What the public permit record shows, not self-reported reviews.
Is H T SWEENEY & SON INC a real contractor?
H T SWEENEY & SON INC appears in public building-permit records with 14 permits filed through 2015 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is H T SWEENEY & SON INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to H T SWEENEY & SON INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is H T SWEENEY & SON INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. H T SWEENEY & SON INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is H T SWEENEY & SON INC's work?
The most recent permit on record for H T SWEENEY & SON INC is dated 2015-08-11, with 14 permits on file in total.
FOR THE ERECTION OF A ONE STORY BUILDING FOR FLARE MONITORING PURPOSES ACCESSORY TO INTENSIVE INDUSTRIAL USE ON THE LOT AND FOR MODIFICATION TO EXISTING FLARE STACK STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS, CONSTRUCTION TO INCLUDE CONCRETE FOUNDATIONS, BOLLARDS AND STRUCTURAL STEEL REINFORCEMENT. IF FIELD CONDITIONS VARY CONTACT STRUCTURAL ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2015
FOR THE ERECTION OF A ONE STORY BUILDING FOR FLARE MONITORING PURPOSES ACCESSORY TO INTENSIVE INDUSTRIAL USE ON THE LOT AND FOR MODIFICATION TO EXISTING FLARE STACK STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS, CONSTRUCTION TO INCLUDE CONCRETE FOUNDATIONS, BOLLARDS AND STRUCTURAL STEEL REINFORCEMENT. IF FIELD CONDITIONS VARY CONTACT STRUCTURAL ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2015
FOR THE AMENDMENT OF AP#591099 TO DOCUMENT THE CHANGE IN THE TYPE OF FOUNDATION BEING USED FROM BLOCK AND PIERS DESIGN TO AN AT GRADE SLAB FOUNDATION DESIGN. ORIGINAL APPLICATION APPROVED FOR THE ERECTION OF A ONE STORY BUILDING (BUILDING A-PES BUILDING 6642) FOR THE USE OF A BUSINESS AND PROFESSIONAL OFFICE ACCESSORY TO EXISTING INTENSIVE INDUSTRIAL USE ON THE LOT. ALL WORK TO BE DONE PER APPROVED PLANS, IF FIELD CONDITIONS VARY CONTACT STRUCTURAL ENGINEER PRIOR TO THE START OF ANY WORK. PLEASE REFERENCE DOH APPROVAL FOR WASTE WATER TANK. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, AND PLUMBING WORK.PLEASE REFER TO AP#603587 FOR AMENDED PLANS AND DOCUMENTATION.City of Philadelphia · 2015
FOR THE AMENDMENT OF AP#595788 TO DOCUMENT THE CHANGE IN THE TYPE OF FOUNDATION BEING USED FROM BLOCK AND PIERS DESIGN TO AN AT GRADE SLAB FOUNDATION DESIGN. ORIGINAL APPLICATION APPROVED FOR THE ERECTION OF A ONE STORY BUILDING (BUILDING B-PES BUILDING 6641) FOR THE USE OF A LOCKER ROOM AND TOILET FACILITIES WITH A COMMON WORK AREA ACCESSORY TO A BUSINESS USE WITH AN EXISTING INTENSIVE INDUSTRIAL USE ON THE LOT. ALL WORK TO BE DONE PER APPROVED PLANS, IF FIELD CONDITIONS VARY CONTACT STRUCTURAL ENGINEER PRIOR TO THE START OF ANY WORK. PLEASE REFERENCED DOH APPROVAL FOR WASTE WATER TANK. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, AND PLUMBING WORK. PLEASE REFERENCE AP#591099 FOR ALL APPROVED DOCUMENTATION AND PLANS.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you H T SWEENEY & SON INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to H T SWEENEY & SON INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2015
FOR THE ERECTION OF A ONE STORY BUILDING (BUILDING A-PES BUILDING 6642) FOR THE USE OF A BUSINESS AND PROFESSIONAL OFFICE ACCESSORY TO EXISTING INTENSIVE INDUSTRIAL USE ON THE LOT. ALL WORK TO BE DONE PER APPROVED PLANS, IF FIELD CONDITIONS VARY CONTACT STRUCTURAL ENGINEER PRIOR TO THE START OF ANY WORK. PLEASE REFERENCE DOH APPROVAL FOR WASTE WATER TANK. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, AND PLUMBING WORK.City of Philadelphia · 2015
FOR THE ERECTION OF A ONE STORY BUILDING (BUILDING B-PES BUILDING 6641) FOR THE USE OF A LOCKER ROOM AND TOILET FACILITIES WITH A COMMON WORK AREA ACCESSORY TO A BUSINESS USE WITH AN EXISTING INTENSIVE INDUSTRIAL USE ON THE LOT. ALL WORK TO BE DONE PER APPROVED PLANS, IF FIELD CONDITIONS VARY CONTACT STRUCTURAL ENGINEER PRIOR TO THE START OF ANY WORK. PLEASE REFERENCED DOH APPROVAL FOR WASTE WATER TANK. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, AND PLUMBING WORK. PLEASE REFERENCE AP#591099 FOR ALL APPROVED DOCUMENTATION AND PLANS.City of Philadelphia · 2015
WORK PERTAINS TO SITEWORK ONLY, TO PROVIDE TRACK CROSSING AND ROADWAY TO NEW BUTANE RAIL TERMINAL TO ACCESS EXISTING EQUIPMENT. PROPOSED WORK ACCESSORY EXISTING INTENSIVE INDUSTRIAL USE ON LOT. ALL WORK TO BE DONE PER APPROVED PLANS AND SEALED DETAILS. IF FIELD CONDITIONS VARY CONTACT STRUCTURAL ENGINEER PRIOR TO THE START OF ANY WORK.SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2014
FOR THE ERECTION OF A CONCRETE FOUNDATION AND THE INSTALLATION OF A PREFABRICATED STRUCTURE AS SHOWN IN APPROVED PLANS.City of Philadelphia · 2014
REMOVE THE EXISTING BELOW GRADE FOUNDATIONS AND BACKFILL AS PER PLANS.City of Philadelphia · 2014
THE CONSTRUCTION OF BUILDING AND EQUIPMENT FOUNDATIONS, AND THE INSTALLATION OF A PDC EQUIPMENT BUILDING AND MISCELLANEOUS PIPE BRIDGE CRASH WALLS.City of Philadelphia · 2014
FOR THE CONSTRUCTION OF SUBSURFACE FOUNDATIONS AND SUPPORT PIERS FOR TWO(2) 805 FT LONG AND 5 FT WIDE RAILCAR UNLOADING PLATFORMS AND FOR THE ERECTION OF PIPE RACK FOUNDATIONS AND A TRANSFORMER PAD. THE UNLOADING PLATFORM AND CATWALK SYSTEMS WILL LOCATED APPROXIMATLEY 30 FEET ABOVE GRADE. ALL WORK ACCESSORY TO AN EXISTI NG INTENSIVE INDUSTRIAL USE.ALL CONNECTION DETAILS TO BE DONE PER APPROVED PLANS, IF FIELD CONDITION VARY CONTACT STRUCTURAL ENGINEER PRIOR TO THE START OF ANY WORK.City of Philadelphia · 2014
FOR THE INSTALLATION OF NEW PIPELINE SUPPORTS WITH THE INSTALLATION OF SUPPORT PIERS AND PIPE RACKS WITH BELOW GRADE FOUNDATIONS AND FOR THE UPGRADE OF EXISTING REFINERY PIPELINE SUPPORTS AND FOR THE ERECTION OF A CONCRETE EQUIPMENT PAD. SIZE AND LOCATION AS SHOWN IN APPLICATION/PLANS. PIPE LINE ACCESSORY TO AN EXISTING INTENSIVE INDUSTRIAL USE. ALL CONNECTION DETAILS TO BE DONE PER APPROVED PLANS, IF FIELD CONDITION VARY CONTACT STRUCTURAL ENGINEER PRIOR TO THE START OF ANY WORK.City of Philadelphia · 2014
Permitted projects on public record. Addresses are omitted for privacy.