What the public permit record shows, not self-reported reviews.
Is Habitat for Humanity Philadelphia a real contractor?
Habitat for Humanity Philadelphia appears in public building-permit records with 60 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is Habitat for Humanity Philadelphia's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to Habitat for Humanity Philadelphia by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is Habitat for Humanity Philadelphia licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. Habitat for Humanity Philadelphia has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is Habitat for Humanity Philadelphia's work?
The most recent permit on record for Habitat for Humanity Philadelphia is dated 2026-03-01, with 60 permits on file in total.
FOR LEVEL III ALTERATIONS AND ADDITION OF REAR DECKS WITH NO CHANGE IN OCCUPANCY. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13R. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION.City of Philadelphia · 2026
For the reconstruction of the front porch roof. Size and location per plans.City of Philadelphia · 2025
FOR ALTERATIONS TO AN EXISTING ATTACHED SINGLE-FAMILY DWELLING AS PER APPROVED PLAN.
*SEPARATE PERMITS REQUIRED FOR ELECTRICAL, PLUMBING, AND MECHANICAL WORK*
**UNDERPINNING IS NOT PART OF THIS PERMIT**City of Philadelphia · 2025
FOR THE CONSTRUCTION OF AN ADDITION TO REPLACE A PREVIOUSLY DEMOLISHED PORTION OF AN EXISTING ATTACHED SINGLE-FAMILY DWELLING AS PER APPROVED PLANS AND IN ACCORDANCE WITH THE 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, AND PLUMBING WORK. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.City of Philadelphia · 2024
FOR THE REPLACEMENT OF A FRONT PORCH ROOF IN KIND AS PER APPROVED PLANS. *SEPARATE PERMITS REQUIRED FOR ELECTRICAL, PLUMBING, AND MECHANICAL WORK*City of Philadelphia · 2024
FOR THE CONSTRUCTION OF AN ATTACHED TWO STORY STRUCTURE. FOR A SINGLE-FAMILY HOUSEHOLD LIVING. AS PER PLANS BUILDING TO BE SPRINKLERED IN ACCORDANCE WITH NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 7.5 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.** BLOWER DOOR TESTING SHALL BE PERFORMED IN ACCORDANCE WITH ASTM E 779 OR ASTM E 1827 BY AN APPROVED THIRD PARTY AGENCY
AMENDMENT ON 5/31/24 TO CHANGE SPECIAL INSPECTION AGENCY.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you Habitat for Humanity Philadelphia?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to Habitat for Humanity Philadelphia's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2024
FOR THE ERECTION OF AN ATTACHED, TWO-STORY STRUCTURE OF TYPE VB CONSTRUCTION AS PER PLANS. BUILDING TO BE PROTECTED WITH AN AUTOMATIC SPRINKLER SYSTEM DESIGNED PER NFPA 13D STANDARD.
AMENDMENT (6/7/2024) TO CHANGE THE SPECIAL INSPECTION AGENCY AS PER REVISED FORMS.City of Philadelphia · 2024
For the erection of a semi-detached structure for use as single-family household living. Building to be fully sprinklered. Separarte permits required for MEP and FP work.
Amendment to change the Special Inspector for the building from Fidelis Engineering to Geostructures Inc.City of Philadelphia · 2024
FOR NEW CONSTRUCTION OF AN ATTACHED BUILDING. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13D. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION.
*AMEND 5/29/24 - CHANGE SPECIAL INSPECTION AGENCY*City of Philadelphia · 2024
FRONT PROCH REPAIR PER PLANSCity of Philadelphia · 2023
THE RENOVATION OF AN EXISTING 2-STORY SINGLE-FAMILY ROWHOME. NO CHANGES TO EXISTING BUILDING FOOTPRINT OR HEIGHT. DETAILS AS SHOWN ON PLAN.
AMENDMENT #1:
Amend to remove and replace the existing concrete slab on grade at the basement with no excavation for utility and storage only to replace the stairs to the basement, to remove and replace the existing front porch slab and roof, and to change the interior layout as per the amended plan.City of Philadelphia · 2023
FOR SITEWORK PER APPROVED PLANS.
*3/19/24 - AMEND REAR YARD DRAINS*City of Philadelphia · 2022
Permitted projects on public record. Addresses are omitted for privacy.