What the public permit record shows, not self-reported reviews.
Is FERGUSON & MCCANN INC a real contractor?
FERGUSON & MCCANN INC appears in public building-permit records with 84 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is FERGUSON & MCCANN INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to FERGUSON & MCCANN INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is FERGUSON & MCCANN INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. FERGUSON & MCCANN INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is FERGUSON & MCCANN INC's work?
The most recent permit on record for FERGUSON & MCCANN INC is dated 2026-03-03, with 84 permits on file in total.
FOR THE GENERAL EARTH DISTURBANCE ASSOCIATED WITH TANK REPAIRS. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLANS.City of Philadelphia · 2026
FOR SITEWORK PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING.City of Philadelphia · 2026
For prescriptive alterations to an existing Gas Station canopy and dispensers, to install new diesel fuel dispenser, replace the existing gasoline fuel dispensers, erect new concrete islands, and replace bollards, as per plans; no other work on this permit; no change to location of canopy; separate electrical permit required.City of Philadelphia · 2022
FOR THE REMOVAL AND REPLACEMENT OF EXISTING FUEL DISPENSER PUMPS.City of Philadelphia · 2021
FOR THE REMOVAL AND REPLACEMENT OF EXISTING FUEL DISPENSER PUMPS.City of Philadelphia · 2021
REMOVAL AND REPLACEMENT OF THREE (3) FUEL-GAS PUMPS ON A NEW FUEL ISLANDS, ALL PER PLANS.
SEPARATE PERMITS FOR ANY MEP WORK.City of Philadelphia · 2021
Remove and replace (4) existing pumps and islands as per approved plans.City of Philadelphia · 2021
ABOVE GROUND TANK REMOVAL, 1-10000 GALLON DIESEL FUEL TANK AND I PUMP
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you FERGUSON & MCCANN INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to FERGUSON & MCCANN INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2019
TANK CLOSURE PERMIT - CLOSURE IN PLACE OF ONE 15,000 GALLON UNDERGROUND STORAGE TANK (UST) PREVIOUSLY USED TO STORE #2 HEATING OIL REMOVE ANY PETROLEUM PRODUCT/WATER. CONDUCT A CONFIRMATORY SOIL SAMPLING OF SURROUNDING SOIL. CONTIGENCY PLAN IN PLACE IN THE CASE CONTAMINATED SOILS DISCOVERED. FILL IN PLACE WITH SAND OR FLOWABLE FILL CONCRETE MIXTURE. ALL WORK COMPLETED IN ACCORDANCE WITH PADEP UST REMOVAL GUIDELINES.
A CERTIFICATION & CLOSURE REPORT TO BE SUBMITTED TO INSPECTOR.City of Philadelphia · 2019
FOR THE REPLACEMENT OF A ONE (1) INCH FLEX PIPING WITH A NEW ONE (1) INCH OPW DOUBLE-WALL FLEX PIPING IN AN EXISTING PIPING CHASE AND FOR AN EXISTING INTERSTITIAL MONITORING DEVICE TO BE CONVERTED TO A BRINE INTERSTITIAL MONITORING DEVICE ON AN EXISTING UNDERGROUND DIESEL STORAGE TANK PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ANY OTHER ALTERATIONS WORK.City of Philadelphia · 2019
TANK REMOVAL, CUT AND REMOVE CONCRETE AS NECESSARY TO REMOVE ALL EXISTING PIPING. REMOVE EXISTING CANOPY.City of Philadelphia · 2019
REPLACEMENT OF (1) CANAPY STRUCTURE INCLUDING INSTALATION OF SHALLOW IN ACCORDANCE WITH APPROVED PLANS. SEPARATE PERMIT REQ'D FOR ANY ELECTRICAL WORK.City of Philadelphia · 2019
Permitted projects on public record. Addresses are omitted for privacy.