What the public permit record shows, not self-reported reviews.
Is EMPIRE WRECKING CO OF READING a real contractor?
EMPIRE WRECKING CO OF READING appears in public building-permit records with 8 permits filed through 2023 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is EMPIRE WRECKING CO OF READING's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to EMPIRE WRECKING CO OF READING by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is EMPIRE WRECKING CO OF READING licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. EMPIRE WRECKING CO OF READING has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is EMPIRE WRECKING CO OF READING's work?
The most recent permit on record for EMPIRE WRECKING CO OF READING is dated 2023-09-11, with 8 permits on file in total.
INTERIOR AND EXTERIOR ALTERATION TO THE REAR PART OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2023
FOR THE COMPLETE DEMOLITION OF AN EXISTING DETACHED STRUCTURE, SIZE AND LOCATION AS SHOWN ON PLAN/APPLICATION.
FOR USE AS VACANT LOT.City of Philadelphia · 2020
FOR THE COMPLETE DEMOLITION OF AN EXISTING DETACHED STRUCTURE, SIZE AND LOCATION AS SHOWN ON PLAN/APPLICATION.
FOR USE AS VACANT LOT.City of Philadelphia · 2020
COMPLETE DEMOLITION OF EXISTING BUILDING LOCATED WITHIN A SPECIAL FLOOD HAZARD AREA (ZONE AR); SIZE & LOCATION AS SHOWN IN APPLICATION. USE REGISTRATION REQ'D PRIOR TO OCCUPANCY.City of Philadelphia · 2016
COMPLETE DEMOLITION, VIA MECHANICAL MEANS, OF EXIST. DETACHED STRUCTURAL STEEL, MASONRY & CONCRETE CONSTRUCTION BUILDING LOCATED WITHIN A SPECIAL FLOOD HAZARD AREA IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN; SAFETY ZONE TO BE MAINTAINED AT ALL TIMES OF DEMOLITION WORK PER PHILA. BLDNG. CODE REQUIREMENTS. MECHANICAL DEMOLITION EQUIPMENT TO PERFORM DEMOLITION WORK FROM EXTERIOR OF BUILDING ONLY. A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQ'D W/IN 7.5 FT. OF BLDG. FACADE PER THE PHILA. BLDG. CODE SEC. 3306; SEPARATE L+I &/OR DEPT. OF STREETS PERMITS MAY BE REQUIRED PRIOT TO START OF WORK.City of Philadelphia · 2016
COMPLETE DEMOLITION OF STRUCTURE - SEPTACity of Philadelphia · 2012
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you EMPIRE WRECKING CO OF READING?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to EMPIRE WRECKING CO OF READING's website. It links to this profile so homeowners can see the public permit record behind your work.