What the public permit record shows, not self-reported reviews.
Is IGNACIO RAMOS a real contractor?
IGNACIO RAMOS appears in public building-permit records with 16 permits filed through 2025 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is IGNACIO RAMOS's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to IGNACIO RAMOS by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is IGNACIO RAMOS licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. IGNACIO RAMOS has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is IGNACIO RAMOS's work?
The most recent permit on record for IGNACIO RAMOS is dated 2025-03-24, with 16 permits on file in total.
**MAKE SAFE PERMIT** FOR THE INSTALLATION OF STAR BOLTS AND MASONRY REPAIR AT THE FRONT EXTERIOR WALL TO COMPLY WITH VIOLATION CASE # CF-2024-106179. NOT TO EXCEED SCOPE OF WORK NOTED IN ENGINEER'S REPORT AND SHOWN ON APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ANY ADDITIONAL ALTERATIONS THAT ARE NOT SPECIFICALLY ADDRESSED ON CASE # CF-2024-106179. IN ACCORDANCE WITH CODE BULLETIN PM-1801, A PA PROFESSIONAL ENGINEER IS REQUIRED TO MONITOR REPAIRS MADE UNDER THIS PERMIT. THE ENGINEER MUST SUBMIT A SEALED STATEMENT TO THE DEPARTMENT CONFIRMING THAT THE STRUCTURE IS IN SOUND CONDITION AT COMPLETION. MAKE SAFE PERMIT ONLY.City of Philadelphia · 2025
**MAKE SAFE PERMIT** FOR THE INSTALLATION OF STAR BOLTS AND MASONRY REPAIR AT THE FRONT EXTERIOR WALL TO COMPLY WITH VIOLATION CASE # CF-2024-106150. NOT TO EXCEED SCOPE OF WORK NOTED IN ENGINEER'S REPORT AND SHOWN ON APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ANY ADDITIONAL ALTERATIONS THAT ARE NOT SPECIFICALLY ADDRESSED ON CASE # CF-2024-106150. IN ACCORDANCE WITH CODE BULLETIN PM-1801, A PA PROFESSIONAL ENGINEER IS REQUIRED TO MONITOR REPAIRS MADE UNDER THIS PERMIT. THE ENGINEER MUST SUBMIT A SEALED STATEMENT TO THE DEPARTMENT CONFIRMING THAT THE STRUCTURE IS IN SOUND CONDITION AT COMPLETION. MAKE SAFE PERMIT ONLY.City of Philadelphia · 2025
FOR LEVEL II ALTERATIONS TO AN EXISTING MIXED USE BUILDING FOR USE AS A MERCANTILE (M) OCCUPANCY ON THE FIRST FLOOR, WITH ONE DWELLING UNIT (R-3 OCCUPANCY) ON THE SECOND FLOOR. NO CHANGE IN USE OR OCCUPANCY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2025
FOR THE ERECTION OF ROOF DECK ACCESSORY TO EXISTING SINGLE FAMILY DWELLING AND INSTALLATION OF LINTEL AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ANY OTHER WORK.City of Philadelphia · 2024
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you IGNACIO RAMOS?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Demolition of existing nonconforming 2 story rear addition to existing 3 story SFD. New addition to be built consisting of 3 stories at rear and roof deck atop both new and existing structures, with required 5' setback from front property line. Basement shall be underpinned and new egress well is proposed. Rear yard access provided by existing ground level alley from street.City of Philadelphia · 2022
FOR EXCAVATION, FOUNDATION WALL UNDERPINNING AND CONCRETE SLAB FLOOR IN BASEMENT OF EXISTING BUILDING. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING. NO INTERIOR FIT-OUT OF BASEMENT UNDER THIS PERMIT.City of Philadelphia · 2022
MAKE SAFE PERMIT TO RESOLVE CASE VIOLATION # CF-2021-058360 FOR REMOVE/REPLACE PORTION OF SIDE WALL WHICH IS DAMAGED AS PER PLAN, AND INSTALLTION OF FIVE (5) STAR BOLTS ON FRONT WALL, AS PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT THE DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS WILL BE REQUIRED FOR ANY ADDITIONAL ALTERATIONS NOT ADDRESSED IN THE PLANS. Abutting sidewalk must be closed with fencing a minimum of 6 ft. in height. Separate Streets Department permit required for sidewalk closure. In accordance with Code Bulletin PM-1801, a PA professional engineer is required to monitor repairs made under this permit. The engineer must submit a sealed statement to the Department confirming that the structure is in sound condition at completion.City of Philadelphia · 2021
ALTERATION TO INCLUDE INTERIOR RENOVATION OF THE EXISTING STRUCTURE TO CONVERT FROM A TWO-FAMILY DWELLING UNIT TO A MULTI-FAMILY DWELLING UNIT (3 UNITS). BUILDING TO BE SPRINKLERED WITH NFPA 13R.City of Philadelphia · 2021
Installation of a new 3 TON AC UNIT
- New duct work
- Install 16 registers See RP-08538City of Philadelphia · 2021
This permit is to replace GM-2021-001705 that was issued in error & closed.
EZ PERMIT STANDARDS ALTERATIONS - For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Structural alteration or repair is expressly prohibited under this permit. Prohibited structural work any modifications to exterior walls, party walls, floor/roof framing or foundations, including underpinning, excavation, and removal of foundation slab. WORK IN THE BASEMENT OR CELLAR IS NOT INCLUDED ON THE EZ ALT PERMIT. Separate permits required for Mechanical, Electric and Plumbing. Interior demolition to non-load bearing walls, Install new windows on first and second floor with no change in size of openings or locations, Replace all interior doors, Install ceramic tile on bathroom floor and tub surround, Install laminate flooring on first and second floor, Install new kitchen cabinets, Partial GWB on first and second floor where needed.City of Philadelphia · 2021
BASEMENT EGRESS OPENING AND FRONT YARD RETAINING WALL AS PER PLAN AND ENGINEER'S REPORT.City of Philadelphia · 2021
For removing / replacing rotten joist AS PER PLAN on 1st floor only. Separate permits required for any further renovation work.City of Philadelphia · 2020
Permitted projects on public record. Addresses are omitted for privacy.