What the public permit record shows, not self-reported reviews.
Is Hightec HVAC, Inc. a real contractor?
Hightec HVAC, Inc. appears in public building-permit records with 14 permits filed through 2024 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is Hightec HVAC, Inc.'s track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to Hightec HVAC, Inc. by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is Hightec HVAC, Inc. licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. Hightec HVAC, Inc. has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is Hightec HVAC, Inc.'s work?
The most recent permit on record for Hightec HVAC, Inc. is dated 2024-12-10, with 14 permits on file in total.
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2024
Mechanical / Fuel Gas Permit for combo RP-2021-014975City of Philadelphia · 2024
FOR THE INSTALLATION OF A NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, ROOFTOP UNITS, DUCTLESS SYSTEMS, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSIONCity of Philadelphia · 2024
INSTALLATION OF NEW HVAC SYSTEM THROUGHOUT A COMMERCIAL BUSINESS BUILDING AS PER APPROVED PLANS. *2018 IMC REVIEW*City of Philadelphia · 2022
Mechanical / Fuel Gas Permit for combo CP-2021-004372. FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2021
HVAC INSTALLATION INCLUDES 3 INDOOR AIR HANDLING UNITS, 4 NEW INLINE PUMPS, NEW HEAT EXCHANGER AND HYDRONIC BASEBOARD RADITIONS PIECES. APPROX 40 TOTAL GRILLES, REGISTERS AND DIFFUSERS 3 AHU'S TOTAL TO APPROX 49 TONS. * NO STRUCTURAL WORK PERMITTED *City of Philadelphia · 2018
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you Hightec HVAC, Inc.?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to Hightec HVAC, Inc.'s website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
ALTERATIONS TO EXISTING HVAC SYSTEM FOR INSTALLATION OF SUPPLY DIFFUSERS, SUPPLY REGISTER & RETURN AIR GRILLS, RUN NEW DUCTWORK OFF EXISTING DUCTWORK, ADD DUCTWORK HOT WATER COIL AND PUMP, INSTALL A ZONE CONTROL DAMPER SYSTEM AND INSTALL NEW BASEBOARD RADITION IN THE BASEMENT OF THE RECTORY AS PER APPROVED PLANS.City of Philadelphia · 2017
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK THROUGHOUTH BUILDING 1, 2, 3. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2017
INSTALL NEW CHILLED AND HOT WATER HEATING AND COOLING SYSTEM IN EXISTING FRATERNITY BUILDING AS PER APPROVED PLANS.City of Philadelphia · 2014
INSTALLATION OF HVAC UNITS AND RELATED DUCTWORK AS PER PLANS.City of Philadelphia · 2013
MECHANIC ALTERATIONS TO AN EXISTING HVAC UNIT TO INCLUDE THE INSTALLATION OF 39 REGISTERS AND DIFFUSERS & A ROOFTOP HEAT PUMP UNIT (29 SQ. FT.)City of Philadelphia · 2013
RELOCATE (2) DIFFUSERS IN SPACE #655City of Philadelphia · 2012
Permitted projects on public record. Addresses are omitted for privacy.