FOR LEVEL II ALTERATIONS WITH NO CHANGE IN OCCUPANCY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.City of Philadelphia · 2025
FOR THE ERECTION OF ONE-STORY STRUCTURE AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP WORK. FOUNDATIONS APPROVED UNDER SP-2024-1301 *2018 IBC*City of Philadelphia · 2025
FOR FOUNDATION WORK ONLY. SPEARATE BUILDING PERMIT REQUIRED FOR THE CONSTRUCTION OF BUILDING. *2018 IBC*City of Philadelphia · 2024
FOR THE DEMOLITION TO PORITION OF EXTERIOR WALL AND REPLACE THEM AS PER APPROVED PLAN. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2024
FOR LEVEL II ALTERATIONS TO AN EXISTING HOSPITAL (I-2 (CONDITION-2) OCCUPANCY), ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
***ASBESTOS REMEDIATION REQUIRED ***City of Philadelphia · 2024
LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO FOURTH FLOOR LABORATORY AND ASSOCIATED MECHANICAL SPACES WITHIN AN EXISTING UNIVERSITY BUILDING (SJU SCIENCE CENTER) AS PER APPROVED PLANS. EXISTING BUILDING SPRINKLERED. *2018 IEBC REVIEW*
**SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**City of Philadelphia · 2024
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
FOR LEVEL 2 ALTERATIONS TO CREATE A PHARMACY SPACE WITHIN AN EXISTING HOSPITAL AS PER PLANS. NO CHANGE IN OCCUPANCY CLASSIFICATION. SEPARATE PERMITS WILL BE REQUIRED FOR ANY MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.City of Philadelphia · 2024
FOR LEVEL II ALTERATIONS ON THE THIRD FLOOR OF AN EXISTING HOSPITAL BUILDING AS PER APPROVED PLANS AND PA DOH APPROVAL. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2024
FOR LEVEL 2 ALTERATIONS TO AN EXISTING HOSPITAL AS PER PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK.City of Philadelphia · 2023
FOR LEVEL 2 ALTERATIONS TO EXISTING MORGUE AS PART OF AN EXISTING HOSPITAL AS PER PLANS.City of Philadelphia · 2023
**Asbestos Abatement required prior to start of work.**
For Level II Alterations within an existing Group I-2 occupancy (Frankford Hospital) within the employee cafeteria on the second floor in an existing five (5) story detached structure, as per plans and PA DOH approval dated 8/3/2022; separate permits required for all MEP/FSP work; no structural work on this permit; building is currently sprinklered throughout in accordance with NFPA 13, with standpipes installed within the exit stairways in accordance with NFPA 14, and with a fire alarm system installed throughout in accordance with NFPA 72; if field conditions vary contact design engineer prior to the start of any work; compliance with Philadelphia Fire and Property Maintenance Codes required prior to occupancy.City of Philadelphia · 2023
FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FURNISHINGS, MILLWORK, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS FOR MEP AND FIRE SUPPRESSION WORK.City of Philadelphia · 2023