Break up section of concrete floor in basement and install 3 wye's for first floor toilet, first floor lav and stand pipe in basement for laundry. Rough in new pvc drain lines for toilet, lav and stand pipe. Remove existing outside stack and install new cast iron no hub stack with 4x3 wye for second floor bath. Run 3 inch branch and tie in 2nd floor toilet, lav, soaking tub and shower stall. Run pvc drains to all fixtures. Run new 3 inch pvc vent at the end of the run up and above the roof. Supply and install 50 gallon gas fired power vent water heater in basement.City of Philadelphia · 2020
NEW 4" PVC THROUGH BASEMENT INSTALL 8 FIXTURES 2 VENT STACKS AS PER 2004 PPCCity of Philadelphia · 2019
PLUMBING ALTERATIONS THROUGHOUT AN EXISTING TWO FAMILY DWELLING.City of Philadelphia · 2019
SUPPLY AND INSTALL NEW 4" SANITARY TEE IDEAL BEND & SECTION OF STACK BETWEEN 1ST & 2ND FLOORS ROUGH IN 2ND FLOOR LAUNDRY, TUB, VANITY & TOILET. ALL WORK AS PER 2004 PHILADELPHIA PLUMBING CODE.City of Philadelphia · 2019
FOR THE CONSTRUCTION THROUGHOUT A THREE (3) STORY STRUCTURE, POUR REAR BASEMENT SLAB, FOR A TWO (2) FAMILY HOUSEHOLD LIVING. SIZE AND LOCATION AS PER PLANS.City of Philadelphia · 2018
ROUGH IN NEW POWDER ROOM ON FIRST FLOOR. RUN STACK FROM BASEMENT FOR 2ND FLOOR BATHROOMCity of Philadelphia · 2017
REPLACE CAST IRON MAIN IN BASEMENT AND STACK WITH PVC. ROUGH BASEMENT LAUNDRY, TOILET, TUB AND LAVATORY ON 2ND FLOOR, KITCHEN SINK AND DISHWASHER ON 1ST FLOOR. CONNECT TO EXISTING, CONNECT TO EXISTING WATER HEATER. NEW LINE TO REAR RAIN CONDUCTOR
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2017
DISCONNECT EXISTING 3RD FLOOR BATH, ROUGH IN NEW DRAIN AND WATER LINES FOR LAVATORY AND SHOWER, SET FIXTURESCity of Philadelphia · 2015
RELOCATE EXISTING DRAIN AND WATER LINES TO KITCHEN SINK, RELOCATE POWDER ROOM LINES FOR TOILET AND LAV. INSTALL WALL HUNG TOILET AND LAV, KITCHEN SINK ,DISHWASHERCity of Philadelphia · 2015
RE-ROUGH TOILET, LAVATORY AND SHOWER, RUN 2" PVC STACK FROM BASEMENT TO 2ND FLOOR FOR LAUNDRY. RUN PEX RISERS FROM BASEMENT TO 2ND FLOOR VENT THROUGH THE ROOFCity of Philadelphia · 2014
REMOVE SHOWER, LAV AND TOILET, INSTALL NEW TUB, ATTACH TO EXISTING COPPER DRAIN. RELOCATE COPPER DRAIN AND WATER LINES IN WALL FOR LAV. REMOVE AND CAP 2ND SINK, INSTALL "Y" AND TRAP FOR CONDENSATE LINE IN ATTICCity of Philadelphia · 2014
ROUGH IN NEW TOILET, SHOWER, LAV SINK, STAND PIPE, LAUNDRY TUB AND FLOOR DRAIN IN BASEMENTCity of Philadelphia · 2014
Permitted projects on public record. Addresses are omitted for privacy.