What the public permit record shows, not self-reported reviews.
Is E-BUILT LLC a real contractor?
E-BUILT LLC appears in public building-permit records with 153 permits filed through 2025 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is E-BUILT LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to E-BUILT LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is E-BUILT LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. E-BUILT LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is E-BUILT LLC's work?
The most recent permit on record for E-BUILT LLC is dated 2025-12-15, with 153 permits on file in total.
FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMO AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS ARTIST STUDIO AND ARTISAN INDUSTRIAL. ALL WORK TO BE DONE PER APPROVED PLANS.
***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
01/06/2026 AMENDMENT: RESTROOMS ORIGINALLY WERE SHOWN AS EXISTING ARE BEING PROPOSED.City of Philadelphia · 2025
FOR LEVEL III ALTERATIONS, ADDITIONS AND CHANGE OF OCCUPANCY PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBIMG AND FIRE SUPPRESSION.
*AMEND 2/21/2025 - REVISE SPECIAL INSPECTION AGENCY PER AMENDED CONSTRUCTION DOCUMENTS*City of Philadelphia · 2024
For the erection of a new, six (6) story attached structure (w/roof access structure for mechanical/green roof access only), to be used as Groups B/R-2/S-2 (Artist Studios (uses as per owner's memo, no uses that can be classified as Groups F-1/F-2, not to be rented out as dwelling units) at 1st-2nd floors, Forty (40) Dwelling Units at 2nd-6th floors, and accessory parking garage at 1st floor, with utilities only within the basement), as per plans; separate permits required for all MEP/FSP work; building to be fully sprinklered throughout in accordance with NFPA 13, with standpipes installed within the exit stairways in accordance with NFPA 14, and a fire alarm system installed in accordance with NFPA 72; if field conditions vary, contact design engineer prior to the start of any work; covered walkway or sidewalk closure shall be required within fifteen (15) feet of the building facade in accordance with Section 3306 in the 2018 IBC (separate building and/or Streets Department permit required prior to start of any work); fire watch required once combustible construction is over 40 feet in height; a site safety plan shall be submitted to the building inspector prior to the start of any construction; see ZP-2022-002270 for zoning/use approval; see SR-2021-008257 for work within the public right-of-way.City of Philadelphia · 2023
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you E-BUILT LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
FOR LEVEL 3 ALTERATIONS TO AN EXISTING HIGH-RISE STRUCTURE OF TYPE IB CONSTRUCTION FOR A RESTAURANT, A VACANT COMMERCIAL SPACE AND EIGHT DWELLING UNITS ON THE GROUND FLOOR AND 61 DWELLING UNITS ABOVE AS PER PLANS. SEPARATE PERMIT IS REQUIRED FOR THE CERTIFICATE OF OCCUPANCY OF THE VACANT SPACE. **11/17/23-AMENDED TO CHANGE THE OWNER AND CONTRACTOR**
**10/25/24-AMENDMENT: Remove commercial space on first floor, replace with dwelling units and the addition of roof decks as per plans.
Refer to zoning permit ZP-2024-007933.
****07/24/25 AMENDMENT: Note location of fire pump room, adding 90min fire rated door and closer to fire pump room, 2-hour fire rating enclosing fire pump room.
01/10/2026 AMENDMENT: FOR THE CHANGE IN BASEMENT LAYOUT FOR THE CONSTRUCTION OF PARTITIONS FOR STORAGE ROOMS, YOGA ROOM,
AND THE INSTALLATION OF HOT TUBE TO INCLUDE DECK AREA. AS PER APPROVED PLANS.City of Philadelphia · 2023
FOR THE CONSTRRUCTION OF A FOUR-STORY STRUCTURE WITH GREEN ROOF AND PRIVATE ROOF DECKS, FOR USE AS TWENTY-SIX (26) DWELLING UNITS, AS PER APPROVED PLANS.City of Philadelphia · 2021
FOR NEW CONSTRUCTION OF DETACHED, THREE-STORY STRUCTURE WITH CELLAR, ROOF DECK, ROOF-DECK ACCESS STRUCTURE AND INTERIOR ACCESSORY PARKING. BUILDING TO BE FULLY SPRINKLERED WITH MINIMUM NFPA 13D. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION.City of Philadelphia · 2021
FOR THE ERECTION OF A DETACHED, THREE-STORY STRUCTURE WITH CELLAR, ROOF DECK AND ROOF DECK ACCESS STRUCTURE PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13D. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION.City of Philadelphia · 2021
FOR INTERIOR LEVEL 2 ALTERATIONS TO THE GROUND FLOOR COMMERCIAL SPACE FOR TENANT FOT OUT FOR OFFICES AS PER PLANS. SEPARATE PERMITS ARE REQUIRED FOR ALL MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPRESSION WORK.City of Philadelphia · 2021
FOR THE ERECTION OF A DETACHED, THREE-STORY STRUCTURE WITH CELLAR, ROOF DECK AND ROOF DECK ACCESS STRUCTURE PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13D. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION.
**AMEND TO CHANGE SPRINKLER SYSTEM TO NFPA 13R**City of Philadelphia · 2021
FOR NEW CONSTRUCTION OF DETACHED, THREE-STORY STRUCTURE WITH CELLAR, ROOF DECK, ROOF-DECK ACCESS STRUCTURE AND INTERIOR ACCESSORY PARKING. BUILDING TO BE FULLY SPRINKLERED WITH MINIMUM NFPA 13D. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION.
**AMEND PERMIT TO CHANGE SPRINKLER SYSTEM TO NFPA 13R**
**AMEND 10/28/25 - REVISED TO ELIMINATE ELEVATOR AND GREEN ROOF PER AMENDED CONSTRUCTION DOCUMENTS**City of Philadelphia · 2021
FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (NFPA 13R) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IRC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2021
FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (NFPA 13R) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IRC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2021
Permitted projects on public record. Addresses are omitted for privacy.