What the public permit record shows, not self-reported reviews.
Is HAINES & KIBBLEHOUSE INC a real contractor?
HAINES & KIBBLEHOUSE INC appears in public building-permit records with 142 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is HAINES & KIBBLEHOUSE INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to HAINES & KIBBLEHOUSE INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is HAINES & KIBBLEHOUSE INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. HAINES & KIBBLEHOUSE INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is HAINES & KIBBLEHOUSE INC's work?
The most recent permit on record for HAINES & KIBBLEHOUSE INC is dated 2026-02-25, with 142 permits on file in total.
FOR THE INSTALLATION OF UNDERGROUND UTILITIES AND RELATED APPURTENANCES AS NOTED ON THE APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. *See Flood Protection Form- Project Summary (FP-PS)" Dated 6-502025 for Floodplain Requirements.City of Philadelphia · 2026
FOR EXCAVATION OF ELEVATOR PIT USING PERSCRIPTIVE SHORING MEASURES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2025
FOR COMPLETE DEMOLITION OF EXISTING STRUCTURES. EXISTING STRUCTURES TO BE DEMOLISHED BY MECHANICAL EQUIPMENT PER APPROVED PLANS. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES.
* A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED.
* 21 DAY POSTING AND NOTICE REQUIRED PER A-303.2
* NEWLY EXPOSED WALLS TO BE TREATEDCity of Philadelphia · 2025
Complete demolition to create vacant lotCity of Philadelphia · 2025
FOR THE COMPLETE DEMOLITION OF AN EXISTING DETACHED 3-STORY STRUCTURE BY MECHANICAL DEMOLITION. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. * 21 DAY POSTING AND NOTICE REQUIRED PER A-303.2
**** DUST CONTROL REQUIRED PER DEPARTMENT OF PUBLIC HEALTH. *******
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you HAINES & KIBBLEHOUSE INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to HAINES & KIBBLEHOUSE INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2025
FOR THE COMPLETE DEMOLITION OF THE EXISTING ONE (1) STORY MASONRY STRUCTURE. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY HAND AND MECHANICAL METHODS. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO START OF WORK. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR RIGHT-OF-WAY ENCROACHMENT OR CLOSURE.City of Philadelphia · 2025
vacant lotCity of Philadelphia · 2025
SITE WORK ASSOCIATED WITH INSTALLATION OF WATER AND FIRE MAIN CONNECTIONS FOR A NEW CONSTRUCTION EDUCATIONAL FACILITY AS PER APPROVED PLANS. SEE CP-2024-004723 FOR NEW CONSTRUCTION APPROVAL. *2018 IBC REVIEW*
**SEPARATE PERMITS TO BE ISSUED FOR PLUMBING AND FIRE SUPPRESSION WORK**City of Philadelphia · 2024
FOR EXCAVATION WORK AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2024
Sub Demolition Permit for CF-2022-094607. For the complete demolition of a multi-family apartment building as part of The City of Philadelphia Demolition Program. Addl' specs: Replace entire front sidewalk. No stucco. Install 6' of topsoil with erosion control mat and seed. Install 4' high corral fence around perimeter of property.City of Philadelphia · 2024
FOR THE COMPLETE DEMOLITION OF THE EXISTING THREE (3) STORY MASONRY STRUCTURE AND ONE (1) STORY MASONRY STRUCTURE. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY MECHANICAL METHOD. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO START OF WORK. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR RIGHT-OF-WAY ENCROACHMENT OR CLOSURE
*ASBESTOS ABATEMENT REQUIRED PRIOR TO START OF WORK.*City of Philadelphia · 2024
For the complete demolition of an existing detached structure (Thomas Holme Elementary School).City of Philadelphia · 2024
Permitted projects on public record. Addresses are omitted for privacy.