Furnish & install code compliant fire alarm system alterations for ground floor tenant fit out. All work to be perform according to the 2017 NEC and per approved plans.City of Philadelphia · 2026
Rough-In Permit for EP-2026-004084 New Service and distribution, complete electrical fit-out throughout building for 8 townhomes (C1 only). Temp power for construction. Electrical work per 2017 NEC, Fire Alarm per NFPA 72. Reference building permit CP-2025-000271City of Philadelphia · 2026
Rough-In Permit for EP-2026-004120 New Service and distribution, complete electrical fit-out throughout building for 13 townhomes (C4 only). Temp power for construction. Electrical work per 2017 NEC, Fire Alarm per NFPA 72. Reference building permit CP-2025-000274City of Philadelphia · 2026
Rough-In Permit for EP-2026-004111 New Service and distribution, complete electrical fit-out throughout building for 12 townhomes (C2 only). Temp power for construction. Electrical work per 2017 NEC, Fire Alarm per NFPA 72. Reference building permit CP-2025-000272City of Philadelphia · 2026
New service and distribution, generator, fire pump, complete electrical and fire alarm renovations ,fire command center ,throughout building for 141 residential units and common spaces generator . Temp power for construction. Voice, data, AV & security. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.City of Philadelphia · 2026
Rough-In Permit for EP-2026-003682City of Philadelphia · 2026
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Install code compliant fire alarm system for R-2 conversion in fls 17-27. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS -2017 NEC 2016 NFPA 72.City of Philadelphia · 2026
Complete Electrical renovation of existing space, including light fixtures, wiring devices, low-voltage rough in, MEP connections, distribution as per 2017 NEC. Install fire alarm per plans and 2016 NFPA 72.City of Philadelphia · 2026
Perform electrical renovation including selective demolition of existing electrical systems as required. Install a new 800-amp electrical service from the PECO pad-mounted transformer, including service conductors, disconnecting means, grounding, and bonding.
Provide new electrical distribution, including panels, feeders, and branch circuit wiring. Install lighting systems, wiring devices, and connections for mechanical, electrical, and plumbing (MEP) equipment. Furnish and install a security system, including associated wiring and devices.
All work shall be performed in accordance with the 2017 NEC and per approved plans.City of Philadelphia · 2026
Rough-In Permit for EP-2026-001928City of Philadelphia · 2026
Furnish & install new 400A service from existing distribution to new 400A panel for tenant fitout. Connections to (2) WSHPs per plans. All work per NEC 2017 & approved plans. No other electrical work is included. Fire Alarm work is by others and permitted separately.
***NO TENANT FIT-OUT ON THIS PERMIT***
***NO FIRE ALARM ON THIS PERMIT***City of Philadelphia · 2026
Rough-In Permit for EP-2026-001969 Electrical renovation including selective demolition, new 800A service from PECO pad mounted transformer, distribution, lighting, branch wiring, MEP connections, and security systems per approved plans and NEC 2017. Fire alarm system is existing to remain; no new fire alarm work included.City of Philadelphia · 2026