Is HM Conco LLC a real contractor?
HM Conco LLC appears in public building-permit records with 8 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is HM Conco LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to HM Conco LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is HM Conco LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. HM Conco LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is HM Conco LLC's work?
The most recent permit on record for HM Conco LLC is dated 2026-04-09, with 8 permits on file in total.
NEW CONSTRUCTION OF A FIVE (5) STORY BUILDING WITH CELLAR, ROOF DECK AND PILOT HOUSES FOR USE AS GROUND FLOOR SHELL COMMERCIAL SPACES (USE REGISTRATION & FIT-OUT PERMITS REQUIRED PRIOR TO OCCUPANCY), SIXTY-SIX (66) DWELLING UNITS AND ACCESSORY PARKING AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13 AND INCLUDE STANDPIPES PER NFPA 14. BUILDING UTILIZES GREEN ROOF AND MIXED INCOME HOUSING BONUS. FIRE-RETARDANT TREATED WOOD STUDS AND SHEATHING REQUIRED IN EXTERIOR WALLS FOR TYPE III CONSTRUCTION. FIRE WATCH REQUIRED PER DEPARTMENT CODE BULLETIN F-2001. *2018 IBC REVIEW*
**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**City of Philadelphia · 2026
INITIAL FITOUT TO CREATE ARTIST STUDIOS AND ARTISAN INDUSTRIAL ON THE 1ST FLOOR FRONT AS PER APPROVD PLANS. BUILDING TO BE FULLY SPRINKLERED. SEPARATE PERMITS REQUIRED FOR MEP AND FP WORK.City of Philadelphia · 2025
FOR ERECTION OF AN ATTACHED STRUCTURE WITH CELLAR AND AN ACCESSORY ROOF DECK (FOR RESIDENTIAL USE ONLY) WITH TWO ROOF ACCESS STRUCTURES. FOR VACANT COMMERCIAL SPACE ON FIRST FLOOR (MUST OCCUPY 100% OF THE GROUND FLOOR STREET FRONTAGE (PRIMARY FRONTAGE) WITH A MINIMUM DEPTH OF 30') (USES ONLY PERMITTED IN CMX-2 THAT NOT TO REQUIRE OFF STREET PARKING AS PER TABLE 14-802-2, USE REGISTRATION PERMIT IS REQUIRED PRIOR TO OCCUPANCY) AND FOR MULTI-FAMILY HOUSEHOLD LIVING THIRTY-EIGHT (38) DWELLING UNITS AND SIXTEEN (16) ACCESSORY BICYCLE (CLASS 1A) PARKING SPACES ON AN ACCESSIBLE ROUTE. BUILDING TO BE FULLY SPRINKLERED. SEPARATE PERMITS REQUIRED FOR MEP &FP WORK. SEPARATE APPROVAL REQUIRED FROM PA L&I FOR ELEVATOR INSTALLATION. HORIZONTAL EXITS ARE PROPOSED ABOVE 1ST FLOORS.
AMENDMENT TO INCLUDE DEFERRED TRUSS DRAWING SEALED BY Strzyzewski, Marvin, P.E. ON October 14,2022.
Amendment for structural field changes as per revised plans and structural report.City of Philadelphia · 2022
AMENDMENT#4 for revision to the electrical room partition assembly. No change to the partition locations or to the partition fire ratings.
AMENDMENT III: FOR THE AMENDMENT OF CP-2021-004975 TO DOCUMENT CHANGE IN SPECIAL INSPECTION AGENCY. ALL WORK TO BE DONE PER APPROVED DOCUMENTATION.
AMENDMENT II: FOR THE AMENDMENT OF CP-2021-004975 TO DOCUMENT CHANGE IN LAYOUT AND REDUCTION OF ELEVATOR. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
AMENDMENT I: FOR THE AMENDMENT OF PREVIOUSLY APPROVED PERMIT CP-2021-004975 TO DOCUMENT CHANGE IN LAYOUT ON THE FIRST FLOOR WITH COMPLETE INFILL OF CELLAR AS SHOWN PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
ORIGINAL: FOR THE ERECTION OF A FOUR STORY ADDITION TO AN EXISTING TWO STORY ATTACHED STRUCTURED FOR USE AS THE FOLLOWING: FOR AN ARTIST STUDIO AND ARTISAN INDUSTRIES AT GROUND FLOOR ( ATLEAST 50% OF THE GROUND FLOOR AREA) AND SECOND FLOOR LEVEL WITH MULTI-FAMILY HOUSEHOLD LIVING ( 49 DWELLING UNITS) FROM SECOND (2ND) FLOOR THROUGH SIXTH (6TH ) FLOORS WITH SEVEN(7) ACCESSORY PARKING SPACES, ONE(1) VAN ACCESSIBLE SPACE , TWO(2) AUTO SHARE SPACES AND EIGHTEEN(18) BICYCLE SPACES ON AN ACCESSIBLE ROUTE AT GROUND FLOOR. ALL UNITS ARE TYPE B WITH THE EXCEPTION OF THE ONE (1) REQUIRED TYPE A UNIT. STRUCTURE TO CONTAIN A ROOF DECK ABOVE THE 6TH FLOOR LEVEL ACCESSED BY ROOF DECK ACCESS STRUCTURES. BUILDING COMPOSED OF TWO DIFFERENT CONSTRUCTION TYPES (TYPE IA(BASEMENT-FIRST FLOOR LEVEL) AND TYPE IIIB (FIRE RETARDANT TREATED WOOD) CONSTRUCTION (SECOND-SIXTH FLOOR LEVEL). BUILDING IS FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 AND STANDPIPES TO BE PROVIDED IN THE EXIT STAIRWAYS PER NFPA 14. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSU
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you HM Conco LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2021
FOR THE ERECTION OF A SEMI-ATTACHED, LIGHT-FRAMED STRUCTURE TO INCLUDE EGRESS WINDOW WELLS, TYPE B ACCESSIBLE UNITS, RATED SHAFT ENCLOSURE ASSEMBLIES, CLOSED-CELL SPRAY-FOAM INSULATION, AND RATED FLOOR-CEILING ASSEMBLIES PER PLANS REVIEWED BY HISTORICAL COMMISSION. (IBC 2018) **SEPARATE PERMITS REQ'D FOR MECHANICAL, PLUMBING, ELECTRICAL, AND FIRE SUPPRESSION SYSTEM INSTALLATIONS. SEPARATE PERMITS WILL BE REQUIRED FOR PARCEL D.**City of Philadelphia · 2020
For the erection of a new construction used as four dwelling units. Building to be fully sprinklered. Separate permits required for M.E.P.S work.City of Philadelphia · 2020
ERECTION OF A NEW THREE (3) STORY BUILDING, WITH BASEMENT. FOR USE AS MULTI-FAMILY HOUSEHOLD LIVING AS PER PLANS. STRUCTURE TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13R.?ALL WORK TO BE DONE PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.City of Philadelphia · 2020
Partial Demolition work. Level III interior alterations and structural work to create three (3) dwelling units as per approved plans. Special inspections to be included on this permit application. Building to be sprinklered per NFPA 13. Separate permit required for and MEP and fire suppression work.
Amend permit on 12/21/20 to update structural design as per approved plans.
Amend permit on 8/16/21 to remove special inspections from the application.City of Philadelphia · 2020