What the public permit record shows, not self-reported reviews.
Is GEZIM KUPA a real contractor?
GEZIM KUPA appears in public building-permit records with 31 permits filed through 2025 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is GEZIM KUPA's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to GEZIM KUPA by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is GEZIM KUPA licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. GEZIM KUPA has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is GEZIM KUPA's work?
The most recent permit on record for GEZIM KUPA is dated 2025-02-10, with 31 permits on file in total.
FOR COMPLETE CHANGE OF OCCUPANCY TO R-2 AND INTERIOR ALTERATIONS TO BASEMENT AND 1ST FLOOR AS PER APPROVED PLANS. BUILDING TO BE SPRINKLERED PER NFPA 13. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.City of Philadelphia · 2025
For removal and replacement of the basement slab, demolition of a non-bearing partition on the first floor, and demolition of the abandoned chimney stack on the first and second floors.
NO INTERIOR ALTERATIONS OR FINISHES TO BE COMPLETED UNDER THIS PERMIT. SEPARATE PERMITS REQUIRED FOR INTERIOR ALTERATIONS AND ALL ASSOCIATED MEP WORK.City of Philadelphia · 2025
For the partial demolition and reconstruction of the rear of the structure. Reduction in size per approved zoning. No new foundation work.
For interior and exterior alterations to an existing attached single-family dwelling per plans. Separate permits are required for all associated Mechanical, Electrical, and Plumbing work. Basement to remain non-habitable, to be used for storage and utilities only.City of Philadelphia · 2024
NEW CONSTRUCTION OF AN ATTACHED STRUCTURE TO INCLUDE PILOT HOUSE AND ROOF DECK FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2024
For the partial demolition and reconstruction of the rear section of the existing structure. Size and location per plans.City of Philadelphia · 2024
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you GEZIM KUPA?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. (UNDERPINNNING IS NOT PART OF THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. PERGOLAS WILL BE ON DEFERED SUBMISSION.
City of Philadelphia · 2024
Erection of an attached structure with cellar, roof deck and pilot house to use as single-family household living, size and location as shown in the plan.City of Philadelphia · 2024
FOR ERECTION OF A NEW THREE (3) STORY ATTACHED STRUCTURE WITH ROOF DECK AND ROOF ACCESS STRUCTURE HEIGHT NTE 38 FEET; SIZE AND LOCATION AS SHOWN ON THE APPLICATION/PLAN.City of Philadelphia · 2024
FOR THE ERECTION OF AN ATTACHED STRUCTURE WITH ROOF DECK ACCESSED BY A PILOTHOUSE. FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2022
Alteration: Interior building; existing single-family dwelling; basement powder room.City of Philadelphia · 2022
FOR THE ERECTION OF AN ATTACHED THREE STORY STRUCTURE OF TYPE VB CONSTRUCTION WITH A CELLAR AND A ROOF DECK WITH A ROOF ACCESS STRUCTURE. SIZE AND LOCATION AS SHOWN ON PLANS.
AMENDMENT (4/20/2022) FOR CHANGES TO FRAMING MEMBERS , FOUNDATION AND FOR RELOCATION OF FLOOR HIEHTS AS PER REEVISED PLANS. NO CHANGE TO GROSS FLOOR AREA OR TOTAL BUILDING HEIGHT.
AMENDMENT (12/1/2022) TO ADD A ROOF DECK AND A ROOF ACCESSSTRUCTURE AS PER REVISED PLANS.City of Philadelphia · 2021
FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE WITH ROOF DECK AND ROOF DECK ACCESS STRUCTURE; FOR USE AS SINGLE FAMILY DWELLING. SEPARATE PERMIT REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
For the installation of mechanical work as per EZ Mechanical appliance standard.
[AMENDMENT (4/20/2022) FOR CHANGES TO FRAMING MEMBERS , FOUNDATION AND FOR RELOCATION OF FLOOR HEIGHTS AS PER REEVISED PLANS. NO CHANGE TO GROSS FLOOR AREA OR TOTAL BUILDING HEIGHT.]
[AMENDMENT APPROVED 9/26/2022 FOR A RECONFIGURATION OF THE 3RD FLOOR AND ROOF LEVELS TO REPLACE AN EXTERIOR STAIRWAY SERVING THE ROOF DECK WITH AN ENCLOSED ROOF DECK ACCESS STRUCTURE AS PER APPROVED AMENDED PLANS. SEE ZP-2022-009854 FOR AMENDED ZONING APPROVAL.]City of Philadelphia · 2021
Permitted projects on public record. Addresses are omitted for privacy.