What the public permit record shows, not self-reported reviews.
Is HENRY M CRUZ a real contractor?
HENRY M CRUZ appears in public building-permit records with 36 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is HENRY M CRUZ's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to HENRY M CRUZ by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is HENRY M CRUZ licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. HENRY M CRUZ has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is HENRY M CRUZ's work?
The most recent permit on record for HENRY M CRUZ is dated 2026-04-22, with 36 permits on file in total.
For the addition of a roof deck above the second floor rear. Roof deck to be accessed from the third floor (no pilot house). Size and location per plan.City of Philadelphia · 2026
FOR MODIFICATION OF THE ROOF ASSEMBLY AND INSTALLATION OF A ROOF ACCESS HATCH TO AN EXISTING ATTACHED FOUR-STORY SINGLE-FAMILY STRUCTURE AS PER APPROVED PLAN.City of Philadelphia · 2026
FOR THE ERECTION OF REAR SECOND FLOOR AND THIRD FLOOR ACCESSORY ROOF DECK (THIRD FLOOR ROOF DECK ACCESS FROM REAR SECOND FLOOR) ALL AS PART OF AN EXISTING SINGLE FAMILY ATTACHED STRUCTURE. DETAILS AS SHOWN IN THE APPLICATION / PLAN.City of Philadelphia · 2025
For the addition of a roof deck above the rear of an existing attached structure. Size and location per plans.City of Philadelphia · 2025
FOR THE ERECTION OF A DECK TO AN EXISTING SINGLE-FAMILY STRUCTURE AS PER APPROVED PLAN.City of Philadelphia · 2025
For the addition of roof decks above the second and third floor roof levels with an exterior spiral staircase. Size and location per plans.City of Philadelphia · 2025
FOR THE CONSTRUCTION OF A ROOF DECK AS PER APPLICATION/PLANS AND IN ACCORDANCE WITH THE 2018 IRC. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. IF FIELD CONDITIONS VARY, CONTACT ENGINEER PRIOR TO START OF WORK.City of Philadelphia · 2024
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you HENRY M CRUZ?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
For the erection of a roof deck addition over second story rear and a roof deck addition over third story, accessed by exterior stairs, of an existing attached structure. Size and location per plans
Amend Permit 1-24-2024 to update attachment details per plan.City of Philadelphia · 2023
FOR THE ADDITION OF A ROOF DECK TO AN EXISTING BUILDING. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING.City of Philadelphia · 2023
FOR A REAR ADDITION TO AN EXISTING STRUCTURE. FOR A DECK ADDITION ACCESSED THROUGH THE THIRD FLOOR LEVEL. SIZE AND LOCATION AS SHOWN IN PLAN.City of Philadelphia · 2023
FOR THE ERECTION OF A ROOF DECK, ACCESSED FROM THE THIRD FLOOR OF AN EXISTING ATTACHED STRUCTURE. SIZE AND LOCATION AS SHOWN ON THE APPLICATION/PLANS.City of Philadelphia · 2023
FOR THE ERECTION OF ROOF DECK ABOVE THE EXISTING REAR SECOND FLOOR ROOF ACCESS FROM REAR THIRD FLOOR AS PART OF AN EXISTING DETACHED STRUCTURE. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLAN.City of Philadelphia · 2023
Permitted projects on public record. Addresses are omitted for privacy.