What the public permit record shows, not self-reported reviews.
Is Ivey Air, Inc. a real contractor?
Ivey Air, Inc. appears in public building-permit records with 14 permits filed through 2021 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is Ivey Air, Inc.'s track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to Ivey Air, Inc. by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is Ivey Air, Inc. licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. Ivey Air, Inc. has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is Ivey Air, Inc.'s work?
The most recent permit on record for Ivey Air, Inc. is dated 2021-01-07, with 14 permits on file in total.
FOR THE INSTALLATION OF TWO (2) TYPE I COMMERCIAL COOKING HOODS (13'-6" & 19'-6") AND THE INSTALLATION OF A NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, ROOFTOP UNITS, REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSIONCity of Philadelphia · 2021
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. *ROOFTOP UNITS NOT ALLOWED ON THIS PERMIT UNLESS ON APPROVED BUILDING PLANS* Installation of three (3) 12,000 BTU Ductless Split System A/C UnitsCity of Philadelphia · 2020
FOR THE INSTALLATION OF A NEW HVAC SYSTEM ASSOCIATED DUCT WORK, AND EIGHTEEN (18) REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION.City of Philadelphia · 2020
Heat PumpsYardley Borough · 2018$21,927
Water Heater & Oil TankYardley Borough · 2017$14,000
FOR THE INSTALLATION OF A NEW HVAC SYSTEM INCLUDING NEW DUCT WORK, FLEX, REGISSTERS AND SET OF 3 ROOF TOP UNITS AS PER PLANS.City of Philadelphia · 2017
FOR THE INSTALLATION OF SPLIT & DUCTLESS HEATING & AIRCONDITIONING UNITS AND ALL ASSOCIATES REGISTERS, DIFFUSERS, AND DUCTWORK, AND SHOWN IN APPROVED PLANS (P.H.C. APPROVAL, 12.22.2016).
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you Ivey Air, Inc.?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2017
INSTALLATION OF NEW HVAC SYSTEM FOR 1ST & 2ND FLOOR FRONT OFFICES TO INCLUDE DUCT WORK, SPLIT SYSTEME UNITS, REFRIGERANT PIPING, HEAT RECOVERY UNIT, ENERGY VENTILATOR, CONTROLS, AIR BALANCING, DUCT INSULATION, FIRE SEALANT, EQUIPMENT STARTUP, RIGGING OF EQUIPMENT, ROOF TOP EQUIPMENT CURBS AND EQUIPMETN SUPPORT RAILS AS PER APPROVED PLANS.City of Philadelphia · 2016
INSTALL ALL NEW SUPPLY AND RETURN AIR DUCT WORK,COMPLETE WITH REGISTERS INSTALL NEW GAS FURNACE 90K 90%City of Philadelphia · 2016
ALTERATION: INTERIOR PLUMBING TO 12-STORY MIXED USE BLDGS. WITH (282) DWELLING UNITS, (15) OF WHICH ARE ACCESSIBLE UNITS. REPLACING 282 TOILETS, BATHROOM FAUCETS, KITCHEN SINKS AND FAUCETS, SHOWER HEADS AND MIXING VALVES, REPLUMBING 15 UNITS FOR ADA - 1083 REPLACEMENT WITH NO ADDITIONAL PIPING AND 45 NEW FIXTURES - THE INSTALLATION WILL COMPY WITH THE PHILADEPHIA PLUBMING CODE 2004City of Philadelphia · 2016
FOR THE INSTALLATION OF ONE (1) 2-TON DUCTLESS SPLIT SYSTEM AND BATHROOM EXHAUST FAN (WITH SUPPLEMENTAL DUCTWORK) AND INITIATING THE USE OF THREE (3) EXISTING SPLIT SYSTEMS AS SHOWN IN APPROVED PLANS.City of Philadelphia · 2016
REPLACE 3 EXISTING BOILERS, REPLACE 2 EXISTING HOT WATER HEATERS, INSTALL 280 NEW EXHAUST GRILLES, INSTALL NEW THERMOSTAT ON THE EXISTING FAN OIL UNITS.City of Philadelphia · 2016
Permitted projects on public record. Addresses are omitted for privacy.