What the public permit record shows, not self-reported reviews.
Is Energy Connection Inc. a real contractor?
Energy Connection Inc. appears in public building-permit records with 47 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is Energy Connection Inc.'s track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to Energy Connection Inc. by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is Energy Connection Inc. licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. Energy Connection Inc. has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is Energy Connection Inc.'s work?
The most recent permit on record for Energy Connection Inc. is dated 2026-01-16, with 47 permits on file in total.
Install new 400 amp electric service install new lights, outlets, per plans.
Install an addressable fire alarm system. In accordance with NFPA 2018 & The Philadelphia Fire Code 2016City of Philadelphia · 2026
Replace the existing Fire Alarm Control Panel (FACP) and the cellular communicator, then reconnect all other existing fire-alarm initiating and notification devices .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.City of Philadelphia · 2025
Electrical Permit for combo CP-2023-006862City of Philadelphia · 2024
Wire 35- new lights, 8- switches, 8- emergency lights/ or exit signs, 25- outlets, 2- 40 amp disconnects for RTU. Replace existing 100 amp panel with new 100 amp MCB panel. Install 1 new 200 amp single phase panel and disconnect with meter as per 2017 NEC. Install 1 new fire panel with 2 - smoke detectors, 2- pull stations, and 6- horn/ strobes as per 2016 NFPA 72.City of Philadelphia · 2024
INSTALL A NEW FIRE ALARM SYSTEM THROUGHOUT. ALL WORK IN ACCORDANCE WITH THE 2017 NEC & 2016 NFPA-72.City of Philadelphia · 2023
Rough and finish wire of sunroom with 5- outlets, 1 fan, and 1 light as per 2017 necCity of Philadelphia · 2022
Install voice control system with hand set, 18- fire phone jacks and modules throughout the stair towers and elevator lobbies. The system will connect to the existing fire alarm system. All work in accordance with the 2017 nec & 2016 nfpa-72.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you Energy Connection Inc.?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to Energy Connection Inc.'s website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2022
Install 24- fire rescue phones to the building and connect to the existing fire alarm panel as per 2016 NFPA 72.City of Philadelphia · 2022
Wire an addressable fire alarm system with 1- panel, 2- power supplies, 25- smoke detectors, 1- annunciator panel, 20- tamper/ flow modules, 15- pull stations, 40- horn/ strobes, and 60- mini strobes as per 2016 NFPA 72.City of Philadelphia · 2022
Electrical re- wire of 12- Type AA residential Apartments with approx. 15- outlets, 8- lights, 6- switches, 1- electric range, and 3- 120 volt carbon/ smoke detectors. Install new 100 amp electric panel with new breakers to replace old panel, in kind as per 2017 nec. Units are on floors 2-13. 1 per floor. Units A03-A13.City of Philadelphia · 2022
Install an addressable fire alarm system with: 1- panel, 5- sac panels, 22- smoke detectors, 12- pull stations, 20- tamper and flow modules, 98- horn/ strobes, 162- strobe only, and 4- duct detectors as per 2016 NFPA 72.City of Philadelphia · 2022
Minor renovation of unit AA on floors 5, 6, 9, 11, 13. New outlets, lighting and wiring to be pulled from existing load center as per 2017 NEC.City of Philadelphia · 2021
Permitted projects on public record. Addresses are omitted for privacy.