Provide wiring for 2 20amp Branch Circuits, 1 for bathroom and 1 for utility room.City of Philadelphia · 2026
Upgrade to 200amp service, install 200amp panel, 200amp meter, 200amp disconnect with main breaker. Grounding and bonding to 2017 NEC,. No additional wiringCity of Philadelphia · 2026
SERVICE WORK ONLY
Digging of trench
Install Vault
Install Transformer
Metering
Install 1 600amp (Panel A) 120/208 3ph 40cir
Install (2) 225amp (Panels R & B)120/208 3ph 40cir
Grounding & Bonding per APPROVED DRAWINGS-2017 NEC CodeCity of Philadelphia · 2025
Install 100amp service with 30cir panel
No additional wiring
Bonding & Grounding per 2017 NEC CodeCity of Philadelphia · 2025
Upgrade service to 600 amps with grounding as per 2017 NEC.
CT(s) and (3) service disconnects are existing.
Install 400 amp breaker in Panel C. Install 200 amp breaker in Panel A. Install 225 amp breaker in Panel B.
No additional loads added to Panels A, b, and C.City of Philadelphia · 2025
Install 400A service w/ two(2) MCB 200A service panels, with all interior wiring for two family dwelling. Install 110v interconnected smoke alarms . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.City of Philadelphia · 2025
1200amp service disconnect, 120/208 3ph, 4w
- 30 Meters (150amp meter pan) 1ph
- 1 TAP Box
- 1 (100amp) Disconnect for fire pump 3ph
- 1(100amp) Meter Pan for fire pump 3ph
- 1 (150amp) house panel 1ph
- 30 (150amp) Main-Lug panel 1ph
- Grounding and Bonding Equipment
- Grounding and bonding per 2017 NEC Code
INSTALLATION SHALL COMPLY WITH 2017 NEC.
Install of Fire Alarm Equipment as per 2016 NFPA 72.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2024
100amp temporary service
100amp Panel and Meter Pan
100 amp double pole breaker
4 -20amp breaker
4 -WRP GFCI outlets
GroundingCity of Philadelphia · 2024
Electrical Permit for combo RP-2021-014689City of Philadelphia · 2024
All wiring will be done according to Plan:
- Install 400amp Service
- Install 400amp Disconnect
- Install all meter pan with disconnect according to Plan
- Install all sub-panels in units
- Total rough wiring/finish
- Total rough wiring of devices
- Install Fire Alarm system
As per 2017 NEC and 2016 NFPA 72City of Philadelphia · 2023
• Rewire the basement lights and outlets (except the bathroom);
• Wire the kitchen and first floor outlets;
• Rewire the 2nd fl. bedroom outlets;
• Wire the third-floor front bedroom and bathroom (new construction walls and ceiling above bathroom).
• Run (1) new 20amp 240V lines to the roof for HVAC (there's access from the 3rd floor balcony
• Run (1) 30amp 240v
• Install one exterior GFI on the ground floor rear
• Install (14) LED puck lights
• Install (4) fixtures in existing locations
• Install (2) new pendant lights in kitchen
• Install (2) ceiling fans in new locations
• Hivemind Construction will buy all fixture
All circuits will be arc fault GFI protected according to 2014/17 NEC code
Grounding and Bonding per 2014/17 NEC code
Fishing of wires throughout propertyCity of Philadelphia · 2023
AMENDMENT: Install 3ph, 120/208, 200amp service disconnect with 3ph meter for (3) commercial spaces according to plan and 2017 NEC.
WIRING OF 1200AMP SERVICE WITH 28 METERS & 28 SUB PANELS
ROUGH WIRING OF 28 UNITS AND FINISHING
WIRING OF ELEVATORS WITH DISCONNECT
WIRING OF FIRE PUMP WITH DISCONNECT, CT CABINET & METERING
WIRING OF FIRE ALARM SYSTEM
WIRING OF HOUSE PANEL WITH DISCONNECT, CT CABINET, & METERING
WIRING OF COMMERCIAL SPACE WITH METERING & CT CABINET
ROUGH WIRING OF COMMERCIAL SPACE AND FINISHING
WIRING FOR OPERATION OF GENERATOR, SWITCH GEAR & HARDWARE
AS PER 2017 NEC AND 2016 NFPA 72City of Philadelphia · 2023