What the public permit record shows, not self-reported reviews.
Is HONG DA CONSTRUCTION INC a real contractor?
HONG DA CONSTRUCTION INC appears in public building-permit records with 84 permits filed through 2025 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is HONG DA CONSTRUCTION INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to HONG DA CONSTRUCTION INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is HONG DA CONSTRUCTION INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. HONG DA CONSTRUCTION INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is HONG DA CONSTRUCTION INC's work?
The most recent permit on record for HONG DA CONSTRUCTION INC is dated 2025-11-26, with 84 permits on file in total.
Retail Sales - Food, Beverages, and Groceries; Eating and Drinking Establishments - Prepared Food ShopCity of Philadelphia · 2025
FOR LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE FOR USE AS A BUSINESS OCCUPANCY, ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **BUILDING IS NEW CONSTRUCTION - SEE CP-2023-006062 FOR ONGOING WORK **City of Philadelphia · 2025
FOR LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE FOR USE AS A BUSINESS OCCUPANCY, ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **BUILDING IS NEW CONSTRUCTION - SEE CP-2023-006062 FOR ONGOING WORK **
**AMENDMENT (7-18-2025): FOR CHANGES TO FLOOR PLANS AS PER THE APPROVED AMENDED CONSTRUCTION DRAWINGS.
**AMENDMENT (4-23-2026): FOR CHANGES TO FLOOR PLANS AS PER THE APPROVED AMENDED CONSTRUCTION DRAWINGS.City of Philadelphia · 2025
**AMENDMENT 12/3/2024 TO CHANGE MODULAR COMPANY AND MODULAR PLAN. AMEND THE INTERIOR LAYOUT FOR THE FIRST FLOOR, ADD GREEN ROOF ABOVE EXISTING ROOF, AND AMEND THE STRUCTURAL PLAN. **
FOR THE ERECTION OF A FIVE (5)-STORY ADDITION TO AN EXISTING ONE (1)-STORY BUILDING FOR THE USE OF THREE (3) COMMERCIAL TENANT SPACES ON FIRST FLOOR (SEPARATE USE PERMIT AND CERTIFICATE OF OCCUPANCY REQUIRED PRIOR TO OCCUPANCY) & NINETY FOUR (94) NEW DWELLING UNITS ON SECOND THROUGH SIXTH FLOOR. MODULAR CONSTRUCTION FROM 2ND FLOOR TO SIXTH FLOOR. BUILDING TO UTILIZE HORIZONTAL SEPARATIONS TO CREATE TWO (2) SEPARATE BUILDINGS WITH TWO (2) DIFFERENT CONSTRUCTION TYPES (FIRST FLOOR- TYPE IA AND 2ND THROUGH 6TH FLOORS - TYPE IIIA). MODULAR CONSTRUCTION APPROVED BY THIRD PARTY AGENCY FOR 2ND THROUGH 6TH FLOORS. FIRE RETARDANT TREATED STUDS AND SHEATHING REQUIRED FOR TYPE III CONSTRUCTION. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13 AND INCLUDE STANDPIPES PER NFPA 14. FIRE WATCH REQUIRED PER CODE BULLETIN F-2001. *2018 IBC REVIEW* ALL WORK TO BE DONE PER APPROVED PLANS. ***A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 19 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.***
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you HONG DA CONSTRUCTION INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to HONG DA CONSTRUCTION INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2024
FOR THE NEW CONSTRUCTION OF A THREE (3) STORY WOOD-FRAME STRUCTURE ON REINFORCED CONCRETE FOOTINGS/FOUNDATIONS FOR USE AS A MULTI-FAMILY HOUSEHOLD LIVING FOR THREE (3) DWELLING UNITS THROUGHOUT. BUILDING SHALL BE FULLY SPRINKLERED PER NFPA 13R. **EXCAVATION WORK TO BE INCLUDED IN THE SCOPE OF WORK** SEPARATE PERMITS REQUIRED FOR ALL MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION SYSTEMS. **PROTECTION OF RIGHT-OF-WAY / PEDESTRIANS / ADJACENT PROPERTIES REQUIRED DURING ALL CONSTRUCTION. **ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. ** AMENDED AS OF 4/23/2024 FOR A CELLAR FLOOR LAYOUT MODIFICATION PER PLANS** UNDERPINNING WORK TO BE INCLUDED IN THE NEW SCOPE OF WORK**City of Philadelphia · 2023
For the erection of retaining wall in the rear yard per plans.City of Philadelphia · 2023
FOR THE ERECTION OF 2-STORY (FLOOR 1-2) TYPE IA STRUCTURE AND ERECTION OF 5-STORY (FLOORS 3-7) TYPE IIIA MODULAR CONSTRUCTION ABOVE (TOTAL OF 7-STORIES) AS PER APPROVED PLANS. FOR USE AS VACANT COMMERCIAL SPACES AND 70 DWELLING UNITS. BUILDING TO BE SPRINKLERED PER NFPA 13 THROUGHOUT. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. **NO EXCAVATION SHALL EXCEED 5FT BELOW GRADE. IF EXCEEDED SEPARATE PERMIT REQUIRED.**
AMENDMENT 5/22/24 TO CHANGE SPECIAL INSPECTION AGENCY.
AMENDMENT 4/30/25 TO INCLUDE LAYOUT CHANGES AT SECOND FLOOR.
AMENDMENT 4/14/25 FOR 1ST FLOOR LAYOUT CHANGES
AMENDMENT 3/30/26 FOR 1ST & 2ND FLOOR LAYOUT CHANGES.City of Philadelphia · 2023
REAR BUILDING ADDITION AND INTERIOR RENOVATION FOR EXISTING 2-STORY SINGLE-FAMILY RESIDENTIAL BUILDING. DETAILS AS SHOWN ON PLAN.City of Philadelphia · 2023
MAKE-SAFE PERMIT: FOR THE REMOVAL OF A REAR PORTION OF THE EXISTING ATTACHED STRUCTURE AND THE INFILL OF THE EXISITNG WALL OPENING TO RESOLVE CASE CF-2022-095705. ALL WORK TO BE DONE PER APPROVED PLANS AND ENGINEERING INSPECTION LETTER. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. “A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 8 FEET OF THE BUILDING FAÇADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.” A SEPARATE PERMIT IS REQUIRED FOR ANY ADDITIONAL ALTERATIONS THAT ARE NOT SPECIFICALLY ADDRESSED ON CASE CF-2022-095705. "IN ACCORDANCE WITH CODE BULLETIN PM-1801, A PA PROFESSIONAL ENGINEER IS REQUIRED TO MONITOR REPAIRS MADE UNDER THIS PERMIT. THE ENGINEER MUST SUBMIT A SEALED STATEMENT TO THE DEPARTMENT CONFIRMING THAT THE STRUCTURE IS IN SOUND CONDITION AT COMPLETION."City of Philadelphia · 2022
FOR UNDERPINNING AND FOR NEW CONSTRUCTION OF AN ATTACHED BUILDING WITH CELLAR AND ROOF DECK ACCESSED BY A ROOF ACCESS STRUCTURE. FOR A SINGLE-FAMILY HOUSEHOLD LIVING. AS PER PLANS.
******* SEPARATE PERMITS ARE REQUIRED FOR PLUMBING, MECH., OR ELECTRICAL WORK. **************City of Philadelphia · 2022
FOR ALTERATIONS TO AN EXISTING STRUCTURE TO REPLACE 1ST FLOOR FRONT WALL TILE AND INSTALL METAL PANEL SIDING OVER EXISTING STUCCO. **SEPARATE PERMITS TO BE REQUIRED FOR ANY PLUMBING, MECHANICAL, ELECTRICAL, AND FIRE SUPPRESSION SYSTEM INSTALLATIONS. **
AMENDED AS OF 10.14.2022: To change footing detail due to site condition.City of Philadelphia · 2022
*** AMENDMENT APPROVED ON 10/13/2022: TO AMENDMENT PREVIOUSLY APPROVED BUILDING PERMIT # RP-2022-002237, TO DOCUMENT CHANGES ADD STRUCTURAL POST IN THE FRONT OF BUILDING CORNER AND THE REMAINING PERMIT SAME AS PREVIOUSLY APPROVED. SIZE AND LOCATION AS SHOWN ON THE PLANS.
**AMENDMENT APPROVED ON 9/16/2022: TO AMENDMENT PREVIOUSLY APPROVED BUILDING PERMIT # RP-2022-002237, TO DOCUMENT CHANGES TO REVISED FOUNDATION PLAN MATCH WITH STRUCTURAL DRAWING AND DETAIL AND THE REMAINING PERMIT SAME AS PREVIOUSLY APPROVED. SIZE AND LOCATION AS SHOWN ON THE PLANS**
FOR NEW CONSTRUCTION OF A THREE (3) STORY WOOD-FRAME ATTACHED STRUCTURE ON REINFORCED CONCRETE FOOTINGS/FOUNDATIONS WITH FRONT EGRESS WELL, ROOF DECK AND ONE ROOF ACCESS STRUCTURE. FOR USE AS A SINGLE-FAMILY DWELLING THROUGHOUT. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLAN. BUILDING SHALL BE FULLY SPRINKLERED, SEPARATE PERMITS REQUIRED FOR FIRE SUPPRESSION SYSTEMS.
*PROTECTION OF RIGHT-OF-WAY / PEDESTRIANS / ADJACENT PROPERTIES REQUIRED DURING ALL CONSTRUCTION.*City of Philadelphia · 2022
Permitted projects on public record. Addresses are omitted for privacy.