Install a backup generator on the roof, including mounting, supports, and all associated electrical connections. Provide feeders, overcurrent protection, disconnecting means, and grounding/bonding as required.
Coordinate connection to the building electrical system, including transfer equipment as applicable. All work shall be performed in accordance with the 2017 NEC and per approved plans.City of Philadelphia · 2026
1) As per drawings prepared by MKN associates and dated 7/3/2025.
2) Demo as required.
3) Install spec’d lighting package.
4) Replace (12) 4x2 LED flat panels .
5) Furnish and install outlets as show on plans
6) Provide power for new exterior signs as noted on drawings
7) Lighting branch circuits per plan using MC cable.
8) Disconnect/reconnect menu board at drive thru .PER APPROVED DRAWINGS-2017 NEC.City of Philadelphia · 2025
Replacement of existing exterior lighting fixtures
NO NEW WIRINGCity of Philadelphia · 2025
Demo old 800A service and install new 800A New Electrical Service . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
** NO SERVICE WORK TO FUTURE "BUILDING D " IS APPROVED ON THIS PERMIT**City of Philadelphia · 2024
INSTALL A 300 KW 408V / 3 PHASE GENERATOR, TRANSFER SWITCHES, TRANSFORMERS, PANELS & FEEDERS TO UPGRADE POWER FOR THE ELEVATOR EQUIPMENT. INSTALL LIGHTS, SWITCHES AND RECEPTACLES IN THE ELEVATOR MACHINE ROOMS, PITS AND THE ELECTRIC ROOMS. INSTALL NEW FIRE ALARM DEVICES ON THE EXISTING BUILDING FIRE ALARM PANEL. ALL WORK IN ACCORDANCE WITH THE 2017 NEC.City of Philadelphia · 2023
Selective Electrical demo as needed will disconnect and make safe for others to be removed Provide and install Lighting package Provide and install lighting control package , Provide electrical service to building and panels in each apartment
Complete Fire alarm system as show on plans .
Complete AOR system to meet code All branch and feeder wiring done per NEC requirements
All wiring devices standard grade white
Power wire HVAC equipment as required.
Wiring in units will be Romex
Wiring in common areas to be MC cable
Temporary Power for and building power and lighting including material handler
Primary and secondary electrical services per plans (will require PECO coordination)
Low voltage cabling in units only. To smart box in each unit as shown on the data plans
Fire Stop and putty pads for electrical work
Ring and string for Data any voice or data outside of apartments
Tie n all fire alarm to fire command center,Install wiring for pool w/ all equipotential bonding. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Install lighting, receptacles, provide new ,panel ,fire alarm. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE.City of Philadelphia · 2023
Install a 2,000 amp 277/480v/ 3 phase service, 2,000 amp 277 / 480v / 3 phase main switchboard, transformers, panels, feeders, & metering to 146 dwelling units, (1) retail spaces, amenity spaces, & parking garage. Provide lighting normal & emergency, switches, sensors, & receptacles though out the common areas, amenity spaces, & retail spaces. Provide power for the mechanical, hvac and elevator equipment. Install a two-way communication system.
All work in accordance with the 2017 nec .
** NO FIRE ALARM WORK ON THIS PERMIT.
** NO FIRE ALARM WORK ON THIS PERMIT.**
** NO FIRE ALARM WORK.
** THIS BUILDING REQUIRES A FIRE ALARM SYSTEM.City of Philadelphia · 2023
Rewiring of BURGER KING, New SERVICE CONDUCTORS&CT CABINET,. Em. lighting ,receptacles ,equipment hook-ups,show-window receptacles. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
**NO FIRE ALARM ON THIS PERMIT**City of Philadelphia · 2023
1) Bid is based on drawings dated 8.29.2023 supplied by TK studio
2) All sign seal electrical drawling’s
3) Furnish and Install all required power for outlets based on E110
4) Furnish wiring and switching
5) Install Lighting supplied by others based on E150
6) Furnish and Install wiring for Refrigeration equipment based on E110
7) Furnish and Install 120/208 electrical panel “RPB”
8) Furnish and Install light switching based on E120
9) Provide necessary inspections for the projects
10) “Ring and string” for low data/communications wiring by others as per drawing E120
11) Demo existing as required per drawings
As per 2017 necCity of Philadelphia · 2023
1) Furnish and install (1) 20amp GE THQB breaker
2) Furnish and install (1) 20amp 120v circuit (12/2 MC wire) from electrical panel up to 2nd floor exposed on beams & ceiling
3) Furnish and install (1) junction box with 20amp circuit capped inside stairwell, 3’ from new wall sign
a. All penetrations / final terminations made by SIGN VENDOR
b. GENERAL PERMIT GP-2022-002340
4) Replace (2) exit signs in stairwell with new
5) Replace (4) lamps in stairwell with new LED 4’ tubes
As per 2017 necCity of Philadelphia · 2022
IN CUSTOMER WAITING AREA DISCONNECT ELECTRIC DEVICES FOR LED BACKWALL DISPLAYS AND REMOVE CIRCUITS. PROVIDE/INSTALL NEW ELECTRICAL CIRCUITS AND DEVICES FOR NEW DISPLAYS. ALSO PROVIDE CONDUIT DROPS DOWN WALL FOR LOW VOLTAGE VENDOR AS PER 2017 NECCity of Philadelphia · 2022
Permitted projects on public record. Addresses are omitted for privacy.