What the public permit record shows, not self-reported reviews.
Is GOLONDRINA LLC a real contractor?
GOLONDRINA LLC appears in public building-permit records with 9 permits filed through 2020 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is GOLONDRINA LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to GOLONDRINA LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is GOLONDRINA LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. GOLONDRINA LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is GOLONDRINA LLC's work?
The most recent permit on record for GOLONDRINA LLC is dated 2020-06-03, with 9 permits on file in total.
FOR THE INSTALLATION OF HVAC APPLIANCE, REGISTERS, DIFFUSERS AND ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTUER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.City of Philadelphia · 2020
EZ INTERIOR DEMOLITION - FOR THE INTERIOR DEMOLITION ON NON-BEARING PARTITION WALL AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS. . STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/ROOF FRAMING OR FOUNDATIONS. *CONTRACTOR HAS NO EMPLOYEES PER NOTARIZED LETTER*City of Philadelphia · 2019
FOR THE ERECTION OF AN EXTERIOR RAMP AND LANDING AS PER APPROVED PLAN.City of Philadelphia · 2019
FOR THE ERECTION OF AN EXTERIOR RAMP AND LANDING AS PER APPROVED PLAN.City of Philadelphia · 2019
FOR LEVEL II ALTERATIONS THROUGHOUT AN EXISTING TWO STORY BUILDING FOR USE AS A MERCANTILE ON THE FIRST FLOOR LEVEL WITH A BUSINESS OCCUPANCY ON THE SECOND FLOOR LEVEL. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES AND FURNISHINGS THROUGHOUT. WORK TO ALSO INCLUDE REFRAMING OF THE EXISTING STAIRS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2017
INTERIOR DEMO ONLY-NO FIRE RATED OR LOAD BEARING PARTITIONS OR CEILINGS TO BE REMOVED. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you GOLONDRINA LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2017
REPAIRS AND RENOVATIONS TO FIRST AND SECOND FLOOR OF EXISTING TWO STORY BUILDING. REPLACE OVERHEAD GARAGE DOOR AND ADD A PEDESTRIAN DOOR AT FRONT OF BUILDING. REPAIR/BUILDING EXISTING STAIRS TO SECOND FLOOR. MOVE SECOND FLOOR RESTROOM AND KITCHENETTE. NO CHANGE TO BUILDING FOOTPRINT OR HEIGHT.**SEPARATE PERMIT IS REQUIRED FOR M.E.P.**City of Philadelphia · 2016
TO AMEND PERMIT #641462 TO REVISE STRUCTURAL DRAWINGS FOR THE ACCESSIBLE LIFT TO BE INSTALLED AND FOR THE INSTALLATION OF AN EXTERIRO AWNING AT THE BUILDING ENTRANCE AS SHOWN IN APPROVED PLANS.City of Philadelphia · 2016
FOR THE CREATE OF A NEW BUILDING ENTRANCE & VESTIBULE AT GRADE, THE INSTALLATION OF AN ACCESSIBLE LIFT SYSTEM AND INTERIOR NON-BEARING PARTITIONS TO PROVIDE AN ACCESSIBLE ROUTE & AREA IN AN EXISTING RELIGIOUS ASSEMBLY/THEATRE. MINOR STRUCTURAL MODIFICATIONS REQUIRED TO SUPPORT NEW LIFT SYSTEM.City of Philadelphia · 2015
Permitted projects on public record. Addresses are omitted for privacy.