Replace existing electrical distribution panel with new 225A, 120/208Y distribution panel. Disconnect and remove wiring to existing HVAC equipment and replace with new branch circuit wiring to replacement equipment. Install branch circuit wiring to new equipment. All branch circuit wiring rated 120V, 240V or 208V up to 60A maximum.City of Philadelphia · 2026
INSTALL (2) 15KV SWITCHES, (2) 300 KVA TRANSFORMERS, PANELS, FUSED DISCONNECT SWITCHES, TRANSFORMERS, FEEDERS, TRANSFER SWITCHES & EMERGENCY POWER MG SET. INSTALL LIGHTS NORMAL & EMERGENCY, SWITCHES SENSORS & WIRELESS NETWORK LIGHTING CONTROL SYSTEM. INSTALL RECEPTACLES & POWER FOR THE MISCELLANEOUS EQUIPMENT. PROVIDE POWER FOR THE MECHANICAL, HVAC & ELEVATOR EQUIPMENT. INSTALL THE LOW VOLTAGE WIRING & EQUIPMENT FOR THE SECURITY, COMMUNICATION & DATA/ COM SYSTEMS. ALL WORK IN ACCORDANCE WITH THE 2017 NEC.
***NO FIRE ALARM WORK ON THIS PERMIT.***City of Philadelphia · 2025
Electrical Permit for combo CP-2024-005850City of Philadelphia · 2025
Electrical Permit for combo SP-2025-000178
ELECTRICAL: Provide underground conduit for site lighting and other miscellaneous power receptacles, including conduit and fiber optic cable to support security cameras and fuel fill equipment as per 2017 NEC.City of Philadelphia · 2025
Install all conduit wiring for site lighting and any future systems.
**Any interior wiring will require separate electrical permits**City of Philadelphia · 2025
Electrical Permit for combo SP-2025-000180City of Philadelphia · 2025
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Electrical Permit for combo SP-2025-000179City of Philadelphia · 2025
Electrical demolition and replacement of existing utility transformer, service disconnect and main distribution panel with new equipment for 1200A 208/120V three phase service, with new feeders and panels, emergency generator and automatic transfer switches, demolition and replacement of lighting and branch power devices to include branch circuiting. Provide new telecommunication, clock, public announcement and video surveillance systems, equipment and wiring as per 2017 NEC. Install new fire alarm system as per 2016 NFPA 72.City of Philadelphia · 2025
Electrical Permit for combo CP-2024-004116City of Philadelphia · 2025
INSTALL A 400 AMP SERVICE, (5) GANG METER BANK, (4) 100 AMP PANELS & FEEDERS, (1) 60 AMP PANEL & FEEDER. INSTALL WIRING THROUGHOUT THE COMMON AREAS & FOUR DWELLING UNITS. INSTALL LIGHTS NORMAL & EMERGENCY, SWITCHES, SENSORS, RECEPTACLES, SMOKE & CARBON MONOXIDE ALARMS. PROVIDE POWER FOR THE MECHANICAL & HVAC EQUIPMENT. INSTALL A NEW FIRE ALARM SYSTEM THROUGHOUT. ALL WORK IN ACCORDANCE WITH THE 2017 NEC.City of Philadelphia · 2025
INSTALL A 400 AMP CIRCUIT BREAKER IN THE EXISTING SUBSTATION TV3-2. INSTALL A NEW 400 AMP PANEL & FEEDER DUB-1. RECONNECT THE EXISTING PANEL, TRANSFORMER, DISCONNECTS, PUMP CONTROL PANELS, AHU-1,EF-1 & VSD. PROVIDE FEEDERS TO THE NEW PUMPS & VFD'S. PROVIDE POWER TO THE HVAC & MECHANICAL EQUIPMENT FED FROM THE EXISTING PANELS. INSTALL (3) NEW 100 AMP TEMPORARY PANELS.
INSTALL DUCT DETECTORS CONNECTING TO THE EXISTING FIRE ALARM SYSTEM. ALL WORK IN ACCORDANCE WITH THE 2017 NEC.City of Philadelphia · 2024
INSTALL CONDUIT DUCT BANKS FOR POWER & COMMUNICATIONS. INSTALL (1) NEW 800 AMP CIRCUIT BREAKER IN THE EXISTING SUBSTATION. INSTALL (3) 300 AMP CIRCUIT BREAKERS IN THE EXISTING SUBSTATION, INSTALL CONDUITS & FEEDERS TO (3) VFD"S & 150 HP PUMPS. INSTALL CONDUITS & FEEDERS TO (5) VFD'S & 25 HP COOLING TOWER PUMPS. PROVIDE POWER TO THE BASIN HEATERS & FLOW METER & CONTROLS. INSTALL LIGHTS, SWITCHES, RECEPTACLES & HEAT TRACE & GROUNDING ALL WORK IN ACCORDANCE WITH THE 2017 NEC.
* PHASE ONE.
* THE SWITCHBOARD & PANELS ARE EXISTING.City of Philadelphia · 2024