WIRE NEW HOME, CONNECTIONS FOR HVAC KITCHEN APPLIANCES, INTERCONNECTED SMOKE DETECTORS, INSTALL CUSTOMER SUPPLIED LIGHTING FIX CONNECTION FOR ENDLESS POOL 320 AMP SERVICE AS ARCHITECTS DRAWING AS PER NEC 2008 (SFD)City of Philadelphia · 2013
SINGLE FAMILY DWELLING. INSTALL NEW 100A SERVICE & REWIRE SINGLE FAMILY DWELLING TO 2008 NEC,INSTALL (6) INTERCONNECTED SMOKE ALARMS (30) DUPLEX RECEPTS, (18) RECESSED LTS, (2) CEILING FANS, (1) BATHROOM FAN/LIGHT, (15) SWITCHES, WIRE KIT APPLIANCES, WIRE NEW HVAC UNIT(SOUTH DIST)City of Philadelphia · 2011
INSTALL 4.3 KW ROOF MOUNTED SOLAR ARRAY,INSTALL PECO METERING AS REQUIRED,INSTALL NEW GROUND ROD AND #4 COPPER CONDUCTOR TO EXIS PNL,BOND ALL EQUIP W/#6 COPPER,GRD TO NEW ROD,INSTALL POLE 30 AMP BKR IN EXISTING PANEL FOR SOLAR ARRAY INSTALLED AS PER STREAMLINED STANDARDS INSTALLATION OF PV SYSTEMSCity of Philadelphia · 2011
Permitted projects on public record. Addresses are omitted for privacy.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.