closet and use it as a junction box toCity of Philadelphia · 2022
Run a dedicated 50amp 240V line for a ChargePoint wall charger.
Install 3/4" pvc piping going from one of the 200amp electrical panels inside along the side of the home to the back right corner of the home.
Install the 3/4" pvc piping as low as possible running along the outside wall over to the ChargePoint wall charger.
Lift 4 grey pavers that are currently in the ground between the home and the detached garage in the dirt.
Trench the ground from the home over to the detached garage about 11 feet 18 to 24-inches deep.
Continue running the 3/4"pvc piping from the side of the home down into the trench across to the detached garage up the side of the garage wall and into the garage to the ChargePoint charger.
Install the customer supplied ChargePoint charger on the outside of the home back right corner.
Install the ChargePoint charger in the garage left side wall about 3ft in at 48-inches up from the garage floor.
Run# 8s & # #10EGCwire from the 200amp electrical panel through the entire length of the 3/4 " pvc piping down the outside wall into the trench up into the ChargePoint wall charger in the detached garage.
Torque down all copper wire electrical connections in the ChargePoint wall charger according to ChargePoints install guidelines.
Install a 50amp 240V Siemens double pole breaker in the main electrical panel for the ChargePoint wall charger.
Torque down the electrical connection on the 50amp double pole breaker inside the main electrical panel.
Label the breaker when complete.
Backfill all dirt back into the trench and tamper down and make level.
Place all 4 grey pavers back in the ground and make level.
Take pictures of the electrical wire connections on the 50amp double pole breaker prior to reinstalling the panel cover. PER APPROVED LAYOUT-2014 NEC.City of Philadelphia · 2022
FOR A NEW MECHANICAL INSTALLATION. FOR THE INSTALLATION OF HVAC SYSTEM TO ACCOMMODATE THE FIRT FLOOR OF AN EXISTING STRUCTURE. **WORK TO BE PERFORMED PER APPROVED PLANS** ANY DEVIATION TO THE APPROVED PLANS WILL REQUIRED AN AMENDED PERMIT**City of Philadelphia · 2021
Electrical Permit for combo RP-2021-010558
New 200 amp service and electric vehicle charging station per manufacturer's standards and the 2014 NEC.City of Philadelphia · 2021
EZ PERMIT STANDARDS ALTERATIONS- For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Separate permits are required for plumbing and electrical work and the installation of heating/cooling appliances. STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/ROOF FRAMING OR FOUNDATIONS; INCLUDING UNDERPINNING, EXCAVATION, AND REMOVAL OF FOUNDATION SLAB.NO WORK MAY BE PERFORMED IN THE BASEMENT OR CELLAR.City of Philadelphia · 2021