FOR THE COMPLETE DEMOLITION OF THE EXISTING ONE (1) STORY MASONRY STRUCTURE. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY HAND AND WITH HAND TOOLS ONLY. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO START OF WORK. **SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR RIGHT-OF-WAY ENCROACHMENT OR CLOSURE.**City of Philadelphia · 2026
FOR THE COMPLETE DEMOLITION OF EXISTING STRUCTURE. EXISTING STRUCTURE TO BE DEMOLISHED BY A COMBINATION OF HAND-HELD AND MECHANICAL EQUIPMENT PER APPROVED PLANS. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES.
* A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED.
* 21 DAY POSTING AND NOTICE REQUIRED PER A-303.2
* NEWLY EXPOSED WALLS TO BE TREATEDCity of Philadelphia · 2026
FOR THE COMPLETE DEMOLITION OF EXISTING STRUCTURE. EXISTING STRUCTURE TO BE DEMOLISHED BY HAND AND HAND-HELD EQUIPMENT ONLY PER APPROVED PLANS. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES.
* A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED.
* 21 DAY POSTING AND NOTICE REQUIRED PER A-303.2
* NEWLY EXPOSED WALLS TO BE TREATEDCity of Philadelphia · 2026
Full demolition to create vacant lotCity of Philadelphia · 2026
FOR THE COMPLETE DEMOLITION OF AN EXISTING ATTACHED MASONRY AND WOOD ONE-STORY STRUCTURE BY HAND METHODS AND MECHANICAL METHODS USING SMALL EXCAVATOR ON CONCRETE SLAB SECTION ONLY. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. COMPLETE SIDEWALK CLOSURE REQUIRED AS REFLECTED ON APPROVED SITE PLAN AND IN ACCORDANCE WITH SECTION 3306 OF THE IBC. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT.
******************************DUST CONTROL MEASURES TO BE UTILIZED. **********************************************
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2026
Sub Demolition Permit for CF-2026-033161. For the complete demolition of a property as part of the City of Philadelphia Demolition Program. Add'l specs: No sidewalk. (2) stucco c/w 137, 141 N. Robinson. Install new railing on front porch c/w 137 N. Robinson. Erosion control mat with topsoil and seed. 4' corral fence across front.City of Philadelphia · 2026
*MAKE SAFE PERMIT** FOR THE COMPLETE DEMOLITION OF THE EXISTING TWO (2) STORY BUILDING TO COMPLY WITH VIOLATION CASE #CF-2026-019669. DEMOLITION TO BE DONE BY HAND/ HAND TOOLS FOR ROOF/ SECOND FLOOR AND MECHANICAL DEMOLITION METHODS FOR REMAINING PORTION OF BUILDING. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO START OF WORK. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR RIGHT-OF-WAY ENCROACHMENT OR CLOSURE. 21 DAY POSTING & NOTICE WAIVED PER A-303.2. BUILDING PERMIT FOR CONSTRUCTION/ ALTERATION/ EXPANSION WAIVED PER $14-504 (1.1)(b)(.1).City of Philadelphia · 2026
FOR THE COMPLETE DEMOLITION OF AN EXISTING ATTACHED TWO-STORY STRUCTURE BY MECHANCIAL DEMOLITION. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. *A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN TEN (10) FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.City of Philadelphia · 2026
FOR THE COMPLETE DEMOLITION OF AN EXISTING ATTACHED FOUR (4) STORY MASONRY STRUCTURE. STRUCTURE TO BE DEMOLISHED BY BOTH HAND AND MECHANICAL. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO THE START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR SIDEWALK CLOSURECity of Philadelphia · 2026
FOR COMPLETE DEMOLITION OF AN EXISTING I.D. STRUCTURE.City of Philadelphia · 2026
FOR THE COMPLETE DEMOLITION OF AN EXISTING ATTACHED ONE-STORY STRUCTURE BY HAND AND MECHANCIAL DEMOLITION. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. *A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.City of Philadelphia · 2026
FOR THE COMPLETE DEMOLITION OF AN EXISTING ATTACHED MASONRY AND WOOD THREE-STORY STRUCTURE BY HAND AND MECHANICAL METHODS. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. COMPLETE SIDEWALK CLOSURE REQUIRED AS REFLECTED ON APPROVED SITE PLAN AND IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE STREET CLOSURE PERMIT REQUIRED PRIOR TO START OF WORK. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT.City of Philadelphia · 2026
Permitted projects on public record. Addresses are omitted for privacy.