Demo Only of Electrical Cabinets/ Electrical Remotes, Conduit, and Wire of AW and F Parking Garage Cell SitesCity of Philadelphia · 2026
Demolish existing transformer, medium voltage switches, switchgear, and MCCs in main access building electrical buildings and sludge gas facility at Southwest Water Pollution Control Plant- PER APPROVED DRAWINGS-2017 NECCity of Philadelphia · 2026
Disconnect existing and re-feed (14) new RTU's @ E Concourse PHL. Upgrade Fire Alarm and wire new Duct Detectors and Shut Down Relays . all work per approved plans.
MP-2025-001869City of Philadelphia · 2026
Furnish and install fire alarm for new pretzel and pints space in Terminal A East at PHL Airport as per 2016 NFPA 72.City of Philadelphia · 2026
Install (64) CAT6 plenum cables for network connections. Install 18/2 AWG wire for (18) ceiling speakers and (3) sub-woofers. All terminations on CAT6 patch panels and audio equipment in the network rack.City of Philadelphia · 2026
Electrical Permit for combo CP-2026-001063City of Philadelphia · 2026
FOR AN ALTERATION TO A PORTION OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. **FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**City of Philadelphia · 2026
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Furnish & Install upgrade to PHL Video Security Surveillance System, network hardware and cable, CCTV cameras, power wire, CAT6, and fiber throughout Terminals D & E as per 2017 NEC.City of Philadelphia · 2026
Fire Alarm modifications for a Paris Baguette store in Philadelphia International Airport terminal C space 8. PER APPROVED DRAWINGS.City of Philadelphia · 2025
THE MODIFICATION OF THE FIRE ALARM SYSTEM IN THE TENANT SPACE. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND
PER PLANS.City of Philadelphia · 2025
Electrical Permit for combo CP-2025-003814City of Philadelphia · 2025
INSTALL FOUR GENERATORS FOR TEMPORARY WIRING FOR ON SITE POWER. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC.City of Philadelphia · 2025
Permitted projects on public record. Addresses are omitted for privacy.