What the public permit record shows, not self-reported reviews.
Is HENKELS & MC COY INC a real contractor?
HENKELS & MC COY INC appears in public building-permit records with 32 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is HENKELS & MC COY INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to HENKELS & MC COY INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is HENKELS & MC COY INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. HENKELS & MC COY INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is HENKELS & MC COY INC's work?
The most recent permit on record for HENKELS & MC COY INC is dated 2026-03-18, with 32 permits on file in total.
Installation of a new service and transformer
replacing the MDP panelsCity of Philadelphia · 2026
Electrical Permit for combo CP-2025-004533City of Philadelphia · 2026
Mechanical / Fuel Gas Permit for combo CP-2025-004533City of Philadelphia · 2026
FOR LEVEL II ALTERATIONS TO A MULTI-PURPOSE ROOM SPACE M-106 IN AN EXISTING STRUCTURE. ALTERATIONS FOR PARTIAL DEMOLITION
AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT TO INCLUDE
THE INSTALLATION OF REGISTERS, DIFFUSERS, WITH ASSOCIATED DUCTWORK TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS OFFICE - BUSINESS AND PROFESSIONAL AND RESEARCH AND DEVELOPMENT. ALL WORK TO BE DONE PER APPROVED PLANS.City of Philadelphia · 2025
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO CONFERENCE ROOM ON THE FIRST FLOOR OF AN EXISTING OFFICE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW*
**SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**City of Philadelphia · 2025
INSTALL 15KV SERVICE & DUCT BANKS TO (2) 750 KVA TRANSFORMERS & (1) 500 KVA TRANSFORMER. INSTALL SECONDARY SERVICE TO (1) 1,400 AMP MCB, (1) 1,200 AMP MCB, (1) 1,000 AMP MCB, (1) 800 AMP MCB PANEL & (1) 400 AMP MCB PANEL. INSTALL A SERVICE BONDING & GROUNDING. ALL WORK IN ACORDANCE WITH THE 2017 NEC.City of Philadelphia · 2024
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you HENKELS & MC COY INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to HENKELS & MC COY INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
FOR THE ERECTION OF A 2 STORY BUILDING, PANELIZED PRECAST CONCRETE WALLS SUPPORTED BY STEEL SUPERSTRUCTURE, BEARING ON CAST-IN-PLACE SLAB ON GRADE WITH SUPPORTING FOUNDATION AND FOOTINGS. MEMBRANE ROOF WILL BE OVER 5/8" PROTECTION BOARD ON TOP OF TAPERED RIGID INSULATION, SUPPORTED BY TYPICAL STRUCTURAL DECKING AND JOISTS WITH PARAPETS, SCUPPERS AND
DOWNLEADERS TO SPLASHBLOCKS AS PER PLANS.City of Philadelphia · 2021
FOR THE CONSTRUCTION OF A ONE-STORY PUMP HOUSE ENCLOSURE, AS PER APPROVED PLANS. *SEPARATE PERMIT REQUIRED FOR ANY ELECTRICAL WORK*City of Philadelphia · 2021
Removed damaged PECO service meter and 400 amp disconnect switch.
Install a new PECO meter can socket along with a new 400 amp service disconnect and add 3 additional 200 amp service disconnects to separate the existing loads. As shown on drawing attached as per 2017 NEC.City of Philadelphia · 2021
15KV PRIMARY SERVICE, SECONDARY SERVICE ALL DISTRIBUTION EQUIPMENT, SITE LIGHTING, TEMP POWER AND LIGHTING, LIGHTING ON ALL FLOORS, LIGHTING CONTROLS, BRANCH POWER, GROUNDING. TELE/DATA SLEEVES AND CABLE, FIRE ALARM AND POWER TO JOB TRAILERS. ALL W FURNISH AND INSTALL A COMPLETE FORE ALARM SYSTEM THROUGHOUT.AS PER THE 2007 NFPA-72, 2008 NEC.City of Philadelphia · 2020
FOR A ERECTION OF A NEW STRUCTURE TO HOUSE 15KV ELECTRICAL SWITCHGEAR EQUIPMENT PLANNED FOR THE PECO WESTMORELAND SUBSTATION. THE ONE STORY STRUCTURE THAT WOULD OCCUPY 6336 SF. IN ADDITION TO THE ENCLOSURE, THE EXISTING DRIVEWAY ACCESS TO THE SITE WOULD BE WIDENED AND THERE WILL BE RELATED ELECTRICAL IMPROVEMENTS TO REPLACE THE FUNCTION OF EXISTING EQUIPMENT DAMAGED IN 2017 FIRE. NO LANDSCAPING OR SIGNAGECity of Philadelphia · 2019
INSTALL 200 AMP SINGLE PHASE TEMP SERVICE FOR NEW CONSTRUCTION AS PER 2017 NECCity of Philadelphia · 2019
Permitted projects on public record. Addresses are omitted for privacy.