REPLACEMENT OF TWO (2) DOMESTIC WATER BOILERS AND TANKS WITH REQUIRED MECHANICAL AND ELECTRICAL COMPONENTS IN AN EXISTING UNIVERSITY DORMITORY (MYERS HALL) AS PER APPROVED PLANS.City of Philadelphia · 2017
HVAC SYSTEMS INSTALLATION TO INCLUDE DUCTWORK, PIPING, FANS,APPLIANCES AND EQUIPMENT AS PER PLAN.City of Philadelphia · 2017
FOR LEVEL 2 ALTERATIONS TO EXISTING OFFICE SPACE AS PER PLANS. **SEPARATE ELECTRICAL, MECHANICAL, AND FIRE SUPPRESSION SYSTEM ALTERATIONS TO BE REQUIRED.**City of Philadelphia · 2017
INSTALL 3/4 RPZ BACKFLOW PREVENTER AS PER PHILADELPHIA PLUMBING CODE.City of Philadelphia · 2017
INSTALL WATTS #009 3/4" RPZ BACKFLOW PREVENTORCity of Philadelphia · 2017
FOR THE INSTALLATION OF A NEW HVAC SYSTEM INCLUDING APPLIANCES AND ASSOCIATED DUCTWORK AS PER PLANS. SEE PERMIT 71958 FOR PLANS.City of Philadelphia · 2016
FOR THE ERECTION OF A CANOPY STRUCTURE AND A DETACH STRUCTURE AS PER PLANS. NO EXTERIOR SIGNS INCLUDED IN THIS PERMIT. SEPARATE PERMITS REQUIRED FOR ALL MECHANICAL, ELECTRICAL AND PLUMBING WORK.City of Philadelphia · 2016
NO CHANGE IN USE AND OCCUPANCY CLASSIFICATION. INTERIOR ALTERATIONS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ANY MEP AND FIRE SUPPRESSION WORK. ALL WORK SHALL BE IN ACCORDANCE WITH DOH APPROVAL.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
FOR THE AMENDMENT OF BUILDING PERMIT NO.653388 BY CHANGING THE CONTRACTOR FOR THE INSTALLATION OF TANK NO. 885 TO J.J. WHITE, INC. ORIGINAL PERMIT APPROVED FOR THE FOR THE INSTALLATION OF GEODESIC DOMES ON TWO EXISTING TANKS (NO. 885 AND NO. 886) ACCESSORY TO EXISTING INTENSIVE INDUSTRIAL USE ON THE LOT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITION VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2016
CONNECTION TO TEMPORARY PANEL FED FROM TEMPORARY GENERATOR FOR EVENT ON 10/6/2015-10/11/2015 PER 2008 NEC (ATHLETIC FACILITY)City of Philadelphia · 2015
CONNECT 8" SANI & NEW SEWER WITH TRAP & FAI & 3" WATER DISTRIBUTION "SELF-CERTIFICATION'S ARE NO LONGER PERMITTED" - "ALL EXCAVATIONS AND PLUMBING TRENCHES IN EXCESS OF 5 FEET IN DEPTH MUST HAVE APPROVED SHORING IN PLACE AT THE TIME OF INSPECTION"City of Philadelphia · 2015
CONNECTION TO TREMPORARY PANAEL FED FROM TEMPORARY GENERATOR FOR EVENT PER 2008 NEC (UNIVERSITY COMPLEX)*EVENT JUNE 5-12 2015*City of Philadelphia · 2015
Permitted projects on public record. Addresses are omitted for privacy.