What the public permit record shows, not self-reported reviews.
Is G&J GROUP LLC a real contractor?
G&J GROUP LLC appears in public building-permit records with 72 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is G&J GROUP LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to G&J GROUP LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is G&J GROUP LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. G&J GROUP LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is G&J GROUP LLC's work?
The most recent permit on record for G&J GROUP LLC is dated 2026-04-27, with 72 permits on file in total.
FOR THE ERECTION OF AN ATTACHED STRUCTURE WITH A ROOF DECK AND PILOT HOUSE. STRUCTURE FOR USE AS TWO (2) DWELLING UNITS. SPRINKLERED THROUGHOUT PER NFPA 13D. SEPARATE PERMITS REQUIRED FOR PLUMBING, MECHANICAL, ELECTRICAL AND FIRE SUPPRESSION. A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC.City of Philadelphia · 2026
FOR THE ERECTION OF AN ATTACHED STRUCTURE. SIZE & LOCATION AS SHOWN ON THE APPLICATION/PLANS.City of Philadelphia · 2026
FOR THE ERECTION OF AN ATTACHED STRUCTURE WITH A ROOF DECK AND PILOT HOUSE. STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SPRINKLERED THROUGH PER NFPA 13R. SEPARATE PERMITS REQUIRED FOR PLUMBING, MECHANICAL, ELECTRICAL AND FIRE SUPPRESSION. A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC.
**UNDERPINNING TO BE MONITORED BY A PA LICENSED PE AT ALL TIMES**
**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**City of Philadelphia · 2025
FOR THE ERECTION OF AN ATTACHED NEW STRUCTURE WITH A CELLAR AND AN ACCESSORY ROOF DECK (FOR RESIDENTIAL USE ONLY) WITH ROOF ACCESS STRUCTURE. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLAN.City of Philadelphia · 2025
FOR NEW CONSTRUCTION OF AN ATTACHED BUILDING WITH CELLAR, ROOF DECK AND ROOF-DECK ACCESS STRUCTURE AS PER APPROVED PLANS FOR USE AS MULTI-FAMILY HOUSEHOLD LIVING (THREE DWELLING UNITS). BUILDING TO BE FULLY SPRINKLERED PER MIN. NFPA 13R. SEPARATE PERMITS REQUIRED FOR MEP AND FP WORKS.
*AMENDMENT (3-3-2026) ADDDING UNDERPINNING TO EXCAVATION PLANS AS PER THE APPROVED AMENDED CONSTRUCTION DOCUMENTS. **EXCAVATION PERMIT SP-2025-000735 IS REQUIRED**UNDERPINNING INCUDED IN THIS PERMIT VIA AMENDMENT **City of Philadelphia · 2025
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you G&J GROUP LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
For interior alterations to an existing attached single-family dwelling per plans. Separate permits are required for all associated Mechanical, Electrical, and Plumbing work. Basement to remain non-habitable, to be used for storage and utilities only.City of Philadelphia · 2025
FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH ROOF DECK AND ROOF DECK ACCESS STRUCTURE FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
[AMENDMENT 3/21/2025 FOR UNDERPINNING OF THE ADJACENT FOUNDATION AT THE REAR OF 2028 N LAWRENCE ST.]City of Philadelphia · 2024
FOR INSTALLATION OF AN EGRESS WINDOW WELL TO AN EXISTING ATTACHED THREE STORY STRUCTURE; SIZE AND LOCATION AS SHOWN ON THE APPLICATION/PLAN.City of Philadelphia · 2024
FOR NEW CONSTRUCTION OF A THREE (3) STORY WOOD-FRAME ATTACHED STRUCTURE ON REINFORCED CONCRETE FOOTINGS/FOUNDATIONS WITH EGRESS WELL, ROOF DECK AND ONE ROOF ACCESS STRUCTURE. FOR USE AS A SINGLE-FAMILY DWELLING THROUGHOUT. THE BUILDING SHALL BE FULLY SPRINKLERED, SEPARATE PERMITS REQUIRED FOR ALL MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION SYSTEMS. *PROTECTION OF RIGHT-OF-WAY / PEDESTRIANS / ADJACENT PROPERTIES REQUIRED DURING ALL CONSTRUCTION. *City of Philadelphia · 2024
FOR NEW CONSTRUCTION OF AN ATTACHED THREE-STORY BUILDING WITH CELLAR, ROOF DECK AND ROOF-DECK ACCESS STRUCTURE FOR USE AS TWO-FAMILY HOUSEHOLD LIVING. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13D. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION AND EXCAVATION.
*10/1/2023; AMEND SPECIAL INSPECTIONS*City of Philadelphia · 2023
FOR NEW CONSTRUCTION OF A THREE-STORY ATTACHED BUILDING WITH CELLAR, REAR DECKS AT SECOND AND THIRD FLOORS, ROOF DECK AND ROOF-DECK ACCESS STRUCTURE PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13R. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION.City of Philadelphia · 2022
FOR THE ERECTION OF AN ATTACHED FOUR (4) STORY STRUCTURE FOR USE AS A TWO-FAMILY HOUSEHOLD LIVING. BUILDING TO BE SPRINKLERED IN ACCORDANCE WITH NFPA 13R. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.** BLOWER DOOR TESTING SHALL BE PERFORMED IN ACCORDANCE WITH ASTM E 779 OR ASTM E 1827 BY AN APPROVED THIRD PARTY AGENCY
*ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
HVAC INSTALLATION IN ACCORDANCE WITH EZ PERMIT STANDARD.
AMENDED AS OF 4.8.2022: FOR THE ADDITION OF UNDERPINNING WORK TO THE FOUNDATION WALL.
AMENDED AS OF 5.23.2022: TO CHANGE THE DPRC-SI and Special Inspector, ALL PER SI DOCUMENTS.City of Philadelphia · 2022
Permitted projects on public record. Addresses are omitted for privacy.