What the public permit record shows, not self-reported reviews.
Is Independent Electrical Services, LLC a real contractor?
Independent Electrical Services, LLC appears in public building-permit records with 74 permits filed through 2025 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is Independent Electrical Services, LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to Independent Electrical Services, LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is Independent Electrical Services, LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. Independent Electrical Services, LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is Independent Electrical Services, LLC's work?
The most recent permit on record for Independent Electrical Services, LLC is dated 2025-12-15, with 74 permits on file in total.
Install a 200-amp feeder and subpanel to the existing electrical service. Install wiring, lighting, switches, lighting controls, emergency lighting, telecommunication wiring, and receptacle outlets. Install interconnected smoke and carbon monoxide alarms. Install the fire alarm system. All work to be done in accordance with the 2017 NEC, 2016 NFPA 72 and per approved plansCity of Philadelphia · 2025
Install lighting and lighting controls, receptacles, telecommunications wiring, (1) patch panel, (19) Cat-6 lines, and power to equipment as per 2017 NEC.
Install 1-Pull Station, 12-Horn Strobes, and 1-Strobe only as per 2016 NFPA 72.City of Philadelphia · 2025
Electrical Permit for combo CP-2025-004182 :ELECTRIC: Install all electric and fire alarm for 2-4 fls alterations ,from existing panels. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.City of Philadelphia · 2025
ROOF:
1-GFCI
1-CU Disconnect
1-HP Disconnect
LIGHTING
SWITCHES:
Controls -1
RECEPTACLES:
20 amp WR / GFCI-3
DISTRIBUTION:
P2A Panel
Breakers in Existing Distribution
Install FIRE ALARM according to approved drawings
DATA:
Rings and Strings
ACCESS CONTROL:
Rings and Strings
CAMERA SYSTEM
Rings and Strings
Ev Charger power and Equipment
Union Wage Labor
Saw Cutting and Patching
Expediting Material Fees
Weekend and Overtime Labor Wages
Drywall Patching and Painting
Arc Flash / Short Circuit and Coordination Study
WAP Equipment and Wiring
Fiber Optic Terminations
Data Equipment and Wiring
CCTV System and Wiring
Access Control System and Wiring
Fire Caulking . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE.City of Philadelphia · 2025
-Remove and safe off existing recess lighting and receptacles in the
kitchen
FURNISH AND INSTALL THE FOLLOWING:
-Furnish and install (2) dedicated circuits for small appliances on
counter tops
-Furnish and install (1) dedicated circuit for refrigerator
-Furnish and install (1) dedicated circuit for microwave
-Furnish and install (1) dedicated cord and plug connection for dish
washer
-Furnish and install (1) 240-volt 50-amp cord and plug circuit for
oven
-Furnish and install (1) dedicated cord and plug connection for
disposal
-Furnish and install (12) 4” LED recess lights on 3-way toggle
switch
-Furnish an install (1) pendent light fixture over the sink on single
pole toggle switch
-Furnish and install (1) wall scone on single pole toggle switch
-Reconfigure existing washer feed to accommodate new location
-Reconfigure existing dryer feed to accommodate new location
HVAC:
-Furnish an install (1) dedicated 20-amp 240-volt circuit for roof top
mini split
-Furnish and install (1) dedicated 120-volt 20-amp GFCI with in 25’ on unit
*All kitchen electrical will ??e arc fault protected based on 2017
NEC
*All Kitchen circuities will be GFCI protected based on 2017 NEC
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you Independent Electrical Services, LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to Independent Electrical Services, LLC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2025
Existing 1600 amp service. Install lighting, exit/emergency lighting, receptacles, power to HVAC, power to equipment, and telecommunications wiring as per 2017 NEC. Install fire alarm as per 2016 NFPA 72.City of Philadelphia · 2025
INSTALL A 1200 AMP 120/208V 3 PHASE SERVICE & 1200 AMP MDP. INSTALL PANELS & FEEDERS. INSTALL LIGHTS NORMAL, EMERGENCY & SITE LIGHTING. INSTALL SWITCHES, SENSORS & LIGHTING CONTROLS. PROVIDE POWER FOR THE MECHANICAL, HVAC, ELEVATOR & KITCHEN EQUIPMENT. INSTALL A NEW ADDRESSABLE FIRE ALARM SYSTEM THROUGHOUT. ALL WORK IN ACCORDANCE WITH THE 2017 NEC.City of Philadelphia · 2025
Install Conduit and Junction Boxes Per Site Drawing for service and distribution work(separate electrical permits will be needed for interior wiring and fitout work)
Chocolate Factory – Electrical Service and Site Lighting
Furnish and install the secondary electrical duct bank with (Six)
4” schedule 40 conduits encased in concrete from the pad mount
transformer to the electrical room as indicated on sheet E_401 and
details 2 & 3/E_801. The pad mount transformer and primary duct
bank are existing.
Furnish and install two 2” conduits from the utility pole to the
network room for data service as shown on sheet E_401. Conduit
quantities and size differ from what is shown on the drawings.
Furnish and install all cable, feeders, wire pulls, terminations, and
switching beginning at the secondary side of the existing PECO pad
mounted transformer. Include all work as indicated on the
marked-up E_600, Single Tenant Electrical Switchgear
Modification .
Furnish and install Single PECO meter.
Furnish and install (Two) 208 volt 3ph/800Amp switchboards
with main circuit breakers, located in the 1st floor electrical room.
Furnish and install panels H, H1, H2, and H3. Panels H1, H2, and
H3 shall be in accordance with panel schedules on sheet E_700.
Locate H and H1 on the 1st floor, H2 on the 2nd floor and H3 on
the 3rd floor as shown.
Furnish and install the 1st floor distribution Panel 101. Panel 101
to be 200 amps. Locate Panel 101 in the 1st floor electrical room.
Include forty-two single pole twenty amp breakers.
Furnish and install the 2nd floor distribution Panel 102. Panel
102 to be 400 amps. Locate Panel 102 on the 2nd floor with Panel
H2. Include forty-two single pole twenty amp breakers.
Furnish and install the 3rd floor Distribution panel 203. Panel
203 to be 400 amps. Locate Panel 203 on the 3rd floor with panel
H3. Include forty-two single pole twenty amp breakers.
Furnish and install the rooftop mechanical distribution panel
301City of Philadelphia · 2024
-Furnish and install (1) toggle switch to (2) existing ceiling light
fixtures
_________________________________________________
OFFICE:
-Demo and safe off receptacles in common wall with assembly space
-Furnish and install (3) duplex receptacles off existing circuitry
_________________________________________________
AV ROOM:
-Furnish an install (1) toggle switch to (1) existing ceiling light
fixtures
-Furnish and install (2) duplex receptacles off existing circuitry
_________________________________________________
ASSEMBLY SPACE 1:
Reconfigure existing light fixtures to new lighting lay out
- (23) 2x2 existing to remain light fixtures on single pole dimmer
- (5) 2x2 existing to remain light fixtures on a single pole dimmer
- (4) ceiling mounted pendants on (1) single pole dimmer (lights to
be bought by others)
Furnish and install 0-10v dimming cable to all light fixtures
Furnish an install (1) duplex receptacle off existing circuity
(Blocking by others)
_________________________________________________
LOBBY:
-Furnish and install (2) ceiling junction boxes for (2) owner
supplied chandeliers on existing single pole switch
-Furnish and install (2) wall scones on single pole toggle switch
(Light fixtures by other)
-Furnish and install (1) duplex receptacle off existing circuitry for
TV
-Furnish and install (1) dedicated circuit for electric fireplace
-Furnish and install (1) duplex receptacle in the lobby
__________________________________________________
ASSEMBLY SPACE 2:
Reconfigure existing light fixtures to new lighting lay out
(11) 2x2 existing to remain light fixtures on single pole dimmer
- (10) 2x2 existing to remain light fixtures on a single pole dimmer
- (2) ceiling mounted pendants on (2) single pole dimmers (lights to
be bought by others)
Furnish and install 0-10v dimming cable to all light fixtures
Furnish an install (2) duplex receptacle off existing circuity .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWICity of Philadelphia · 2024
Whole house re-wire
BASEMENT
5- Keyless on a single pole toggle switch
1- 30-amp dryer
1- 20-amp washing machine
1- 100-amp panel
LIVING ROOM
1- Exterior light fixture on single pole toggle switch
4- LED recess lights on single pole toggle switch
1- ceiling fan on single pole toggle switch
1- 3-way toggle for upstairs hallway
4- duplex receptacles
1- interconnected hardwired carbon smoke
DINNING ROOM
1-ceiling light fixture on single pole toggle switch
2- 20-amp duplex receptacles
KITCHEN
3- Led Recess lights on single pole toggle switch
1- Exterior light fixture on single pole toggle switch
2- 20-amp dedicated small appliance circuits
1- 20-amp dedicated dish washer
1- 20-amp dedicated disposal
1- 20-amp dedicated microwave
1- 20-amp dedicated fridge
1- 20-amp dedicated oven
BEDROOM 1
1- Ceiling box on single pole toggle switch
4- duplex receptacles
1- hardwire smoke detector
BEDROOM 2
1- Ceiling box on single pole toggle switch
4- duplex receptacles
1- hardwire smoke detector
BEDROOM 3
1- Ceiling box on single pole toggle switch
4- LED recess on single pole toggle switch
5- duplex receptacles
1- hardwire smoke detector
BATHROOM
1- Vanity light on single pole toggle switch
1- 20-amp GFCI protected receptacle
HALLWAY
1- Hardwired Interconnected carbon smoke
1- ceiling light fixture on 3-way toggle switchCity of Philadelphia · 2024
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS TWO FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER 13R WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. MASTER APPROVAL-RP-2020-003735City of Philadelphia · 2024
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS TWO FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER 13R WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. SEE MASTER RP-2020-003735City of Philadelphia · 2024
Permitted projects on public record. Addresses are omitted for privacy.