What the public permit record shows, not self-reported reviews.
Is ERIC KENNEDY (Al Muhsinun Construction) a real contractor?
ERIC KENNEDY (Al Muhsinun Construction) appears in public building-permit records with 6 permits filed through 2022 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is ERIC KENNEDY (Al Muhsinun Construction)'s track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to ERIC KENNEDY (Al Muhsinun Construction) by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is ERIC KENNEDY (Al Muhsinun Construction) licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. ERIC KENNEDY (Al Muhsinun Construction) has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is ERIC KENNEDY (Al Muhsinun Construction)'s work?
The most recent permit on record for ERIC KENNEDY (Al Muhsinun Construction) is dated 2022-10-06, with 6 permits on file in total.
**Contractor has a NOTARIZED LETTER WITH NO EMPLOYEES, SOLE WORKER**
EZ PERMIT STANDARDS ALTERATIONS - (Plaster removal, drywall installation, painting, kitchen cabinets, vinyl flooring, window installation). For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Structural alteration or repair is expressly prohibited under this permit. Prohibited structural work any modifications to exterior walls, party walls, floor/roof framing or foundations, including underpinning, excavation, and removal of foundation slab. WORK IN THE BASEMENT OR CELLAR IS NOT INCLUDED ON THE EZ ALT PERMIT. Separate permits required for Mechanical, Electric and Plumbing.City of Philadelphia · 2022
For Level III Alterations to fit-out an existing Group M retail tenant space (Suite #100 only) within an existing single-story detached structure, as per plans; separate permits for all MEP/FSP work; building fully sprinklered throughout; no structural work on this permit; see AP#1041797 for use registration permit; no signs on this permit.City of Philadelphia · 2021
MAKE SAFE PERMIT- For REMOVAL/REPLACEMENT OF FIRST FLOOR EXTERIOR FRONT WALL & FRONT PORCH DAMAGED BY VEHICLE IMPACT WITH LIKE IN KIND MATERIALS, 2 X 6 INCH FRAMING WITH BRICK VENEER to resolve case #CF-2020-083414. Abutting sidewalk must be closed with fencing a minimum of 6? in height. Separate Streets Department permit required for sidewalk closure. A separate permit is required for any additional alterations that are not specifically addressed on case #CF-2020-083414.City of Philadelphia · 2021
FOR INTERIOR AND EXTERIOR LEVEL 2 ALTERATION TO ERECTION NEW BRICK FACADE AT THE FRONT AND NEW INTERIOR STAIR AS PER PLANS. NO CERTIFICATE OF OCCUPANCY. SEPARATE PERMITS REQUIRED FOR ALL MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.City of Philadelphia · 2019
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you ERIC KENNEDY (Al Muhsinun Construction)?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to ERIC KENNEDY (Al Muhsinun Construction)'s website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
FOR LEVEL II ALTERATIONS WITHOUT A CHANGE OF OCCUPANCY THROUGHOUT AN EXISTING THREE (3) STORY SEMI-DETACHED STRUCTURE USED AS GROUP R-2 (THREE (3) FAMILY DWELLING), AS PER PLANS; SEPARATE PERMITS REQUIRED FOR ALL MEP WORK; BUILDING IS CURRENTLY NOT SPRINKLERED.City of Philadelphia · 2019
PRESCRIPTIVE ALTERATIONS TO EXISTING THREE STORY BUILDING WITH THREE DWELLING UNITS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ANY M.E.P. WORK.City of Philadelphia · 2019
Permitted projects on public record. Addresses are omitted for privacy.