What the public permit record shows, not self-reported reviews.
Is Fosh Plumbing and Heating Inc. a real contractor?
Fosh Plumbing and Heating Inc. appears in public building-permit records with 42 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is Fosh Plumbing and Heating Inc.'s track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to Fosh Plumbing and Heating Inc. by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is Fosh Plumbing and Heating Inc. licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. Fosh Plumbing and Heating Inc. has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is Fosh Plumbing and Heating Inc.'s work?
The most recent permit on record for Fosh Plumbing and Heating Inc. is dated 2026-03-18, with 42 permits on file in total.
Install two new sinks in Kitchen
Install one dishwasher, one icemaker line, one garbage disposal and one instahot in kitchen.
Install one shower faucet and one shower head in guest bath. Install new lav in guest bath. Set new toilet in guest bath
Install lav faucet and toilet in powder room.City of Philadelphia · 2026
INTERIOR ALTERATIONS TO COMMMERCIAL SPACE. INSTALLATION OF DRAINAGE, WASTE,, VENT, AND WATER SUPPLY FOR LISTED FIXTURES CONNECTING TO AND UTILIZING METALLIC PIPING. VENTING FOR COMMERCIAL SPACES SHALL BE METALLIC TO ROOF EXTENSION AND BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK SYSTEM. NO GREASE WASTE IS BEING GENERATED AND ALL PREPARED FOODS SHALL BE PACKAGED THEREFORE NO GREASE INTERCEPTOR IS REQUIRED. AIR GAPS SHALL BE PROVIDED ON ALL NECCESARY EQUIPMENT. ALL WORK SHALL BE PERFORMED IN STRICT COMMPLIANCE WITH 2018 PPC AND APPROVED PLANS.City of Philadelphia · 2025
Replaced 4" stack from floor of garage up to the 2nd floor bathroom tee fitting and installed clean out tee at the base of the stack. Replacing FIXTURES WITHOUT PIPING two toilets, one kitchen sink and two-bathroom sinks. 5 FIXTURES
Violation L&I File Number: CF-2024-095748City of Philadelphia · 2024
Relocate two lavatories for new vanity cabinet. Change old toilet valve with new stubout and change drain location for shower. Relocate existing shower valve.City of Philadelphia · 2023
(1) Install Showerhead
(1) Install Handheld Device
(1) Install New Wall Hung Sink
Some Fixtures are with piping:
1 shower to get a new P-trap and up to two feet of drain.
1 standpipe for washer to be rerouted slightly.
Some fixtures are without piping:
1 Toilet (water closet) pull and reset
1 Sink (to be replaced)
1 Kitchen Sink / no drain workCity of Philadelphia · 2023
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you Fosh Plumbing and Heating Inc.?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to Fosh Plumbing and Heating Inc.'s website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
25 TOTAL FIXTURES
Install 6 Water Closet / Urinals,
Install 6 Shower / Tubs
Install 2 Basement Hot Water Heaters
Install 1 Gas Stove
Install 1 Pressure Reducing Valve
Install 1 Booster Pump
Install 1 Bar Sink and 1 Ice Machine
Install 2 Hose bibbs
Install 7 Lavatories
Install 1 Kitchen Sink
Install (2) 3' wet stacks
Install 2 Disposals
Install 2 Faucets
Install 1 Dishwasher
Please note: Not doing the bathroom now for the 2nd Floor Powder RoomCity of Philadelphia · 2023
INSTALL 2 WATER CLOSETS, 2 LAVATORIES, 1 COMPARTMENT SINK, 3 COMPARTMENT SINK, 2 GREASE INTERCEPTORS, 7 FLOOR DRAINS, 1 HUB DRAIN, 2 TRENCH DRAINS, 10 FLOOR SINKS, 3 HAND SINKS, 1 MOP SINK, 9 BACKFLOW PREVENTERS AND 1 HOT WATER HEATER ACCORDING TO THE 2018 PPC.City of Philadelphia · 2022
Plumbing Permit (Interior) for combo RP-2021-013110City of Philadelphia · 2022
Plumbing Permit (Interior) for combo CP-2022-001065City of Philadelphia · 2022
For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work.City of Philadelphia · 2022
INSTALLATION OF SIX FIXTURES AS PER PPC 2018City of Philadelphia · 2022
REPAIR/REPLACE 3/4" WATER SERVICE CURB INCity of Philadelphia · 2022
Permitted projects on public record. Addresses are omitted for privacy.