What the public permit record shows, not self-reported reviews.
Is HSC Construction Inc a real contractor?
HSC Construction Inc appears in public building-permit records with 50 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is HSC Construction Inc's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to HSC Construction Inc by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is HSC Construction Inc licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. HSC Construction Inc has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is HSC Construction Inc's work?
The most recent permit on record for HSC Construction Inc is dated 2026-05-15, with 50 permits on file in total.
Site / Utility Permit for CP-2025-005965City of Philadelphia · 2026
FOR EXCAVATION WORK ASSOCIATED WITH NEW CONSTRUCTION AS PER APPROVED PLANS. WORK TO INCLUDE TEMPORARY EXCAVATION SUPPORT SYSTEM. NO BUILDING CONSTRUCTION APPROVED ON THIS PERMIT. SEE ZP-2022-002981 FOR ZONING APPROVAL OF DEVELOPMENT. *2018 IBC REVIEW*
**SEPARATE PERMITS REQUIRED FOR BUILDING CONSTRUCTION**
**ISSUANCE OF THIS EXCAVATION PERMIT SHALL NOT BE CONSTRUED TO ESTABLISH ASSURANCE THAT A PERMIT FOR THE ERECTION OF THE ENTIRE STRUCTURE WIL BE GRANTED.**City of Philadelphia · 2026
FOR THE EXCAVATION WORK PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2026
FOR THE CONSTRUCTION OF FOUNDATION AS PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE
START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2026
FOR THE EXCAVATION AND UNDERPINNING TO THE ABUTTING STRUCTURE ASSOCIATED WITH THE NEW CONSTRUCTION. ALL WORK TO BE DONE PER THE APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT THE DESIGN ENGINEER PRIOR TO THE START OF WORK. SEPARATE PERMITS REQURIED FOR ALL OTHER WORK. ***********PROTECTION OF ADJACENT STRUCTURES TO BE MAINTAINED DURING EXCAVATION ACTIVITY. SCOPE INCLUDES SPECIAL INSPECTIONS OF STRUCTURAL STABILITY OF ADJACENT STRUCTURES IN ACCORDANCE WITH B-1704.6.4. **********************City of Philadelphia · 2026
EXCAVATION WORK ASSOCIATED WITH BUILDING FOUNDATION AND ADDITION WORK (SEE PERMITS SP-2025-001391 & CP-2025-006499) TO INCLUDE SHEETING AND SHORING AS PER APPROVED PLANS. *2018 IBC REVIEW*
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you HSC Construction Inc?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to HSC Construction Inc's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2026
Site / Utility Permit for CP-2024-002493City of Philadelphia · 2026
FOR EXCAVATION AND UNDERPINNING ONLY PER APPROVED PLANS. SEPARATE PEMRITS REQUIRED FOR MEP WORK.City of Philadelphia · 2026
EXCAVATION WORK ASSOCIATED WITH A MIXED USE NEW CONSTRUCTION BUILDING (SEE PERMIT CP-2025-001778) AS PER APPROVED PLANS. WORK TO INCLUDE UNDERPINNING TO BE MONITORED AT ALL TIMES BY A PA LICENSED PE. *2018 IBC REVIEW*City of Philadelphia · 2025
FOR SITEWORK AND UNDERPINNING PER APPROVED PLAN. *SEPARATE PERMITS REQUIRED FOR BUILDING, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.*City of Philadelphia · 2025
FOR EXCAVATION ONLY PER APPROVED PLAN. SEPARATE PERMITS REQUIRED FOR BUILDING, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION.City of Philadelphia · 2025
Site / Utility Permit for CP-2025-002940City of Philadelphia · 2025
Permitted projects on public record. Addresses are omitted for privacy.