What the public permit record shows, not self-reported reviews.
Is FLATIRON BUILDING COMPANY a real contractor?
FLATIRON BUILDING COMPANY appears in public building-permit records with 176 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is FLATIRON BUILDING COMPANY's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to FLATIRON BUILDING COMPANY by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is FLATIRON BUILDING COMPANY licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. FLATIRON BUILDING COMPANY has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is FLATIRON BUILDING COMPANY's work?
The most recent permit on record for FLATIRON BUILDING COMPANY is dated 2026-05-05, with 176 permits on file in total.
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING HIGHER EDUCATION FACILITY ART GALLERY AS PER APPROVED PLANS. *2018 IEBC REVIEW*City of Philadelphia · 2026
LEVEL II ALTERATIONS FOR THE INSTALLATION OF NEW MECHANICAL SYSTEM. FOR USE AS PREVIOUSLY APPROVED AS PER APPROVED PLANS.City of Philadelphia · 2026
FOR THE ERECTION OF TEMPORARY PARTITION AND EXTERIOR WALL OPENING AS PER APPROVED PLANS.City of Philadelphia · 2025
FOR LEVEL I INTERIOR ALTERATIONS WITHOUT A CHANGE IN USE AND OCCUPANCY CLASSIFICATION TO AN EXISTING ONE (1) STORY DETACHED STRUCTURE (BIN #1465606) CONTAINING TWENTY-FIVE (25) DWELLING UNITS (GROUP R-2). BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR ANY ADDITIONAL ALTERATIONS WORK AND FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. **SEE MI-2025-006468 FOR BBS VARIANCE FOR SUBSTANTIAL IMPROVEMENT WITHOUT REQUIRING THE F.F.E. TO BE ELEVATED TO B.F.E. + 18 INCHES.**City of Philadelphia · 2025
FOR LEVEL II ALTERATIONS WITH NO CHANGE IN OCCUPANCY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.City of Philadelphia · 2025
FOR LEVEL II ALTERATIONS TO BASEMENT LOCKER ROOM AND BREAKROOM IN AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS.
***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you FLATIRON BUILDING COMPANY?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to FLATIRON BUILDING COMPANY's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2025
FOR LEVEL II ALTERATIONS TO AN EXISTING COMMERCIAL BUILDING FOR USE AS AN APARTMENT BUILDING (B OCCUPANCY), ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2025
FOR THE EXTERIOR BUILDING RESTORATION INCLUDING ROOFING/ MASONRY REPAIRS, WINDOW REPAIR AND REPLACEMENT, REPLACEMENT OF EXISTING FIRE ESCAPE, RECONFIGURATION OF EXISTING ADA RAMP, ROOFTOP EQUIPMENT MECHANICAL SCREEN AND INTERIOR RENOVATIONS INCLUDING STRUCTURAL WORK- INTERIOR FLOOR RE-FRAMING PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2025
*ASBESTOS ABATEMENT REQUIRED PRIOR START OF WORK.* FOR REPAIRS AND ALTERATIONS TO AN EXISTING EDUCATION AND TRAINING CENTER (B, E, & A-3) INCLUDING FINISHES, ACCESSIBILITY UPGRADES, AND LEVEL 2 ALTERATIONS AS PER APPLICATION/PLANS AND IN ACCORDANCE WITH THE 2018 IEBC. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, MECHANICAL, AND PLUMBING WORK.City of Philadelphia · 2025
FOR A LEVEL I INTERIOR ALTERATIONS TO AN EXISTING LABORATORY SPACE (LAB #310B). BUILDING IS BE FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
**SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING & FIRE SUPPRESSION WORK**City of Philadelphia · 2025
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2025
LEVEL I EXTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR REPAIRS TO EXISTING SITE WALLS AS PART OF AN EXISTING UNIVERSITY COMPLEX AS PER APPROVED PLANS. NO INTERIOR WORK ON THIS PERMIT. *2018 IEBC REVIEW*City of Philadelphia · 2025
Permitted projects on public record. Addresses are omitted for privacy.